午啪啪夜福利无码亚洲,亚洲欧美suv精品,欧洲尺码日本尺码专线美国,老狼影院成年女人大片

個(gè)人中心
個(gè)人中心
添加客服微信
客服
添加客服微信
添加客服微信
關(guān)注微信公眾號(hào)
公眾號(hào)
關(guān)注微信公眾號(hào)
關(guān)注微信公眾號(hào)
升級(jí)會(huì)員
升級(jí)會(huì)員
返回頂部
W鍋爐主要施工組織設(shè)計(jì)方案(8頁(yè))
W鍋爐主要施工組織設(shè)計(jì)方案(8頁(yè)).doc
下載文檔 下載文檔
其它文檔
上傳人:正*** 編號(hào):436849 2022-07-07 8頁(yè) 128.50KB

下載文檔到電腦,查找使用更方便

10 金幣

  

還剩頁(yè)未讀,繼續(xù)閱讀

1、海薩2x600MW鍋爐主要施工方案Hisar2600MW Boiler Main Erection Plan本期建設(shè)規(guī)模2600MW燃煤發(fā)電機(jī)組。鍋爐由提供。鍋爐為亞臨界參數(shù)、強(qiáng)制循環(huán)、一次中間再熱、單爐膛平衡通風(fēng)、固態(tài)排渣、露天布置、全鋼構(gòu)架的型汽包爐。This project is 2600MW coal fired thermal units, boiler shall be supplied by SEC. The boiler is all steel structural type drum boiler of a subcritical parameter, pump circu2、lation, single reheat, single furnace balance draft, dry slagging and hypaethral placement. 鍋爐施工方案 Boiler Erection Plan鍋爐為上海電氣集團(tuán)生產(chǎn)的亞臨界參數(shù)、強(qiáng)制循環(huán)、一次中間再熱、單爐膛平衡通風(fēng)、固態(tài)排渣、露天布置、全鋼構(gòu)架的型汽包爐。The Boiler shall be supplied by SEC. The boiler is all steel structural type drum boiler of a subcritical parameter, pump c3、irculation, single reheat, single furnace balance draft, dry slagging and hypaethral placement.1 施工場(chǎng)地及主吊機(jī)械 Erection site and main hoisting equipments1.1 施工場(chǎng)地布置 Erection site plot鍋爐組合場(chǎng)布置按總平面布置圖,組合場(chǎng)內(nèi)布置50t龍門(mén)吊各4臺(tái),鍋爐受熱面的大部分組合工作安排在此完成。Boiler assembly yard will be arranged as per general layout drawing. Fo4、ur 50T gantry cranes will be provided respectively. Assembly of most heating surface structures will be done in this area.1.2 施工機(jī)械選擇 Selection of construction plants 根據(jù)本工程鍋爐的結(jié)構(gòu)特點(diǎn),以及我公司的機(jī)械狀況,選用以下機(jī)械作為鍋爐主要施工機(jī)械。Given to the features of the boier and mechanical capacity of our company, we chose plants be5、low as our main construction equipmemnts.序號(hào)Sl 機(jī)械名稱 description機(jī)械型號(hào) mode數(shù)量quantity1圓筒吊cylindrical craneFZQ2000/80t22履帶吊crawler craneCC140013龍門(mén)吊 frame crane50t44履帶吊crawler craneCC250015勞辛格Stand-jack system200t26塔吊 tower craneC7050/20t3(1) FZQ2000/ 80T圓筒吊 FZQ2000/ 80T cylindrical craneFZQ2000圓筒吊做為附吊機(jī)械,6、筒身高度102m,采用60m臂長(zhǎng)工況,主要負(fù)責(zé)鍋爐本體部件的吊裝工作。FZQ2000 cylindrical crane is arranged as auxiliary hoisting plants, which is designed to hoist boiler & components (crane body height 102m , length of jib 60m). (2) 250t履帶吊 250t Crawler crane CC1400/250t履帶吊為鍋爐主吊機(jī)械,采用SWSL塔式工況,后配重40t,主臂角度85度:主副臂:72m加36m;最大作業(yè)半徑42m,負(fù)荷27、7t;最小作業(yè)半徑24m時(shí),負(fù)荷為39t。