午啪啪夜福利无码亚洲,亚洲欧美suv精品,欧洲尺码日本尺码专线美国,老狼影院成年女人大片

個人中心
個人中心
添加客服微信
客服
添加客服微信
添加客服微信
關注微信公眾號
公眾號
關注微信公眾號
關注微信公眾號
升級會員
升級會員
返回頂部
xxx工程合同中英文版1
xxx工程合同中英文版1.docx
下載文檔 下載文檔
地產合同
上傳人:地** 編號:1163978 2024-09-10 8頁 36.52KB

下載文檔到電腦,查找使用更方便

10 金幣

  

還剩頁未讀,繼續閱讀

1、xxx engineering contractxxx工程合同Contract No.: 合同編號: Party A: xxxCompany Limited甲方:xxx有限公司Party B:xxx Company Limited乙方:xxx有限公司This contract is made and entered into on the day of , 2014 by the following Parties in .本合同于2014年 月 日由以下當事方在 簽署。Party A: xxx Company Limited, 甲方:xxx有限公司,xxx經營的公司,住所地為xxx,(下稱“2、甲方”),法定代表人:xxxParty B: xxx Company Limited, 乙方:xxx有限公司,一家xxx經營的公司,注冊地址是:xxx,(下稱“乙方”),法定代表人:xxx Party A and Party B are called by a joint name of Both Parties under this contract, each of which is called as A Party.甲方和乙方在本合同項下統稱為“雙方”,單獨稱為“一方”。1.Work Content and Requirements1.工作內容、要求1.1In accordance w3、ith the items stipulated in this Contract, Party B shall conduct the project as per the Project standard and quality standard stipulated by Ministry of Engineering of the Union of xx.1.1依據本合同所限定的條款,乙方應以xx工程部規定的建筑標準和質量要求執行本工程。2.Contract Period2.合同期限2.1Work period for the Road Construction Project: th4、e work shall be completed within 2 month upon signing the Contract. The condition of handover is that the Project Inspection & Acceptance Team constituted by Party A, shall issue the Inspection & Acceptance Sheet after onsite inspection. 2.1本次工程時間周期:合同簽訂后14個工作日內完成,并以甲方組成的竣工驗收小組現場檢驗并出具驗收單為竣工交接條件。2.2 5、This contract shall be implemented after this is duly signed by the legal representatives or authorized representatives of the Parties and stamped with the seals of the Parties, and closed after the onsite acceptance of the Project and Contract payment.2.2 本合同自雙方法定代表人或授權代表人簽字蓋章后生效,現場驗收合格、款項支付完畢后關閉。36、.Health, Safety and Environment Principles (HSE)3.健康、安全和環境原則(HSE)3.1The staff from Party B shall follow the arrangement of Local government and Party A (or its representatives), and comply with the laws and regulations of Myanmar as well as rules and regulations on Health, Safety and Environment (HS7、E) of Party A.3.1乙方工作人員必須聽從地方政府、甲方人員(或代表)的安排,遵守緬甸法律、法規和甲方的安全環境健康規章制度等。3.2Before or during the implementation of this Project, Party B shall acknowledge, avoid and prevent the possible damage of the Project to the surrounding environment and other affiliated facilities, and the resulting losses shall8、 be borne by Party B.3.2在工程實施之前或進行當中,乙方應識別工程可能對周邊環境及原有設施造成的危害,應進行規避和防護,對由此帶來的損失,應由乙方承擔。3.3During the performance of this Contract, Party B shall bear the personal and property losses of Party B or Party Bs personnel injury by itself, if the losses are not caused by Party A.3.3在合同履行過程中,若發生非甲方原因導致的乙方或9、乙方人員人身或財產損失的,由乙方自行承擔。4.Contract Price, Payment and Taxes4.合同價格、付款事宜及稅費4.1As per the stipulated construction contents, both Parties agree that this Contract is a lump sum contract. The contract payment includes all construction costs and related cost for construction preparation and construction impl10、ementation .Please refer to the following table for the details4.1按照本合同所確定的工程內容,甲方與乙方確定本次馬德島崗亭工程為費用總包合同,合同費用包含全部工程施工費用及其他與工程準備、工程執行相關的費用。