午啪啪夜福利无码亚洲,亚洲欧美suv精品,欧洲尺码日本尺码专线美国,老狼影院成年女人大片

個人中心
個人中心
添加客服微信
客服
添加客服微信
添加客服微信
關注微信公眾號
公眾號
關注微信公眾號
關注微信公眾號
升級會員
升級會員
返回頂部
施工合同中英文模板-construction-contract
施工合同中英文模板-construction-contract.doc
下載文檔 下載文檔
地產合同
上傳人:地** 編號:1163788 2024-09-10 5頁 97.50KB

下載文檔到電腦,查找使用更方便

10 金幣

  

還剩頁未讀,繼續閱讀

1、Construction Contract工 程 合 同 PO No.: XXXXXXXBuyer:. Date of signature: 甲方: 簽約日期: Seller: 乙方: This Purchase Order is made by and between the Buyer and the Seller: Whereby the Buyer agrees to buy and the Seller agrees to sell the under mentioned commodity according to the terms and conditions stipulat2、ed below: 甲乙雙方經友好協商,一致就供應下列產品,達成如下條款:1. Scope of Supply and Price 工作范圍及價格明細ItemNo.序號Codes & Standard材料規格型號Qty數量Unit單位Unit Price (RMB)單價(元)Total Price (RMB)總金額(元)1Item, etc. 材料 16530KG2.9047,937.002Item, etc. 材料 5070KG4.8024,336.003Construction cost 邯鄲施工費18,000.004Freight 運費6,000.005Export packing co3、st 出口包裝費13,000.006Third party inspection 第三方檢測費9,500.00合計人民幣金額大寫:壹拾壹萬捌仟柒佰柒拾叁圓整小寫:¥118,773.002. Technical Requirement, Quality Requirement, Standard & Warranty Period:Seller shall carried out the construction in strict accordance with the National Standard and the requirements stipulated in the Techn4、ical Agreement No. _which both party signed (see attached documents). The warranty period shall be 1 year after placement of Goods in service.技術要求、質量要求、技術標準和質保期限: 按國家標準和雙方簽定的技術協議(編號:_見附件)施工,質保期為投產后1年。3. Job Sites: 施工地點: 4. Construction Equipment, Tools & Field Personnel Management: 施工設備工具及現場人員管理:(1)5、 All the construction equipment and tools shall be provided by Seller.所有施工用設備及工具由乙方自帶。 (2) Buyer will coordinate and arrange the electricity and water supply on the site.現場施工用水電由甲方協調安排。 (3) Buyer will be responsible for all the lifting work during the construction on site.現場施工過程中的吊裝工作由甲方負責。(4) Selle6、r shall be responsible for the management of its field personnel safety; Seller should provide reasonable protection and insurance for its personnels safety. All the personnel injury and property damage caused by Sellers failure of management shall be borne by Seller.現場施工人員管理由乙方負責。乙方應對人員的安全等方面提供合理的保7、障,由于乙方管理原因造成的人身傷亡及財產損失由乙方承擔。5. Construction Time, delay and Postpone 合同工期、工期延誤、工期順延:(1) Buyer shall issue a Notice to Seller about the construction one week prior the date of the construction start.甲方提前一周通知乙方施工時間。(2) Construction period will be 15 days from the date of issuance of the order to comme8、nce the construction from Buyer.自甲方發出開工令之日算起,工程工期15天。(3) Construction period may be postponed as Buyer agreed after he certified that the delay not caused by Seller.非乙方原因造成工期延誤,須經甲方確認后工期順延。(4) The start time of the construction shall be subject to the order to commence by Buyer. Seller shall uncondi9、tionally follow the overall project schedule of Buyer. Buyer shall be entitled to evaluate and adjust Sellers construction plan. 開工時間以甲方開工令為準。乙方應無條件服從甲方的整體進度計劃,甲方有權對乙方制定的工期安排進行審核、調整。(5) Liquidated Damage: If seller fails to complete the construction on time as stipulated in the Contract, Seller agre10、es to pay a penalty at the rate of 1% of the Total Value per day of delay. No bonus for early completion.