CC1400/250 Crawler cranes are designed as main boiler hoisting euqipment, adopting SWSL tower working conditions, with a banlance weight of 40t and main jib angle of 85; length of main & auxiliary jib,72+36m, max working radius 42m,load 27t;min working radius 24m,load 39t. 吊裝主要內(nèi)8、容為:Main hoisting scope:a. 鍋爐鋼架吊裝。Boiler steel structure lifting. b. 鍋爐受熱面吊裝、空氣預(yù)熱器吊裝。Boiler heating surface ,airpreheater lifting.c.煙、風(fēng)、煤管道安裝 Flue gas,air,coal piping erection.d. 根據(jù)現(xiàn)場(chǎng)實(shí)際換工況用于大件設(shè)備的安裝和卸車(chē)工作。 Employed in erection of other heavy equipments and unloading works.CC1400/250t履帶吊性能表(SWSL塔式、后配重409、t工況)主附臂(主臂角度85):72m+36m。CC1400/250t crawler crane performance list(SWSL TOWER type,banlance weight 40t), main & auxiliary jib,72+36m(main jib angle of 85) .幅度 scope24m26m28m30m34m38m42m負(fù)荷load39t38t38t37t34t31t27t(3)前期采用C7050/20t作為鋼結(jié)構(gòu)的主要吊裝機(jī)械,后期作為電除塵的主吊機(jī)械。In prophase, C7050/20t shall be employed as ma10、in hoisting plants for structure;in anaphase shall be employed in hoisting ESP components. (4) 其它吊裝機(jī)械 Other lifting plants A四臺(tái)50t龍門(mén)吊布置于鍋爐組合場(chǎng),負(fù)責(zé)設(shè)備裝卸車(chē)、受熱面膜式壁及蛇行管排的組合工作及煙風(fēng)道的制作組合工作。4 frame cranes of 50t shall be arranged in Boiler structure assembly yard, employed in equipments loading and unloading, he11、ating surface and pipe coil assembly works and flue/air ducting fabricating asembly works. b. 50t汽車(chē)吊負(fù)責(zé)現(xiàn)場(chǎng)設(shè)備卸車(chē)倒運(yùn)等工作。 .b. Truck crane of 50t shall be employed in equipments unloading in site.c.卷?yè)P(yáng)機(jī)布置在鍋爐0m,輔助進(jìn)行爐膛內(nèi)管排及小件的吊裝。c . winch shall be arranged in 0m, assisting furnace internals lifting and the lift12、ing of some samll units. d. 勞辛格負(fù)責(zé)汽包吊裝工作。Stand-jack system will be used in steam drum listing works.(5) 施工電梯布置 service lift arrangment為方便鍋爐施工,在爐一側(cè)布置一施工電梯。Sservice lifts shall be arranged in each side of the boiler. 2鍋爐本體鋼架安裝 Boiler steel structure erection鍋爐鋼結(jié)構(gòu)由頂板、柱和梁、垂直支撐、水平支撐等部件組成,頂板由主梁、次梁和小梁組成一個(gè)堅(jiān)固13、的梁格,其四周有水平支撐,主梁端有垂直支撐。Boiler steel structure consists of roof, column, girder, vertical and lateral supporting, while roof comprising of girder, secondary beam, trabecula and forming a firm box. 