午啪啪夜福利无码亚洲,亚洲欧美suv精品,欧洲尺码日本尺码专线美国,老狼影院成年女人大片

個人中心
個人中心
添加客服微信
客服
添加客服微信
添加客服微信
關注微信公眾號
公眾號
關注微信公眾號
關注微信公眾號
升級會員
升級會員
返回頂部
各部位屋面地下衛生間陽臺車道地面等防水施工方案-伍
各部位屋面地下衛生間陽臺車道地面等防水施工方案-伍.doc
下載文檔 下載文檔
施工專題
上傳人:地** 編號:1192691 2024-09-20 15頁 324.50KB

下載文檔到電腦,查找使用更方便

15 金幣

  

還剩頁未讀,繼續閱讀

1、implemented, the operating environment which does not comply with the safety requirements, workers have the right to refuse to work. Five, the lifting work safety license management 1. the lifting work safety license by the competent departments responsible for the management of the company. 2. this2、 by lifting the Unit received, and conscientiously implement the hoisting and lifting head, operations people, and according to the requirements for approval. 3. the safety operating permits are not allowed to transfer, alter, no off-site use, or expand the scope of uses. 4. the persons listed in th3、e safety operation card should be consistent with the field, when personnel changes should go through the signing procedures and related matters of the transition. 5. the certificate of safe operation of lifting operation does not complete within the allotted time, shall renew the certificate of saf4、e operation of lifting. 6. in the event of relevant meetings, breaks, night work and other special reasons, that corresponds to the job ticket must be issued after approval, the personnel and, other officers will be to replace 7. two promissory notes, exchange equipment Management Department, head o5、f the stock exchange operation. 8. work permits management should establish the ticket file (inventory), the ticket is kept for 3 years. Temporary power supply operation management system, to ensure that the companys safety, strengthen management of temporary electrical safety, avoid personal electr6、ical shock, fire, explosion and electrical hazards, safe, regulate electricity system is formulated. II, scope of application apply to temporary power of company-wide operations and foreign construction electric work. Third, the contents and requirements (a) temporary electrical safety requirements 7、1. Temporary electrical work must apply for temporary power operating license, no temporary power operating license are not allowed to work. 2. distribution boxes, metal boxes, metal switch box installation and electrical normal uncharged metal base, shell must do to protect, such as zero, zero and 8、the zero line should use a separate Terminal Board connections. 