新能源汽車生產項目可行性研究報告2015(46頁).doc
下載文檔
上傳人:故事
編號:305599
2022-03-10
45頁
113.50KB
1、ed as little as possible instruments tostraight into the engine room, can save every layer of management distribution frame.D. administrative zones subsystem management area using 110AB2 wiring rack, slot, reel and jumper for connecting trunks and twisted each clients level and fully installed in th2、e corresponding box is equipped with wall-mounted protection. Admin area with 110AB2-100F-MDF construction management subsystem. 110 series line per 25 to one row,110-100 on the wire rack can end up 24 points of information. Each management point, and are equipped with the appropriate jumper CCW-F-13、PR, CCW-F-2PR twin/two jumpers, the two fastest-jumper for jumper connection changes. E. device subsystem device subsystems namely telephone room and computer room fromcables between devices, adapters and related hardware, equipment network connecting various devices in public. Main distribution frame, the jumpers and the enclosures. All cables are brought together to新能源汽車生產項目項目建議書二一五年 月straight i