鋼架內(nèi)側(cè)柱為主要承重鋼柱,外側(cè)副柱則通過(guò)梁、水平支撐與內(nèi)側(cè)柱相連,以增加鋼架的整體穩(wěn)定性。鋼結(jié)構(gòu)從前至后共有6排。鍋爐鋼架的連接,采用高強(qiáng)螺栓和焊接相結(jié)合的方式,頂板和主梁與次梁之間,柱和梁之間,垂直支撐、水平14、支撐之間采用扭剪型高強(qiáng)螺栓連接,其余構(gòu)件間采用焊接連接。Internal pillars of the structure are designed for bearing, while the external pillars are designed to reinforce the entire stability of structure by connecting with girders, lateral supporting and internal pillars. There are 6 rows. Bolt and welding are employed in the c15、onnection of structure. 2.1 吊裝方案 Hoisting plans 主吊機(jī)械選用一臺(tái)FZQ2000圓桶吊,一臺(tái)CC1400履帶吊為附吊機(jī)械,圓筒吊布置于鍋爐爐左K、L間距鍋爐本體外側(cè)柱中心線5米處,CC1400履帶吊布置于爐的另一側(cè)。鋼架各段本著由爐前至爐后、先主柱后輔柱原則分段吊裝,即安裝一段找正一段,驗(yàn)收本段鋼架后對(duì)高強(qiáng)螺栓進(jìn)行終緊。鋼架安裝過(guò)程中相應(yīng)段平臺(tái)、樓梯、欄桿隨之安裝。Main hoisting plants comprise of an FZQ2000 cylindrical crane and CC1400 crawler crane (as au16、xiliary hoisting plants), the cylindrical crane shall be arranged at left side of boiller between boiler central line and it is 5 meters away from the boiler central line , CC14OO crawler shall be arranged on the other side of boiler. Each section of the structure follows the rule of from furnace fr17、ont to back, from main pillars to complement pillars. Duiring the process of structure erection, platform,stairecase and handrails should be finishsed. 在鋼架吊裝過(guò)程中,視來(lái)貨及制件完成情況,根據(jù)相應(yīng)設(shè)備的安裝位置和標(biāo)高,把一次風(fēng)熱風(fēng)道、二次風(fēng)熱風(fēng)道、回轉(zhuǎn)式空預(yù)器、預(yù)熱器入口煙道、省煤器出口灰斗以及燃燒器連接風(fēng)道等相關(guān)設(shè)備隨之預(yù)存;各段吊裝過(guò)程中,相應(yīng)主降水管和剛性梁要臨時(shí)吊掛在相應(yīng)各層鋼架梁上;視圖紙具體情況緩裝爐左側(cè)及爐后7m標(biāo)高下的部分拉18、條,做為爐內(nèi)吊裝設(shè)備的進(jìn)入通道,爐膛內(nèi)影響汽包(吊裝中的初偏斜和爐頂調(diào)水平處)、板梁(爐膛內(nèi)抬吊時(shí))吊裝的桿件緩裝。During the erection of structure, according to the progress of goods supply and parts fabrication, and erection position and height , we can save some equipments in their required position and ercet later such equipments including, primary ho19、t air duct, secondary hot air duct, rotaty air preheator, preheator inlet flue gas ducting, economizer outlet ash bucket and burner connecting air duct. During each stage of erection, main downcomers and stiffening bars should be temporarily hanged in their girders of structure. As per the drawings 20、, some braces on the left side of boiler or back of boiler below the height of 7m should be erected later, so that access for the hoisting works of boiler internals are made, in addition, any parts of boiler internal shafts that affect steam drum and plate girder lifting should be erected later. 