詳見下表 警務室預算報表(USD)NO.particular QityRate(usd)Amount(usd)123456789101112NO.1234567891011121314NO.12345 The total amount: 費用合計:xxx美金4.2The Contract shall be valued in11、 USD, and the payment shall be settled in equivalent value of KYAT. The exchange rate shall be at the spot exchange rate from USD to KYATon the day of payment by the handling bank of Party A. Unless otherwise specified by Party B and agreed by Party A, Party A shall only conduct payment in accordanc12、e with the bank account of Party B agreed in this contract.Party B shall be responsible for the authenticity, safety and accuracy of its designated account information. If Party A fails to pay or delays payment due to the causes of Party Bs account, all responsibilities and consequences hereof shall13、 be undertaken by Party B itself. The account information assigned by Party B is as follows:4.2本合同以美金計價,以美元或等值緬幣結算。匯率為付款銀行付款當天美元兌緬幣的即時匯率。除非乙方有特別說明并經甲方同意,甲方僅按本合同約定的乙方銀行帳號付款,乙方應對其指定的賬戶信息真實性、安全性、準確性負責。因乙方賬戶的原因造成甲方不能付款或付款遲延的,由此引起的一切責任及后果由乙方自己承擔。乙方指定的賬戶信息如下:Account Name: 賬戶名:Account Number: 賬號:Beneficiar14、ys Bank:收款銀行:SWIFT/BIC Code: 銀行國際代碼:Correspondent Bank:代理銀行:Swift Code of Correspondent Bank 代理銀行國際代碼:Address:地址:Tel 電話:4.3Both Parties shall perform their respective taxation obligations in accordance with the tax laws and regulations of the Union of Myanmar. The Contract Price includes withholding15、 tax and other taxes of Party B. .4.3本合同簽約雙方應依照緬甸國家的相關稅收法律法規,履行納稅義務,乙方在合同總價中包含有預扣所得稅和其他稅費部分。4.4The payment of this Contract shall be conducted in three instalments:4.4本合同付款一次付清,付款方式為電匯:Within 10 working days after signing this Contract, Party A shall make the first payment equals to 30% of the total16、 Contract Price.驗收合格后,甲方向乙方支付全部合同金額。5.Alterations5.變更事宜5.1Party A shall have the right to require increasing the work scope (hereinafter referred to as “Alterations”) on the basis of this Contract.5.1甲方有權在此合同的基礎上,要求增加工作范圍(以下稱之為“變更”)。5.2All the requirements on alteration shall be in the written form,17、 clearly defining necessary alterations. Party B shall submit corresponding work plan, working hours and cost estimates according to the alterations proposed by Party A within 3 working days for the approval of Party A.5.2所有的變更要求均應以書面的方式,清楚地指明所需的變更內容,乙方應在三個工作日內對甲方提出的變更,提交相應的工作計劃、工時和費用估算,供甲方審批。6.Term18、ination of Contract6.合同終止6.1If the termination of this Contract is caused by Party A, Party A shall pay reasonable fees to Party B for the Work (including preparatory work) completed by the date of termination of this Contract. Otherwise, if the termination of this Contract is caused by the breach o19、f Party B, Party A shall not pay for the expenses generated.6.1在因甲方終止合同的情況下,甲方應支付乙方截止合同終止日時已完成的工作(含準備工作)及為此項工作已發生的合理費用。若因乙方違約導致合同終止的,甲方對已經發生的費用不予支付。7.Responsibilities & Duties7.責任與義務7.1Party A and Party B shall guarantee each other that one party shall provide support to and protect the other party 20、from any loss, claim, or responsibility caused by or related to this Contract under the following conditions:7.1甲方和乙方均應相互保證,保護和支持對方在發生以下情況時不受由于本合同或與之相關而產生的任何形式的損失,索賠或責任:a)Injuries and deaths of any employee, representative or subcontractors personnel;a)任何職員,代表或分包方人員的傷亡,b)Property loss of staff, repr21、esentatives or subcontractors personnel;b)職員,代表或分包方人員的財產損失,c)Expenses, losses, or damages indirectly or directly caused by significant, special or accidental event, no matter how it occurs and which form it takes;c)由于重大,特殊或意外(直接或間接)造成的費用,損失或損壞,不論其如何發生的,不論是何種形式。7.2Each party shall be responsible for 22、the loss of any third party caused by its own intention or faults, and undertake related indemnification obligations.7.2雙方應對由于各自故意或過失而造成的任何第三方的損失負責并承擔相關賠償義務。