3. temporary electricity switchboard, distribution boxes with numbers and measures rain, lighting, must be able to secure close switchboard door, at all levels of distribution boxes shall not be stacked within a 2 m radius of debris and9、 rain protection measures. 4. each electrical device must have a machine, a gate, a leak and a box System. Switch box and the horizontal distance control of fixed electrical equipment should not be more than 3 meters, the protector should match the capacity under the control of the device. 5. when a10、 temporary electric lines overhead, cannot use bare wires, aerial height shall not be less than 2.5 m in the device, outside of not less than 3.5 metres, crossing roads shall not be less than 5 m; reliable protection measures are required when crossing a road, is strictly prohibited in the trees or 11、on scaffolding erected temporary power lines. 6. underground lines must be installed to the flag and safety signs. Cables shall be not less than 0.7 meters deep, through roads likely to be lots of mechanical injuries should take protective sleeve, cover plate, and so on. 7. portable lighting, places12、 such as basements, metal containers, wet, when you must use a safe voltage up to 36V. Transformer 36V prohibited the use of . 3. the temporary electrical permit 30KW or more issued by the engineering equipment management, 30KW electric Management Department opened in four copies, a Security Ministr13、y archives, one for electric charge, a copy to the electricity sector, an electrician.We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to furt14、her strengthen internal controls, play a control post independent oversight role of evaluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance wit15、h law. Deepening the information management to ensure full communication zero resistance. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system applicat16、ion of breadth and depth, play information system on enterprise of Assistant role; to perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application i17、nformation system of capacity and level. Humanistic care to ensure zero. To strengthening Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employ18、ees life; strengthening health and labour protection, organization career health medical, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity 19、of Humanities environment. To strengthen risk management, ensure that the business of zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-s20、aving scheduling, national policy trends, strengthening track, active should; to implementation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedbac21、k of closed ring management, improve risk prevention capacity. To further standardize trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhan22、ce employee evaluation and levels of effective communication to improve performance management. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model ro23、le; to continues to strengthening four good leadership construction, full play levels cadres in enterprise development in the 防水工程施 工 方 案 北京市安達億防水工程有限責任公司2014年11月28日 目 錄各部位防水工程施工方案1一、工程概況1二、編制依據1三、編制目的1四、施工組織及目標1五、施工準備1六、施工流程2七、基本部位及節點防水施工處理方案9八、成品保護措施11九、安全保證及文明施工措施12十、質量保證措施12十一、工程維護及回訪134. the pe24、rsons listed in the temporary electrical permit to work should be consistent with field personnel, when personnel changes should go through the signing procedures and related matters of the transition. 5. in the temporary electrical permit to work is not completed within the stipulated time of elect25、ricity operations, ground-breaking of the applicant to apply for temporary power operating license. 6. in the event of relevant meetings, breaks, night work and other special reasons, job ticket must be issued after approval, the request corresponds to staff and other officers will be in place. 7. w26、ork permits management should establish the ticket file (inventory), the ticket is kept for 3 years. High operation management system in the course of work, aimed at reducing high falls, objects to combat such incidents occur, ensure employee safety, regulations are formulated. II, scope of applicat27、ion apply to the company activities and project work scope of construction, but also into our external contractors and personnel. Three, responsibilities, company management is working at height safety management departments. D, contents, and request 1, referred to in this system fall at height refe28、rs to the height of 2 m above the base level (2 m) fall possible jobs. Working at height is divided into four levels: working at height at an altitude of 2-5 meters, called the high level operations; Height working height of more than 5 meters to 15 meters, as second