2.221、 施工順序 Construction procedure鍋爐基礎(chǔ)劃線標(biāo)高復(fù)驗(yàn)和基礎(chǔ)鑿毛柱底板安裝立柱1m標(biāo)高線復(fù)檢結(jié)構(gòu)第一段吊裝整體找正柱腳二次澆灌其它幾層結(jié)構(gòu)吊裝頂板梁吊裝鋼結(jié)構(gòu)完善。Boiler Foudation Lining Level Call Back And Surface Preparation Column Plate Erection Column 1m Level Callback Structure Erection Stage 1 Structure Alignment Column Foot Secondary Grouting Other Floors Lifti22、ng Roof Plate Girder Lifting Stucture Maintenance 3頂板梁吊裝方案 Roof girder hoisting plans鍋爐鋼結(jié)構(gòu)第八段立柱、橫梁、拉條安裝完畢后,根據(jù)大板梁吊裝需要,部分桿件預(yù)留,經(jīng)檢驗(yàn)合格,才能進(jìn)行板梁吊裝。After the erection of pillars of structure, beams , braces , to meet the requirement of girder hoisting, some shafts should be saved to their position and erecte23、d after passing test ,then plate beams hoisting could commence. 鍋爐頂板梁的吊裝機(jī)械為FZQ2000/80t圓筒吊和CC1400/CC2500履帶吊。FZQ2000/80t圓筒吊布置在#1、#2爐的兩側(cè),每臺(tái)爐有一臺(tái)磨機(jī)緩裝,CC2500/CC1400履帶吊在2臺(tái)爐中間機(jī)動(dòng)布置,看情況緩裝一臺(tái)磨煤機(jī),使CC2500/CC1400滿足頂板梁吊裝工況。FZQ2000/80t cylindrical crane and CC1400/CC2500 crawler crane are employed to hoist boiler ro24、of plate girder. FZQ2000/80t cylindrical crane should be arranged in both sides of boiler #1and#2, each boiler should be arranged with one mill after later. , while CC1400 or CC2500 crawler crane should be arranged between the tow boilers ,one mill should be erected later if necessary so that CC250025、/CC1400 can meet the requirement of roof plate girder hoisting. 板梁由專用平板車(chē)運(yùn)輸至爐右側(cè)0m處,利用CC1400履帶吊卸車(chē)或者兩主吊同卸,其中J、K、 L三根板梁利用FZQ2000塔吊和CC2500/CC1400共同抬吊到安裝位置。順序依次為L(zhǎng)、K、J,其余板梁由FZQ2000塔吊或CC2500/CC1400履帶吊單獨(dú)吊裝。Plate girder should handled to 0 m in the right side of boiler by special platform lorry, CC1400crawler26、 cranes or main cranes should be used to unload. FZQ2000 tower crane and CC2500/CC1400 are used to lift J,K,L plate girder. Consequence is L,K,J, other plate girders should respectively be hoisted by FZQ2000 tower crane or CC2500/CC1400 crawler crane. 說(shuō) 明 星欣設(shè)計(jì)圖庫(kù)資料專賣(mài)店擁有最新最全的設(shè)計(jì)參考圖庫(kù)資料,內(nèi)容涉及景觀園林、建筑、規(guī)劃、室內(nèi)裝修、建筑結(jié)構(gòu)、暖通空調(diào)、給排水、電氣設(shè)計(jì)、施工組織設(shè)計(jì)等各個(gè)領(lǐng)域的設(shè)計(jì)素材和設(shè)計(jì)圖紙等參考學(xué)習(xí)資料。