7.3If either party of this Contract has realized any possible accident during the performance of the Contract that cannot be executive, the oth23、er party shall be notified immediately.7.3如果合同雙方任意一方在合同履行過程已意識到任何有可能出現意外而導致合同無法執行的情況時,應立即通知另一方。7.4Party B shall procure the insurances and bear the premiums in accordance with the provisions relating to insurance as specified in the laws of the Union of Myanmar. Party B shall ensure that the aforesa24、id insurances remain effective during the period of validity of this Contract. All the expenses arising from the aforesaid insurances shall be included in the service fees under this Contract and shall be borne by Party B.7.4 乙方應根據緬甸聯邦的相關保險法規的規定辦理各項保險并承擔各項保險費用。乙方應確保上述保險在本合同有效期間內持續有效。辦理上述保險所發生的所有費用應包25、含在本合同項下的總費中,由乙方自行承擔。8.Force Majeure8.不可抗力8.1Force Majeure refers to the events that cannot be predicted by either party of the Contract and their occurrence and consequences cannot be avoided, including but not limited to wars, unrests, fires and natural disasters such as wind, rain and earthquake e26、tc.8.1不可抗力是指合同的任何一方不能預見,對其發生和后果不能避免.并無法控制的事件,包括但不限于戰爭、動亂、火災以及風、雨、地震等自然災害。8.2Any party shall timely notify the other party when it is unable to perform the Contract due to Force Majeure. After gaining the certificate of related authority, the performance of the Contract could be delayed or suspended 27、temporarily. Each party shall notify the other party of actual conditions, and continue to 10perform the Contract after the end or disappearance of Force Majeure. Both Parties can be exempted from some parts or all of the liabilities for breach of the Contract according to the actual conditions. Nec28、essary remedial measures shall be adopted to reduce the loss to the minimum.8.2任何一方由于不可抗力不能履行合同時,應當及時向對方通報。在取得有關機關證明以后,允許延期履行或者暫時不履行合同。各方應把實際情況通知對方, 并在不可抗力停止或消失后繼續履行合同。雙方根據情況可部分或者全部免予承擔違約責任。采取必要的補救措施將損失降到最低程度。9.Applicable Laws & Dispute Resolution9.適用法律及爭議解決方式9.1The laws of Myanmar shall apply to th29、e signing, performance and explanation of this Contract. 9.1本合同的簽訂、履行及解釋均適用緬甸聯邦法律。10.Appendix to the Contract and Others10.合同附件及其他事項10.1. The appendix to this Contract shall be an integral part of this Contract and shall have the same legal effect as the Contract.10.1本合同附件是本合同的有效組成部分,與本合同有同等法律效力。10.30、2. In respect of any matters unmentioned herein, written complementary agreement shall additionally be entered into by both parties after mutual agreement. The written complementary agreement shall be integral part hereof and shall have the same legal effect as the Contract.10.2本合同未盡事宜,經雙方友好協商后,另行簽訂31、書面補充協議。該書面補充協議作為本合同的組成部分,與本合同具有同等的法律效力。11.Language11.語言The Contract shall be written by English. and Chinese. 本合同以英文中文、書寫。12.Copies and Execution of Contract12.合同份數及生效The Contract shall be made in quadruplicate with the same legal effect, and Both Parties shall hold two original copies, respectively32、. This Contract shall take effect after it has been signed and sealed by legal representatives or authorized agents of Both Parties, with the witness of Superintendent (Witness).本合同一式肆份,雙方各執貳份,具有同等法律效力。本合同經雙方法定代表人或授權代表人簽字、蓋章后生效。Party A:甲方: Party B: 乙方: Legal Representative: 法定代表人:Legal Representative:法定代表人:Authorized Representative:授權代表:Authorized Representative:授權代表:Tel:電話:Tel:電話:Fax:傳真: Fax:傳真:Postcode:郵編:Postcode:郵編:Place:地點:Place:地點:Date: 日期: 2014年 月 日Date:日期: 2014年 月 日
會員尊享權益 會員尊享權益 會員尊享權益
500萬份文檔
500萬份文檔 免費下載
10萬資源包
10萬資源包 一鍵下載
4萬份資料
4萬份資料 打包下載
24小時客服
24小時客服 會員專屬
開通 VIP
升級會員
  • 周熱門排行