class at height; Height working 29、height of more than 15 metres to 30 metres, known as the three levels of working at height; Working at height safety management regulations height working height is more than 30 meters, called super high job; Due to work reasons, the company only relates to one, working at height, there is no grade,30、 super high assignment. Once the work above there are three levels of the construction project, in accordance with the provisions of the relevant procedures. 2, where there is one, working at height, of the communication construction safety rules must be strictly adhered to. 3, and all personnel inv31、olved in the construction of working at height must be trained and the climbing permits, without training and aerial work permit-free personnel for aerial work is strictly prohibited. 4, and all had high blood pressure, heart disease, anemia, epilepsy is not suitable for working at height and other 32、personnel shall not engage in working at height. 5, high operating personnel must fasten your seat belt, helmet, clothing to flexible, banned the wearing of hard bottom and nails easy slip-on shoes for working at height. 6, seat belts must be hung on the fixed objects, hanging low, must be higher th33、an the waist, prohibited the use of any substitute in place of seat belts. 7, in adjacent areas, with release of toxic, harmful gases and dust outside the allowed concentrations of chimney and equipment is prohibited for working at height. In the allowed range, should also take effective protective 34、measures. In the more than six-level wind and lightning, heavy rain, fog and other adverse weather conditions affect safety during construction,of backbone backbone role; to full strengthening members youth work, full play youth employees in company development in the of force role; to improve indep35、endent Commission against corruption work level, strengthening on enterprise business key link of effectiveness monitored. , And maintain stability. To further strengthen publicity and education, improve the overall legal system. We must strengthen safety management, establish and improve the educat36、ion, supervision, and evaluation as one of the traffic safety management mechanism. To conscientiously sum up the Olympic security controls, promoting integrated management to a higher level, higher standards, a higher level of development. Employees, today