是為廣大藝術(shù)設(shè)計(jì)工作者優(yōu)質(zhì)設(shè)計(jì)學(xué)習(xí)參考資料。本站所售的參考資料包括設(shè)計(jì)方案和施工圖案例已達(dá)幾十萬(wàn)套以上,總量在數(shù)千G以上。建筑設(shè)計(jì)施工圖紙建筑規(guī)劃設(shè)計(jì)方案及施工圖園林景觀設(shè)計(jì)施工圖紙室內(nèi)裝修設(shè)計(jì)圖紙建筑結(jié)構(gòu)設(shè)計(jì)方案與施工圖給排水設(shè)計(jì)方案與施工圖暖通空調(diào)設(shè)計(jì)方案與施工圖電氣設(shè)計(jì)方案與施工圖設(shè)計(jì)施工組織方案大全建筑及景觀表現(xiàn)PSD后期處理效果圖圖庫(kù)網(wǎng)址ftp:/ 聯(lián)系QQ:447255935電話:13111542600
會(huì)員尊享權(quán)益 會(huì)員尊享權(quán)益 會(huì)員尊享權(quán)益
500萬(wàn)份文檔
500萬(wàn)份文檔 免費(fèi)下載
10萬(wàn)資源包
10萬(wàn)資源包 一鍵下載
4萬(wàn)份資料
4萬(wàn)份資料 打包下載
24小時(shí)客服
24小時(shí)客服 會(huì)員專屬
開(kāi)通 VIP
升級(jí)會(huì)員
  • 周熱門(mén)排行

  • 月熱門(mén)排行

  • 季熱門(mén)排行

  1. 城市主供水管及備用原水管工程管道安裝施工組織設(shè)計(jì)方案105頁(yè).doc
  2. 山西長(zhǎng)治長(zhǎng)豐綜合(43萬(wàn)方)項(xiàng)目(住宅+酒店+商業(yè)+辦公)建筑方案設(shè)計(jì)(246頁(yè)).pdf
  3. 2025預(yù)算員最全造價(jià)筆記包.zip
  4. 貴陽(yáng)南明區(qū)地塊項(xiàng)目(住宅、商業(yè)+辦公+學(xué)校)建筑方案設(shè)計(jì)(311頁(yè)).pdf
  5. 西安金輝世界城J地塊綜合體項(xiàng)目建筑設(shè)計(jì)方案(318頁(yè)).pdf
  6. 蔬菜大棚鋼結(jié)構(gòu)施工組織設(shè)計(jì)方案(65頁(yè)).pdf
  7. 全輕混凝土地坪施工方案.doc
  8. 邊坡治理工程錨索錨桿格構(gòu)梁施工技術(shù)交底.doc
  9. 陳列布展廳建設(shè)工程電氣安裝展廳電子及裝飾裝修安全施工方案46頁(yè).doc
  10. 大酒店公共區(qū)域及客房區(qū)域室內(nèi)裝修改造工程墻面軟包施工組織設(shè)計(jì)86頁(yè).doc
  11. 醫(yī)院住院綜合大樓智能化弱電系統(tǒng)工程施工組織設(shè)計(jì)方案(151頁(yè)).doc
  12. 蔬菜大棚土建、鋼結(jié)構(gòu)工程施工組織設(shè)計(jì)方案(66頁(yè)).doc
  13. 雨、污水管道工程PVC—U雙壁波紋管施工方案(37頁(yè)).doc
  14. 熱電聯(lián)產(chǎn)機(jī)組工程排水槽廢水池防腐施工安全專項(xiàng)方案(12頁(yè)).doc
  15. U型渠道建設(shè)工程施工組織設(shè)計(jì)方案(52頁(yè)).doc
  16. 秦皇島市北環(huán)路道路改造工程監(jiān)理大綱(346頁(yè)).PDF
  17. 幼兒園建設(shè)工程項(xiàng)目可行性研究報(bào)告(486頁(yè)).doc
  18. 物業(yè)公司如何提高業(yè)主滿意度、提升服務(wù)質(zhì)量演講課件.pptx
  19. 杭州 ·長(zhǎng)嶺居別墅項(xiàng)目故事線策劃方案.pdf
  20. 融創(chuàng)武義小鎮(zhèn)旅游度假項(xiàng)目故事線營(yíng)銷(xiāo)推廣方案.pdf
  21. 2020江山悅地產(chǎn)項(xiàng)目故事線構(gòu)建推廣方案.pdf
  22. 建筑大理石、花崗石干掛施工工藝(5頁(yè)).doc
  1. 服裝店鋪形象維護(hù)細(xì)則及獎(jiǎng)懲管理制度.doc
  2. 城市主供水管及備用原水管工程管道安裝施工組織設(shè)計(jì)方案105頁(yè).doc
  3. 水泥混凝土路面工程施工方案(17頁(yè)).doc
  4. 水泥混凝土路面工程專項(xiàng)施工方案(17頁(yè)).doc
  5. 2023年版建筑公司30套施工方案編制指南(1041頁(yè)).pdf
  6. 生態(tài)治理工程土石方工程及噴播植草籽施工方案(91頁(yè)).doc
  7. 山西長(zhǎng)治長(zhǎng)豐綜合(43萬(wàn)方)項(xiàng)目(住宅+酒店+商業(yè)+辦公)建筑方案設(shè)計(jì)(246頁(yè)).pdf
  8. 2024年建筑公司機(jī)電安裝工程質(zhì)量創(chuàng)優(yōu)策劃方案(108頁(yè)).docx