合同工期的延期損失賠償費:工期每延期一天,乙方承擔的工期違約罰款為乙方承包范圍內的工程結算價款的1%。提前工期不予獎勵。6. Standard and method of acceptance inspection: Subject to the requirement in the Attached Technical Agreement.驗收標準、方法: 按照技術協議的要求進行驗收。11、7. Payment Term 結算方式和期限: * (1) 50% of the Total Contract Value will be paid by T/T within 10 working days after the first lot of material arrived at the site and accepted by Buyer, Seller shall provide VAT invoice with the total contract value to Buyer. *第一批材料到現場后經甲方驗收合格,乙方開具合同全額的17%增值稅發票10個工作日內,付合同12、總金額50%。*(2) 40% of the Total Contract Value will be paid by T/T within 10 working days after the construction completed and accepted by Buyer. *施工完成經甲方驗收合格10個工作日內支付合同總金額的40。(3) 10% of the Total Contract Value will be paid by T/T after one year normal operation of the facility and the Warranty Period13、 expired. *剩下的10%作為質保金,設備正常運行1年后付清。(4) In case of the site construction in Iran, Buyer will be responsible for visa, round-trip fares and traveling expense, food and accommodation, and 30 US Dollar daily subsidies for each of Sellers construction personnel on Iran Site. All of the cost will be paid 14、by T/T within 10 working days after the construction completed and Buyer received related bills provided by Seller and accepted these bills.若需乙方前往伊朗項目現場施工,甲方負責乙方施工人員的簽證、往返車旅費、食宿,并補助乙方每人30美金/天。以上費用于現場施工完畢后,乙方提交相關票據,甲方收到票據核實無誤10個工作日內結算。8. Delay and Penalty 違約責任: (1) If there is any defect or mistake o15、f construction quality, Seller shall repair and replace immediately at its own cost. If Seller fails to solve defect or mistake could not be , Buyer shall have right to return the Goods and claim to Seller for loss there caused.如果乙方施工質量出現問題,乙方需無償即時修復或更換,如再不能解決,甲方可向乙方退貨、索賠。(2) In case Sellers constru16、ction can not accomplish as per Buyers project schedule, and failed to keep up with the schedule, thus to seriously influence the whole schedule, or Sellers poor quality of construction resulted Buyers whole project quality could not satisfy Owners quality standard, Seller shall compensate all Buyer17、s loss there caused in addition to the normal delay penalty.如因乙方的原因使該項目的施工不能按照甲方的進度計劃完成,并經甲方糾偏無效且實際影響了甲方的整個工程進度,或因該項目的驗收質量導致甲方整個工程的質量達不到業主質量標準,除扣除正常的工期延期罰款外,經業主認定后乙方應賠償由此給甲方造成的損失。9. Contract price and adjustments 合同價款及調整:(1) Contract price: The contract price is FFP (Firm Fixed Price), include tende18、r documents, technical requirement, drawings, site inspection, risk premium, etc. The contract price will not be adjusted at settlement and during the whole project, if Buyer would not change the design and sign site visa. Contract price will not be adjusted and neither party could change it during 19、contract execution. except the factor listed in Sub article 2.合同價款:合同價款采用固定合同總價的方式確定,招標文件、技術要求、圖紙、現場考察、風險費等等全部包干,甲方不提出設計變更,現場簽證,結算時合同價款不予調整。合同執行過程中其它任何一方不得擅自更改,除下列第2條中規定的調整因素需在結算時進行調整外,合同價款均不予調整。 (2) The adjustment factor of contract price:合同價款的調整因素: a. Change Order issued by Buyer ;甲方發出的變更或指令。