is lunar calendar on December 24, the ox B37、ell is about to ring, at this time of year, we clearly feel the pulse of the XX power generation company to flourish, to more clearly hear XX power generation companies mature and symmetry breathing. Recalling past one another across a railing, we are enthusiastic and full of confidence. Future deve38、lopment opportunities, we more exciting fight more spirited. Employees, let us together across 2013 full of challenges and opportunities, to create a green, low-cost operation, full of humane care of a world-class power generation company and work hard! The occasion of the Spring Festival, my sincer39、e wish that you and the families of the staff in the new year, good health, happy, happy各部位防水工程施工方案一、工程概況工程名稱:XX工程防水施工范圍如下:屋面、地下室側墻、底板、頂板;衛生間、陽臺等有要求的頂棚、衛生間內墻面、空中花園樓面、陽臺入戶花園局部樓面、外墻二、編制依據屋面工程質量驗收規范(GB50207-2012)屋面工程技術規范(GB50345-2012)地下防水工程質量驗收規范(GB50208-2011)建筑工程施工質量驗收統一標準(GB/T50300-2013)三、編制目的編制施工組織設40、計是為了對本防水工程施工的全過程中每一個影響進度、質量、安全的因素和施工步驟進行有效控制,保證合同約定工程質量,滿足設計圖紙、國家有關標準、規程、規范等對防水工程的要求。四、施工組織及目標1、勞動力準備勞動力組織方面,根據總進度計劃的安排,在保證質量和工期的情況下,組成多個作業班,由項目經理根據各階段生產任務安排,提高勞動力計劃,確保工程進度。2、工程質量目標工程質量達到國家規定的合格標準工程質量達到合同規定的標準3、安全目標輕傷事故頻率年度控制在1.5,重傷事故頻率年度控制在0.5,重大傷亡事故頻率控制為零。4、工期目標我公司將根據總包單位總施工進度計劃的要求,集中人力、財力、物力,確保工期41、,按照計劃要求,按期完成防水施工任務。五、施工準備1、施工部位及材料準備序號產品名稱使用部位產品類型技術要求1防水材料屋面防水砂漿20厚1:2水泥砂漿慘入水泥重量3%的硅質密實劑細石砼防水40厚C15細石砼剛性防水層,內摻UEA砼微膨脹劑防水卷材2厚PET防水卷材濕鋪法防水涂料1.5厚聚合物水泥基防水涂料(兼作粘接層)衛生間、陽臺等有防水要求的頂棚防水涂料外墻防水涂料衛生間內墻面防水涂料1.5/2厚聚合物水泥基防水涂料空中花園樓面、陽臺入戶花園局部樓面防水涂料1.5厚聚合物水泥基防水涂料(內摻滲透結晶)防水樓面(衛生間、廚房局部)防水涂料1.5厚JS聚合物柔性防水涂膜 2.0厚聚合物防水涂料(42、內摻滲透結晶)車道坡道地面防水涂膜水泥基滲透結晶型防水涂膜地下室頂板細石砼防水40厚C20細石砼剛性防水層,內摻UEA砼微膨脹劑防水卷材3.0厚BAC防水卷材濕鋪法地下室側板防水卷材2.0厚PET防水卷材濕鋪法地下室底板防水卷材3.0厚BAC防水卷材濕鋪法外墻防水涂料1.5厚聚合物水泥基復合防水涂料2、施工機具:橡膠刮板、油漆涮、鏟刀、抹子、噴燈、墨線盒、小平鏟、掃帚、滾刷、角桶、剪刀、卷尺。六、施工流程1、屋面防水施工:(1)基層要求A、基層已符合以下條件,并辦理驗收、工作面移交手續: B、清除基層表面雜物、油污、砂子,凸出表面的石子、砂漿疙瘩等應清理干凈,清掃工作必須在施工中隨時進行,并修43、補平整表面。 C、陰陽角采用水泥砂漿抹成圓弧角,陰角最小半徑50mm,陽角最小半徑20mm。 D、對基層含水率無要求,基面若有明水,掃除即可施工。 E、各種預埋件已安裝并固定完畢。2)工藝流程 基層清理、濕潤定位、彈線涂刷聚合物水泥基防水涂料節點加強處理大面鋪貼PET防水卷材提漿、排氣長、短邊搭接粘結組織驗收3)施工方法A.基層清理、濕潤:用掃帚、鐵鏟等工具將基層表面的灰塵、雜物清理干凈,干燥的基面需預先灑水潤濕,但不得殘留積水。B 抹水泥(砂)漿:其厚度視基層平整情況而定,鋪抹時應注意壓實、抹平。在陰角處,應抹成半徑為50mm以上的圓角。鋪抹水泥(砂)漿的寬度比卷材的長、短邊宜各寬出100344、00mm,并在鋪抹過程中注意保證平整度。C節點加強處理:在節點部位(如:陰陽角、施工縫、后澆帶、變形縫、穿墻管道)先做加強層。D 大面鋪貼PET防水卷材:揭除自粘防水卷材下表面隔離膜,將卷材鋪貼在已涂刷聚合物水泥基防水涂料的基層上。第一幅卷材鋪貼完畢后,再涂刷聚合物水泥基防水涂料,鋪設第二幅卷材,以此類推。(邊涂刷聚合物水泥基防水涂料、邊鋪貼PET防水卷材)E提漿、排氣:用木抹子或橡膠板拍打卷材表面,提漿,排出卷材下表面的空氣,使卷材與聚合物水泥基防水涂料緊密貼合。