  9. 商業(yè)街夜市市集U+夜市定位規(guī)劃方案(73頁(yè)).pptx
  10. 生態(tài)治理工程土石方、噴播植草(灌木)籽施工方案(89頁(yè)).doc
  11. 地下停車(chē)場(chǎng)環(huán)氧地坪漆施工方案(19頁(yè)).docx
  12. 學(xué)生宿舍室外市政道路工程雨水管道工程施工組織設(shè)計(jì)方案(19頁(yè)).doc
  13. 工程施工機(jī)械車(chē)輛設(shè)備租賃合同(12頁(yè)).docx
  14. 中建二局-201號(hào)辦公質(zhì)保樓項(xiàng)目檢驗(yàn)和試驗(yàn)計(jì)劃方案(45頁(yè)).doc
  15. 花苑小區(qū)住宅樓工程新工藝新技術(shù)應(yīng)用施工方案(32頁(yè)).doc
  16. 土建、安裝、裝飾工程施工檢測(cè)試驗(yàn)計(jì)劃表.docx
  17. 安全生產(chǎn)管理體系及保證措施方案(59頁(yè)).doc
  18. 蔬菜大棚鋼結(jié)構(gòu)施工組織設(shè)計(jì)方案(65頁(yè)).pdf
  19. 冷卻水塔管道更換安裝施工方案(41頁(yè)).doc
  20. 綜合樓中央空調(diào)安裝施工組織設(shè)計(jì)方案(水、多聯(lián)機(jī))(166頁(yè)).doc
  21. 建筑工程造價(jià)失控的原因分析及控制(3頁(yè)).docx
  22. 抹灰工程施工方案(水泥砂漿)(20頁(yè)).docx
  1. 風(fēng)機(jī)安裝工程施工質(zhì)量強(qiáng)制性條文執(zhí)行記錄表(40頁(yè)).doc
  2. 鐵路特大橋高墩施工專項(xiàng)安全施工方案(48頁(yè)).doc
  3. 服裝店鋪形象維護(hù)細(xì)則及獎(jiǎng)懲管理制度.doc
  4. 東方國(guó)際休閑廣場(chǎng)商業(yè)定位與招商提案(51頁(yè)).ppt
  5. 建筑[2009]257號(hào)關(guān)于建立建筑業(yè)企業(yè)農(nóng)民工工資保證金制度的通知【5頁(yè)】.doc
  6. 城市垃圾中轉(zhuǎn)站升級(jí)改造工程項(xiàng)目可行性研究報(bào)告129頁(yè).docx
  7. 湖州市南潯區(qū)石淙鎮(zhèn)國(guó)土空間總體規(guī)劃方案(2021-2035年)(草案公示稿)(39頁(yè)).pdf
  8. 河南省城市基礎(chǔ)設(shè)升級(jí)改造項(xiàng)目可行性研究報(bào)告(107頁(yè)).doc
  9. 城市220kV電力線路改造工程項(xiàng)目可行性研究報(bào)告94頁(yè).doc
  10. 電力公司樁基、墩基施工組織設(shè)計(jì)方案(38頁(yè)).doc
  11. 800MW光伏40MWh儲(chǔ)能光伏示范項(xiàng)目可行性研究報(bào)告306頁(yè).pdf
  12. 2023珠海城市主干道道路升級(jí)改造工程項(xiàng)目可行性研究報(bào)告305頁(yè).pdf
  13. 2023城鎮(zhèn)老舊小區(qū)配套基礎(chǔ)設(shè)施建設(shè)項(xiàng)目可行性研究報(bào)告(163頁(yè)).pdf
  14. 城市主供水管及備用原水管工程管道安裝施工組織設(shè)計(jì)方案105頁(yè).doc
  15. 2022城市更新改造補(bǔ)短板老舊小區(qū)改造項(xiàng)目可行性研究報(bào)告(206頁(yè)).docx
  16. 2023年城鎮(zhèn)老舊小區(qū)改造及配套基礎(chǔ)設(shè)施建設(shè)項(xiàng)目可行性研究報(bào)告(84頁(yè)).pdf
  17. 2023生活區(qū)城鎮(zhèn)老舊小區(qū)改造項(xiàng)目可行性研究報(bào)告(附圖)(121頁(yè)).pdf
  18. 房產(chǎn)中介公司員工入職業(yè)務(wù)銷(xiāo)售技能培訓(xùn)資料合集.zip
  19. 縣城配電網(wǎng)110kV輸變電工程項(xiàng)目可行性研究報(bào)告266頁(yè).doc
  20. 水天苑小區(qū)地源熱泵空調(diào)系統(tǒng)設(shè)計(jì)方案(149頁(yè)).doc
  21. 2023城鎮(zhèn)老舊小區(qū)改造項(xiàng)目可行性研究報(bào)告(122頁(yè)).pdf
  22. 淮南礦業(yè)集團(tuán)棚戶區(qū)改造項(xiàng)目八公山新村、和平村室外變配電工程施工組織設(shè)計(jì)方案(92頁(yè)).doc
主站蜘蛛池模板: 崇仁县| 佛教| 花莲市| 宁化县| 明光市| 花垣县| 友谊县| 临夏县| 枣阳市| 正宁县| 沈阳市| 汉川市| 谷城县| 宜丰县| 广水市| 禹州市| 罗江县| 长治市| 屯留县| 手游| 交城县| 虎林市| 离岛区| 安新县| 承德市| 金秀| 博爱县| 太和县| 油尖旺区| 黄陵县| 彭州市| 宁都县| 平邑县| 常州市| 巍山| 平罗县| 息烽县| 南漳县| 保德县| 阜康市| 沂水县|