  • 月熱門排行

  • 季熱門排行

  1. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  2. 建筑公司安全物資供應單位及個人防護用品管理制度.doc
  3. 縣新型智慧城市綜合管理服務平臺可行性及概算方案研究報告(815頁).docx
  4. 西安·綠地中心B座幕墻工程超高層單元式幕墻施工組織設計方案(223頁).pdf
  5. 杭州 ·長嶺居別墅項目故事線策劃方案.pdf
  6. 寶名鎮施工現場安全防火管理制度及班長崗位職責.doc
  7. 邊坡治理工程錨索錨桿格構梁施工技術交底.doc
  8. 2022武漢安嶼那住宅地產項目故事線推廣方案(40頁).pdf
  9. 地產項目故事線梳理創作案例與場景運用培訓課件(82頁).pptx
  10. 雨、污水管道工程PVC—U雙壁波紋管施工方案(37頁).doc
  11. 熱電聯產機組工程排水槽廢水池防腐施工安全專項方案(12頁).doc
  12. 水利水電工程單元工程施工質量驗收評定表.doc
  13. 園林綠化工程公司檔案管理制度(25頁).doc
  14. 2018智造系房地產產品價值梳理故事線方案(46頁).pdf
  15. 秦皇島市北環路道路改造工程監理大綱(346頁).PDF
  16. 江蘇會展中心幕墻施工組織設計方案,玻璃幕墻,鋁板幕墻(230頁).doc
  17. 幕墻施工組織設計方案(陶板、玻璃幕墻上海)(73頁).doc
  18. 2020東莞棠樾別墅故事線提報方案(33頁).pdf
  19. 2020江山悅地產項目故事線構建推廣方案.pdf
  20. 商業管理系統物業工程管理培訓課件(50頁).ppt
  21. 建筑工程項目工作聯系單表格.xls
  22. 購物中心廣場物業公司智能照明系統軟件操作規程(2頁).doc
  1. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  2. 水泥混凝土路面工程施工方案(17頁).doc
  3. 水泥混凝土路面工程專項施工方案(17頁).doc
  4. 2023年版建筑公司30套施工方案編制指南(1041頁).pdf
  5. 建筑公司安全物資供應單位及個人防護用品管理制度.doc
  6. 生態治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  7. 2025預算員最全造價筆記包.zip
  8. 山西長治長豐綜合(43萬方)項目(住宅+酒店+商業+辦公)建筑方案設計(246頁).pdf
  9. 2024年建筑公司機電安裝工程質量創優策劃方案(108頁).docx
  10. 商業街夜市市集U+夜市定位規劃方案(73頁).pptx
  11. 生態治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  12. 地下停車場環氧地坪漆施工方案(19頁).docx
  13. 學生宿舍室外市政道路工程雨水管道工程施工組織設計方案(19頁).doc
  14. 工程施工機械車輛設備租賃合同(12頁).docx
  15. 中建二局-201號辦公質保樓項目檢驗和試驗計劃方案(45頁).doc
  16. 西安·綠地中心B座幕墻工程超高層單元式幕墻施工組織設計方案(223頁).pdf
  17. 蔬菜大棚鋼結構施工組織設計方案(65頁).pdf
  18. 冷卻水塔管道更換安裝施工方案(41頁).doc
  19. 綜合樓中央空調安裝施工組織設計方案(水、多聯機)(166頁).doc
  20. 建筑工程造價失控的原因分析及控制(3頁).docx
  21. 抹灰工程施工方案(水泥砂漿)(20頁).docx
  22. 杭州 ·長嶺居別墅項目故事線策劃方案.pdf
  1. 風機安裝工程施工質量強制性條文執行記錄表(40頁).doc
  2. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  3. 服裝店鋪形象維護細則及獎懲管理制度.doc
  4. 東方國際休閑廣場商業定位與招商提案(51頁).ppt
  5. 建筑[2009]257號關于建立建筑業企業農民工工資保證金制度的通知【5頁】.doc
  6. 城市垃圾中轉站升級改造工程項目可行性研究報告129頁.docx
  7. 湖州市南潯區石淙鎮國土空間總體規劃方案(2021-2035年)(草案公示稿)(39頁).pdf
  8. 河南省城市基礎設升級改造項目可行性研究報告(107頁).doc
  9. 城市220kV電力線路改造工程項目可行性研究報告94頁.doc
  10. 800MW光伏40MWh儲能光伏示范項目可行性研究報告306頁.pdf
  11. 2023珠海城市主干道道路升級改造工程項目可行性研究報告305頁.pdf
  12. 2023城鎮老舊小區配套基礎設施建設項目可行性研究報告(163頁).pdf
  13. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  14. 2022城市更新改造補短板老舊小區改造項目可行性研究報告(206頁).docx
  15. 2023年城鎮老舊小區改造及配套基礎設施建設項目可行性研究報告(84頁).pdf
  16. 2023生活區城鎮老舊小區改造項目可行性研究報告(附圖)(121頁).pdf
  17. 房產中介公司員工入職業務銷售技能培訓資料合集.zip
  18. 縣城配電網110kV輸變電工程項目可行性研究報告266頁.doc
  19. 水天苑小區地源熱泵空調系統設計方案(149頁).doc
  20. 2023城鎮老舊小區改造項目可行性研究報告(122頁).pdf
  21. 淮南礦業集團棚戶區改造項目八公山新村、和平村室外變配電工程施工組織設計方案(92頁).doc
  22. 水泥混凝土路面工程專項施工方案(17頁).doc
主站蜘蛛池模板: 禄劝| 新乡县| 安塞县| 化州市| 晋江市| 海盐县| 呈贡县| 大荔县| 迁西县| 故城县| 同德县| 博白县| 邵阳县| 闸北区| 加查县| 信宜市| 通道| 峨山| 云梦县| 宁阳县| 鹿泉市| 兴城市| 泽州县| 读书| 治县。| 根河市| 大余县| 南城县| 新郑市| 南丰县| 鲜城| 沾益县| 高邮市| 临西县| 韩城市| 武胜县| 那曲县| 隆昌县| 开江县| 辽阳市| 临夏县|