F 長、短邊搭接粘結:根據現場情況,可選擇鋪貼卷材時進行搭接或在水泥漿具有足夠強度時再進行搭接。搭接時,將位于下層的卷材搭接部位的45、透明隔離膜揭起,將上層卷材平服粘貼在下層卷材上,卷材搭接寬度不小于60mm。G 卷材鋪貼完畢后,將卷材收頭、管道包裹等部位可用密封膏密封。2、地下室(頂板、側板、底板)施工:(1)、地下室防水工藝流程混凝土墊層(含無條基部分) 1:3水泥砂漿找平層 轉角處附加層 鋪平面卷材 鋪立面卷 檢查驗收合格 保護層。(2)、卷材粘貼采用空鋪法或濕鋪法施工。A、混凝土墊層本工程采用的是條形基礎,局部位置無基礎,為防水需要,在無基礎部分同樣按有基礎部分施工同樣強度的混凝土墊層。B、找平層找平層采用1:3水泥砂漿。找平層必須平整,無梭角或突出尖銳部分,有轉角部位作成圓弧。C、鋪卷材(濕鋪法)基層檢驗、清理涂刷46、基層處理劑或水泥砂漿粘接劑試鋪、定位、彈基準線抹水泥砂漿鋪貼BAC防水卷材輥壓、排氣搭接縫密封材料封邊收頭固定、密封(保護層施工)清理、檢查、驗收。a、基層處理: 施工前要認真清掃基層余渣、塵土及雜物,同時基層要求潔凈、平整,干燥,含水率在9%以內,干燥排水坡度應符合設計要求。b、 陰陽角處理:基層陰陽角處應做成R=5cm的倒角,且整齊平順。c、涂刷水泥砂漿:在干燥的基層上涂刷水泥砂漿,要求均勻一致,一次涂好。d、卷材鋪貼: 先把防水卷材按位置擺正,剝開卷材脊面的隔離紙,將卷材粘貼與基層表面,卷材長邊和短邊塔接寬度均應保持100mm,上下層及相鄰兩幅卷材鋪貼的塔接縫應錯開,卷材要求保持自然狀態47、,不要拉的過緊,卷材鋪貼后,立即用壓輥全面壓實,垂直部位用橡膠榔頭敲實。e、 隨后用壓輥滾壓,使卷材與基層或與卷材粘貼牢固,滾壓時不要卷入空氣和異物,要求壓實壓平,不得有空鼓、皺折。f、端頭和收頭密封:可用密封膏或橡膠瀝青膠粘劑與填料現場配置,嵌填后抹平,必須保證嵌填密實、連續、飽滿、粘貼牢固,無氣泡、開裂、脫落,縫邊應順直,表面應平滑,無凹凸不平的現象。(3)、保護層卷材部分驗收合格后,施工20mm厚1:2.5水泥砂漿保護層。表面應抹平壓光,分格縫間距1.5m。3、卷材防水的施工及質量預控鋪貼卷材時要處理好細部節點、泛水收頭的包裹和封口處理。應根據細部節點的實際形狀放樣,將同一類型的細部節點48、防水卷材割成統一的外形尺寸。做到細部附加層不外露,搭接縫位置順當合理。a、水落處封口處理:先貼節點附加層,將長度與出水口長度相同的卷材伸入口內滿貼,入口周邊留置80mm寬的卷材封口,再用屋面卷材層覆蓋水落口,使卷材接縫位置設在洞口棱角上使封口嚴密不翹邊。b、樓梯間的根部:先鋪節點附加層,附加層鋪在屋面上的寬度100mm,貼在墻根立面上的高度200mm,再用屋面卷材層覆蓋,收頭高度250mm,收頭裁割平直,并用壓條釘壓,釘距均勻800mm。4、細部施工處理措施:附加層卷材寬度一般為250 mm,可依據具體情況適當增加。附加層卷材鋪貼時,不要拉緊,要自然松鋪無皺折即可。陰陽角處附加一道卷材,詳見附49、圖。陰陽角處的基層涂膠后要用密封膏涂封距角每邊100mm,再鋪一層卷材附加層,附加層卷材要剪成如下圖形狀。鋪貼后剪縫處用密封膏封固。5、衛生間墻面、空中花園樓面、陽臺入戶花園局部樓面、防水樓面、外墻施工工藝(聚合物水泥基防水涂料)(一)施工工藝流程:(二)施工工具:清理基面工具:開刀、鑿子、錘子、鋼絲刷、掃帚、抹布;取料配料工具:臺秤、水桶、稱料桶、拌料桶、攪拌器、剪、刀;涂覆工具:滾子(用于涂覆較稀的料和大面積平面施工)刷子(用于涂覆較稠的料及小面積局部施工)(三)基面要求: 基面要求必須平整、牢固、干凈、無明水、無滲漏、凹凸不平及裂縫處須先找平,陰陽角、女兒墻、下水管及衛生間內排水設施等重50、要防水部分應作特殊專項處理。(四)材料配比:按重量配合比為:液料:粉料=1:1.5,先將液料用攪拌器攪拌,邊攪拌邊徐徐加入粉料,充分攪拌均勻直至不含直至不含團料。攪拌均后須在1小時內用完,以防沉淀結皮,而影響施工效果。(五)施工方法:用滾子或刷子涂覆,按照設計要求該工程防水層為1.5mm厚,按JS防水涂料施工要求1.5mm厚由至少兩遍涂膜組成。由底層(第一層)上層(第二層或第三層)的次序逐層完成。各層之間的時間間隔以前一層涂膜干固不粘為準(不上人施工約需3小時,上人施工約需5小時)。現場溫度低,濕度大,通風差,干固時間長些,反之短些。涂覆時應注意以下事項:a:施工前一定要清理干凈基面,使找平層51、面層無松散雜物和積水。若涂料(尤其是打底料)有沉淀隨時攪拌均勻,每次蘸料時,先在桶底部攪動幾下,以免沉淀;b:涂覆要盡量均勻,不能有局部沉積;并要求多滾刷幾次使涂料與基層之間不留氣泡,粘結嚴實;c:陰陽角位置做無紡布加強層鋪貼時一定要粘貼平整,不得有起泡或打皺現象。d:每層涂覆必須按規定用量取料,切不能過厚或過薄,若最后防水層厚度不夠,可加涂一層或數層。e:建筑物陰角位置施工找平層時應做成圓弧,以便無紡布鋪貼平整。(六)、聚合物水泥防水施工大樣圖如下(墻面):注:空中花園樓面、陽臺入戶花園局部樓面所用材料為聚合物水泥基滲透結晶型防水涂料(內摻滲透結晶),施工方法同上。6、車道坡道地面(水泥基滲52、透結晶型防水涂料)(1)、基面要求:基面要求必須平整、牢固、干凈、無明水、無滲漏、凹凸不平及裂縫處須先找平,滲漏處須先進行堵漏處理,陰陽角、下水管排水設施等重要防水部分應作特殊專項處理。(2)、施工工具:清理基面工具:開刀、鑿子、錘子、鋼絲刷、掃帚、拖把;取料配料工具:水桶、拌料桶、攪拌器、剪、刀;涂覆工具:滾子(用于涂覆較稀的料和大面積平面施工)刷子(用于涂覆較稠的料及小面積局部施工)(3)、材料調配:先在拌料桶中加入1/3桶水,邊攪拌邊徐徐加入粉料,充分攪拌均勻直至不含團料。