b. Ch20、ange of Material: if Buyer need to change the pourable material that Buyer has stipulated in the tender documents due to technical issue, Buyer and Seller would discuss and determine to the adjustment of the Contract Price after verifying the price of the material in the market.材料變更:對于甲方在招標文件中認定的澆注材21、料,如因甲方技術原因需要變更,經市場核實材料價格后,甲方與乙方協商對合同總價進行變更和確認。 10. Material Inspection 材料檢驗: (1) Inspection of Material and Facility: All the material and facility for this project shall be sampled and tested by Seller under supervision and witness of Buyer before putting into use , the sampling and testing shall b22、e in strict compliance to laws and regulations, related standard and codes, and contracts requirement. 材料和設備的檢驗:本工程一切材料設備在用于本工程之前,均應按照法律、法規和有關標準、規范的規定以及本合同的約定,在甲方的監督、見證下,由乙方負責取樣并做試塊。(2) Program of Test:The program of test, including test time, place, method of sampling, and test frequency test items23、 shall be prepared by Seller according to laws and regulations, related standard and codes, and contracts requirement, submitted to Buyer for confirmations, and performed after accepted by Buyer.檢驗內容:材料設備的檢驗時間和地點、取樣辦法、檢驗頻次和內容由乙方根據法律、法規和有關標準、規范的規定以及本合同的約定提出,報甲方確認后施行。(3) Normal Check:Buyer will enter 24、the construction site to supervise the construction quality at any reasonable time, and Seller should provide all the convenience assistance when Buyer enters.隨時檢查:甲方代表在一切合理的時間內均應能進入施工現場對工程質量進行監督,乙方應為他們進入上述場所提供一切便利和協助。11. Settlement of Disputes: 爭議解決 All disputes in connection with this Contract or 25、the execution thereof shall be settled by friendly negotiation. If no settlement can be reached, either Party may be referred to institute legal proceedings to the court located at the prosecutors address, or at the place where the Purchase Contract was executed.解決合同糾紛方式如出現質量問題和工期延后問題,按合同執行或雙方協商解決。協26、商不通,可在甲方所在地通過法律手段解決。12. others其他約定事項:(1) This Purchase Contract is in both Chinese and English. 本合同為中英文雙語合同,如果雙語之間出現任何矛盾,以中文為準。(2) This Purchase Contract shall be made in four originals, one for Seller and three for Buyer. All have the same legal force.本合同一式肆份,甲執三份,乙執一份。(3) This Purchase Contract wi27、ll come to effective once it was signed by the legal persons or their authorized representatives of the two Parties and chopped with the stamps of the two Parties. Fax copy of the Contract signed by the two parties will have the same legal force.本合同雙方代理人簽字蓋章后生效。(4) Technical Agreement and Technical 28、data and documents will be the Attachment of this contract.技術協議和技術資料文件作為本合同的附件。(5) This Purchase Contract will come to effective on Feb 2nd, 2010 and will be expired on Feb 2nd, 2011.本合同有效期限:2010年2月2日至2011年2月2日.Buyer: Companys name: Address: Postcode: Contact: Fax: Tel: Bank: Accounts: Seller:Companys name: Address: Postcode: Contact: Fax:Tel: Bank: Accounts: 甲 方乙 方單位名稱: 單位名稱:單位地址: 單位地址:法人代表: 委托代理人: 法人代表: 委托代理人: 傳真: 電話: 傳真:電話:開戶銀行:工行惠新支行開戶銀行:賬號: 郵編: 賬號: 郵編: Page 5 of 5
會員尊享權益 會員尊享權益 會員尊享權益
500萬份文檔
500萬份文檔 免費下載
10萬資源包
10萬資源包 一鍵下載
4萬份資料
4萬份資料 打包下載
24小時客服
24小時客服 會員專屬
開通 VIP
升級會員
  • 周熱門排行