攪拌均勻后須在1小時內用完,以防沉淀結皮,而影響施工效果。(4)、施工方法:a、用滾子或刷子涂覆,一般作為迎水面及背53、水面防水涂刷兩遍,由底層(第一層)上層的次序逐層完成。b、各層之間的時間間隔以前一層涂膜干固不粘為準(不上人施工約需3小時,上人施工約需5小時)。c、現場溫度低,濕度大,通風差,干固時間長些,反之短些。d、該工程設計迎水面防水層厚度為1mm,背水面防水層厚度為0.8mm。依現施工方法,涂刷兩遍可以達到設計要求。如若厚度不夠,可以加涂一層或數層。(5)、涂覆時應注意以下事項:a、施工前一定要清理干凈基面,無松散雜物和積水,若基面過于干燥灑少許水濕潤。b、底層涂料比面層涂料攪料要略稀,面層涂料略稠些。c、涂料(尤其是打底料)有沉淀隨時攪拌均勻,每次蘸料時,先在桶底部攪動幾下,以免沉淀。d、涂覆要盡54、量均勻,不能有局部沉積;并要求多滾刷幾次使涂料與基層之間不留氣泡,粘結嚴實。e、每層涂覆必須按規定用量取料(每次拌料不超過一包粉料用量),切忌一次攪料過多,已凝固的漿料不可加水攪拌后再用。施工完f、6小時后視情況應加強養護(養護三天),每天用噴霧器灑水養護兩七、基本部位及節點防水施工處理方案1、基本部位(1) 裂縫處理(若有)首先對基層嚴格檢查,查找出寬度大于0.4mm裂縫,作出明顯標志。將裂縫鑿成“V”型槽,孔距300mm500mm埋設注漿咀進行壓力注漿注入改性環氧樹脂漿液,再用聚合物砂漿進行抹平“V”型槽,見下圖。(2) 陰陽角處理陰陽角處用聚合物砂漿做成50園角,增設300300防水附加55、層一道。2、節點部位(1) 預埋套管穿墻面防水處理穿過防水層的管道預理套管,套管中間焊接止水鋼板,管道安裝完成后,用石棉水泥填實,兩端用膠泥密封材料密封,迎水面設附加防水層一道。 (2) 變形縫大樣(3) 管道穿樓板防水處理穿過防水層的管道四周找平層應按規范要求施工,與基層交接處預留凹槽,填密封油膏,再將管道四周除銹、打光、然后在管口四周300mm范圍內及管面100mm高范圍內做聚氨脂防水附加層一道。八、成品保護措施成品保護是防水工程成敗的關鍵,為確保防水工程達到理想的效果,對于成品保護必須特別注意:1、在防水層施工中或防水層已完成而保護層未完成時,是成品保護的最關鍵時期。在此其間,嚴禁任何無56、關人員進入現場,嚴禁穿帶鐵釘、鐵掌的鞋進入現場,以免扎傷防水層。必須的人員、物料進入,必須遵守輕拿輕放的原則,嚴禁尖銳物體撞擊扎傷防水層。2、在保護層完成之前,其它工序的工人未經允許,嚴禁進入防水施工現場。3、防水層施工完畢后,嚴禁在防水層上隨意開洞或鉆孔安裝機器設備。如不得已必須在防水層上開洞、鉆孔的,必須先征得防水公司同意,并安排妥善的修補工作。4、落水口處應經常清理,以免堵塞,造成排水不暢,以減少防水層的壓力。5、在使用過程中,如發現防水層遭到破損,應盡快通知有關方面及時安排維修。6、穿過墻體的管根,施工中不得碰撞變位。7、防水層施工完成后,應及時做好保護層、保護墻。九、安全保證及文明施57、工措施1、“安全生產,預防為主”是施工現場的基本方針。嚴格執行國家有關安全生產的規定,按照“建設工程施工現場管理規定”實施細則執行。2、認真貫徹安全生產防火制度。防水材料是易燃品,要設防火標志,施工現場要建立用火申請制度。3、不得在雨天或三級以上大風條件下進行外墻防水施工。4、所有操作人員要穿統一服裝,服裝要有明顯的標志。5、全體現場施工人員必須衣著整齊,不得赤膊、穿背心、穿拖鞋開工,不得抽煙、講粗話、隨地吐痰、隨地大小便等。十、質量保證措施1、嚴格按照操作規程、技術方案施工,對施工過程中出現的技術問題及時處理,嚴格把好質量關。2、所有進場的防水材料,必須有檢驗合格證、產品檢驗證。3、大面積施58、工應先做樣板,待建設單位認可后才能大面積施工。4、設專人負責技術工作,確保涂刮環節或噴灑環節操作質量,發現問題及時處理。5、施工完的防水層,表面不得脫落、開裂、起鼓等現象。6、節點密封嚴密,做法符合施工組織設計要求。7、防水工程驗收,其中“保證項目,檢查項目,實測項目”必須嚴格按照技術規程要求進行驗收。8、防水工程完畢后,應將防水資料整理成冊,裝檔移交建設單位存檔。十一、工程維護及回訪本公司承諾,講信譽,信守合同,工程質量實行五年保證期制度。在保證期內每年雨季對工程進行回訪。如有問題,及時處理,同時也要求建設單位建立制度,專人管理,合理使用,防止人為的造成破損和滲漏,減少不應有的經濟損失。第 13 頁
會員尊享權益 會員尊享權益 會員尊享權益
500萬份文檔
500萬份文檔 免費下載
10萬資源包
10萬資源包 一鍵下載
4萬份資料
4萬份資料 打包下載
24小時客服
24小時客服 會員專屬
開通 VIP
升級會員
  • 周熱門排行

  • 月熱門排行

  • 季熱門排行

  1. 建筑鋼筋平法培訓課件.ppt
  2. 2023東城街城鄉結合示范帶建設項目可行性研究報告(248頁).pdf
  3. 工業廠房及附屬設施綜合樓輪扣式高支模腳手架專項施工方案(60頁).docx
  4. 再生水廠配套管網工程項目有限空間作業事故應急救援預案.doc
  5. 田螺山河姆渡文化遺址生活館室內設計方案(247頁).pdf
  6. 智慧城市項目可行性研究報告(257頁).doc
  7. 華為公司干部任職資格管理制度.doc
  8. 沁源綠化園林工程公司ISO質量手冊和程序文件匯編65頁.doc
  9. 科學技術新館鋼結構工程桁架制作及桁架預拼裝施工方案44頁.doc
  10. 2023城市水廠工藝升級改造工程可行性研究報告108頁.pdf
  11. 嘉善縣陶莊鎮國土空間總體規劃方案(2021-2035年)(草案公示)(58頁).pdf
  12. 五星級酒店室內裝修改造工程施工組織設計方案(187頁).doc
  13. 雙遼電廠一期配電室基礎及上部結構施工方案(24頁).doc
  14. 排水溝清淤施工方案(25頁).pdf
  15. 松林西岸房地產項目可行性研究報告(160頁).pdf
  16. 張家港華芳高層住宅開發項目可行性研究報告(77頁).pdf
  17. 中建瀛園山藝小區磚混結構施工組織設計方案(83頁).doc
  18. 土建、裝飾、維修改造等零星工程施工組織設計方案(187頁).doc
  19. 小學操場塑膠跑道和人造草坪施工組織設計方案(207頁).docx
  20. 盱眙垃圾焚燒發電廠鋼結構工程500T吊車鋼結構吊裝專項施工方案(40頁).doc
  21. 辦公樓無線網絡WiFi方案【28頁】.doc
  22. 裝修裝飾公司建筑裝修合同范本(3頁).doc
  1. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  2. 田螺山河姆渡文化遺址生活館室內設計方案(247頁).pdf
  3. 建筑工程公司資料員取證培訓課件(307頁).ppt
  4. 水泥混凝土路面工程施工方案(17頁).doc
  5. 水泥混凝土路面工程專項施工方案(17頁).doc
  6. 建筑公司安全物資供應單位及個人防護用品管理制度.doc
  7. 生態治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  8. 建筑鋼筋平法培訓課件.ppt
  9. 2025預算員最全造價筆記包.zip
  10. 山西長治長豐綜合(43萬方)項目(住宅+酒店+商業+辦公)建筑方案設計(246頁).pdf
  11. 施工企業安全技術交底范本大全(361頁).pdf
  12. 2024年建筑公司機電安裝工程質量創優策劃方案(108頁).docx
  13. 2023東城街城鄉結合示范帶建設項目可行性研究報告(248頁).pdf
  14. 生態治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  15. 工業廠房及附屬設施綜合樓輪扣式高支模腳手架專項施工方案(60頁).docx
  16. 2021房地產公司創新建筑立面設計研發手冊(50頁).pdf
  17. 學生宿舍室外市政道路工程雨水管道工程施工組織設計方案(19頁).doc
  18. 綜合性大樓玻璃幕墻、鋁合金門窗、玻璃地彈門、金屬板幕墻、石材幕墻、雨棚、欄桿施工方案【174頁】.doc
  19. 智慧城市項目可行性研究報告(257頁).doc
  20. 土建、裝飾、維修改造等零星工程施工組織設計方案(187頁).doc
  21. 杭州 ·長嶺居別墅項目故事線策劃方案.pdf
  22. 住宅樓施工組織設計書(137頁).doc
  1. 風機安裝工程施工質量強制性條文執行記錄表(40頁).doc
  2. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  3. 服裝店鋪形象維護細則及獎懲管理制度.doc
  4. 東方國際休閑廣場商業定位與招商提案(51頁).ppt
  5. 建筑[2009]257號關于建立建筑業企業農民工工資保證金制度的通知【5頁】.doc
  6. 城市垃圾中轉站升級改造工程項目可行性研究報告129頁.docx
  7. 湖州市南潯區石淙鎮國土空間總體規劃方案(2021-2035年)(草案公示稿)(39頁).pdf
  8. 河南省城市基礎設升級改造項目可行性研究報告(107頁).doc
  9. 城市220kV電力線路改造工程項目可行性研究報告94頁.doc
  10. 800MW光伏40MWh儲能光伏示范項目可行性研究報告306頁.pdf
  11. 2023珠海城市主干道道路升級改造工程項目可行性研究報告305頁.pdf
  12. 2023城鎮老舊小區配套基礎設施建設項目可行性研究報告(163頁).pdf
  13. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  14. 2022城市更新改造補短板老舊小區改造項目可行性研究報告(206頁).docx
  15. 2023年城鎮老舊小區改造及配套基礎設施建設項目可行性研究報告(84頁).pdf
  16. 2023生活區城鎮老舊小區改造項目可行性研究報告(附圖)(121頁).pdf
  17. 縣城配電網110kV輸變電工程項目可行性研究報告266頁.doc
  18. 水天苑小區地源熱泵空調系統設計方案(149頁).doc
  19. 2023城鎮老舊小區改造項目可行性研究報告(122頁).pdf
  20. 田螺山河姆渡文化遺址生活館室內設計方案(247頁).pdf
  21. 淮南礦業集團棚戶區改造項目八公山新村、和平村室外變配電工程施工組織設計方案(92頁).doc
  22. 建筑工程公司資料員取證培訓課件(307頁).ppt
主站蜘蛛池模板: 二手房| 富平县| 尚志市| 雷山县| 宣汉县| 兖州市| 秭归县| 长阳| 古浪县| 凤山市| 兴城市| 南部县| 祁连县| 临海市| 聂荣县| 敦煌市| 宕昌县| 广汉市| 渝北区| 莱州市| 闽侯县| 海林市| 平顺县| 额尔古纳市| 万盛区| 芜湖市| 平凉市| 栾川县| 常山县| 新和县| 抚州市| 长子县| 桂阳县| 道孚县| 通榆县| 青河县| 镶黄旗| 屏山县| 山阳县| 高碑店市| 剑阁县|