  • 月熱門排行

  • 季熱門排行

  1. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  2. 建筑公司安全物資供應單位及個人防護用品管理制度.doc
  3. 西安·綠地中心B座幕墻工程超高層單元式幕墻施工組織設計方案(223頁).pdf
  4. 邊坡治理工程錨索錨桿格構梁施工技術交底.doc
  5. 大酒店公共區域及客房區域室內裝修改造工程墻面軟包施工組織設計86頁.doc
  6. 雨、污水管道工程PVC—U雙壁波紋管施工方案(37頁).doc
  7. 熱電聯產機組工程排水槽廢水池防腐施工安全專項方案(12頁).doc
  8. 水利水電工程單元工程施工質量驗收評定表.doc
  9. 園林綠化工程公司檔案管理制度(25頁).doc
  10. 秦皇島市北環路道路改造工程監理大綱(346頁).PDF
  11. 江蘇會展中心幕墻施工組織設計方案,玻璃幕墻,鋁板幕墻(230頁).doc
  12. 幕墻施工組織設計方案(陶板、玻璃幕墻上海)(73頁).doc
  13. 物業公司如何提高業主滿意度、提升服務質量演講課件.pptx
  14. 主廠房回旋鉆鉆孔灌注樁施工方案【19頁】.doc
  15. 融創物業案場可視化指引手冊.pptx
  16. 2018社區商業設計標準.pdf
  17. 杭州 ·長嶺居別墅項目故事線策劃方案.pdf
  18. 融創武義小鎮旅游度假項目故事線營銷推廣方案.pdf
  19. 2020江山悅地產項目故事線構建推廣方案.pdf
  20. 商業管理系統物業工程管理培訓課件(50頁).ppt
  21. 建筑工程項目工作聯系單表格.xls
  22. 購物中心廣場物業公司智能照明系統軟件操作規程(2頁).doc
  1. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  2. 水泥混凝土路面工程施工方案(17頁).doc
  3. 水泥混凝土路面工程專項施工方案(17頁).doc
  4. 2023年版建筑公司30套施工方案編制指南(1041頁).pdf
  5. 建筑公司安全物資供應單位及個人防護用品管理制度.doc
  6. 生態治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  7. 2025預算員最全造價筆記包.zip
  8. 山西長治長豐綜合(43萬方)項目(住宅+酒店+商業+辦公)建筑方案設計(246頁).pdf
  9. 2024年建筑公司機電安裝工程質量創優策劃方案(108頁).docx
  10. 商業街夜市市集U+夜市定位規劃方案(73頁).pptx
  11. 生態治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  12. 地下停車場環氧地坪漆施工方案(19頁).docx
  13. 學生宿舍室外市政道路工程雨水管道工程施工組織設計方案(19頁).doc
  14. 工程施工機械車輛設備租賃合同(12頁).docx
  15. 中建二局-201號辦公質保樓項目檢驗和試驗計劃方案(45頁).doc
  16. 安全生產管理體系及保證措施方案(59頁).doc
  17. 西安·綠地中心B座幕墻工程超高層單元式幕墻施工組織設計方案(223頁).pdf
  18. 蔬菜大棚鋼結構施工組織設計方案(65頁).pdf
  19. 冷卻水塔管道更換安裝施工方案(41頁).doc
  20. 綜合樓中央空調安裝施工組織設計方案(水、多聯機)(166頁).doc
  21. 建筑工程造價失控的原因分析及控制(3頁).docx
  22. 抹灰工程施工方案(水泥砂漿)(20頁).docx
  1. 風機安裝工程施工質量強制性條文執行記錄表(40頁).doc
  2. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  3. 服裝店鋪形象維護細則及獎懲管理制度.doc
  4. 東方國際休閑廣場商業定位與招商提案(51頁).ppt
  5. 建筑[2009]257號關于建立建筑業企業農民工工資保證金制度的通知【5頁】.doc
  6. 城市垃圾中轉站升級改造工程項目可行性研究報告129頁.docx
  7. 湖州市南潯區石淙鎮國土空間總體規劃方案(2021-2035年)(草案公示稿)(39頁).pdf
  8. 河南省城市基礎設升級改造項目可行性研究報告(107頁).doc
  9. 城市220kV電力線路改造工程項目可行性研究報告94頁.doc
  10. 電力公司樁基、墩基施工組織設計方案(38頁).doc
  11. 800MW光伏40MWh儲能光伏示范項目可行性研究報告306頁.pdf
  12. 2023珠海城市主干道道路升級改造工程項目可行性研究報告305頁.pdf
  13. 2023城鎮老舊小區配套基礎設施建設項目可行性研究報告(163頁).pdf
  14. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  15. 2022城市更新改造補短板老舊小區改造項目可行性研究報告(206頁).docx
  16. 2023年城鎮老舊小區改造及配套基礎設施建設項目可行性研究報告(84頁).pdf
  17. 2023生活區城鎮老舊小區改造項目可行性研究報告(附圖)(121頁).pdf
  18. 房產中介公司員工入職業務銷售技能培訓資料合集.zip
  19. 縣城配電網110kV輸變電工程項目可行性研究報告266頁.doc
  20. 水天苑小區地源熱泵空調系統設計方案(149頁).doc
  21. 2023城鎮老舊小區改造項目可行性研究報告(122頁).pdf
  22. 淮南礦業集團棚戶區改造項目八公山新村、和平村室外變配電工程施工組織設計方案(92頁).doc
主站蜘蛛池模板: 常宁市| 蓬莱市| 肇庆市| 长顺县| 叙永县| 甘肃省| 壤塘县| 冀州市| 崇仁县| 阿拉善盟| 台州市| 汉寿县| 安塞县| 宁国市| 灌阳县| 呼伦贝尔市| 夏河县| 青田县| 嵊泗县| 涿州市| 望江县| 内黄县| 莱西市| 许昌市| 鲁山县| 井冈山市| 海门市| 舒兰市| 连江县| 兴化市| 榆树市| 隆林| 霍林郭勒市| 屯门区| 涿州市| 陆良县| 汕头市| 卫辉市| 包头市| 天祝| 治多县|