午啪啪夜福利无码亚洲,亚洲欧美suv精品,欧洲尺码日本尺码专线美国,老狼影院成年女人大片

個人中心
個人中心
添加客服微信
客服
添加客服微信
添加客服微信
關注微信公眾號
公眾號
關注微信公眾號
關注微信公眾號
升級會員
升級會員
返回頂部
1312-STR-1200梁柱模板及支架施工方案英文版(7頁)
1312-STR-1200梁柱模板及支架施工方案英文版(7頁).docx
下載文檔 下載文檔
其它文檔
上傳人:正*** 編號:439447 2022-07-08 4頁 34.38KB

下載文檔到電腦,查找使用更方便

10 金幣

  

還剩頁未讀,繼續閱讀

1、Construction Method StatementFor Beam, Column Formworks and supporting frames of 1312-STR-12001. Scope12. Material13. Construction methods and technical measures21. ScopeThe method statement herein is compiled by mainly focusing on installation of column and beam formworks of 1312-STR-1200 and their2、 supporting frames.2. Materials1)Plywood ( =15mm) shall be adopted to precast formworks of beam and column. The wooden board(50100mm) and the steel tube( 48.3 shall4.0) be used to respectively support the inner kneel and outer kneel of formworks2)The steel tube ( 48.3 4.0) shall be used to make supp3、ort of beam and column formworks and to erectscaffoldings.3) The upright monkey ladder shall be made of aluminum alloy and the planks will be made of steel.3. Construction methods and technical measures3.1.To ensure the stability of supporting frames, the concrete pouring of column and beam shall be4、 done separately by three times .The first time of pouring for column shall reach the elevation of 109000mm and the second time of pouring for column shall reach the elevation of 116850.Pouring the for the part of the column above elevation of 116850mm shall be done together with concrete pouring fo5、r the beam. The supporting frame of beam formwork shall be connected rigidly to the poured column prior to starting concrete pouring on the beam.3.2.Method of reinforcement for column formwork.C1/C1a( sectional dimension 850750mm)、C2( sectional dimension 750750mm)5 ways of keels inside eachside face6、 of column formwork and double steel tubes with a spacing of 500mm for column hoop. Tie bolts 12 withspacing of 500mm installed inside side face. The upper, middle and lower column hoops of column formwork shall beconnected to support outside to avoid tilting or inclinedness.3.3.Methods of reinforce7、ment and supporting for beam formwork. See table 3.1.2.Table-3.1.2Code1GX1/5/6/1GX21GX31GX4/11GY1/4/51GY21B11B27/8/9 、1B3GY3、1B4Sectional Dimensions4007007001700135001040060065010006009007509001005000Formwork ofInner keel offormwork35543444bottom of beam( line )Spacing between outer keels of0.450.608、.60.60.450.50.50.5formwork(m)Two sidesSpacinSupport on theof0.91.21.21.21.01.21.21.2g ofbottom of beamformwork(mposts)Span of beams (m)0.90.60.60.60.90.50.50.5Bay of posts(m)1.51.51.51.51.51.51.51.5Bearing post additionally fitted02210111on the bottom of beam (line )SideInner keel of formworkformwor9、k( line )45754555of beamOuter keel of formwork(line)0.90.60.60.60.450.50.50.5Spacing ( m)TieDiameter12161612/121212BoltH ( m)0.30.50.60.5/0.40.40.4Code1GX1/5/6/1GX21GX31GX4/11GY1/4/51GY21B11B27/8/9 、1B3GY3、1B4l(m )0.90.60.60.6/0.50.50.5Note: “ H” indicates the distance from tie bolt to the bottom of10、 beam.“ I ” indicates the spacing on the direction ofbeam spans. The upper parts and lower parts of beam formwork shall be connected to the support tightly by steel tubecouplers.3.4.Procedure and requirements for erection of supporting frame.1)Procedure of erection: Place base plate(board) with a th11、ickness of 50mm Erect base lift Connect the post andbase lift by couplersInstall the first runner and bearer and connect them to the post tightly with couplersRepeated the last stepErect cross bracingsLay steel planks.2). Lay the base plate (base support) and place the base lift as per the prioritie12、s of beam locations. The longitudinal base lift shall be fixed to the post with right angle couplers and the post shall be not more than 200mm to the bottom of steel tube. However, the transverse base lift shall be fixed to the post with right angle couplers and the post shall be close to the undern13、eath of longitudinal base lift.3) The posts shall be erected as per the sequence of positioning. The posts shall be connected and fixed to the longitudinal and transverse base lifts. For erection of posts, the joints on each lift height shall be pair joint couplers (except for the top height lift) a14、nd ensure that the pair joints on the same section shall keep some space (50% of the sectional size)4).The bearer shall be set on the inner side of the post and the length of single post shall be not less than 3 bays. The bearer shall be connected by pair joint couplers and conform to the following 15、rules: the ends for connection of two adjacent bearers shall not be set in the same bay or same lift height. Any two adjacent connection joints not in the same bay or lift height shall keep a distance of not less than 500mm on the horizontal direction. The distance fromeach joint centre to the neare16、st main joint shall be not more than 1/3 of the longitudinal spacing.5).The connection between runner and bearer on the bottom of beam formwork shall be connected to the post bydouble couplers.6).Add one bearer in the middle of two bearers on the top lift of supporting frame. The top of the bearer s17、hall be tightlyto the surrounding framed supports.7) The erection of cross bracing: the cross bracings shall be erected along with the scaffolding structure. The bracingson the bottom liftshall be all supported by the base plate.The method of lapjoint shallbe adopted forbracings,connection. The leng18、th of lap joint shall not be less than 1m and fixed by 3 rotating couplers. The distance from theedge coupler?s cover on the top to the top of the post shall be not less than 100mm.The bracings shall be fixed to theextended part of runner or the post by rotating couplers. The central line of rotary 19、coupler shall keep a distance of notmore than 150mm to the main joint.8). Rigid connection shall be done in every 3 meters vertically between the formwork support, scaffolding and thecolumn of the frame around which the construction work has been completed.9). Cross bracings shall be erected respect20、ively on the ends of outer sides , corners and the central vertical face with adistance of less than 15m of the scaffoldings .The sequence of cross bracing erection shall be from the bottom to thetop. The width of cross bracing is 6m, which makes an angle of 4560with the ground.10) .The wall fastene21、rs of the scaffoldings shall be laid out horizontally close to the main jointas per the rule of“ two liftheights and threebays ” . The distance between fasteners and main joints shall be not more than 300mmm.11) .Planks shall be fully laid on the working platform with sound firmness and tied with st22、eel wire #14 on three runners.Both ends of the scaffolding planks shall be reliable and fixed so as to prevent capsizing.12) .Guardrails: Erect two-line guardrails above the working platform and the upper line of guardrails (top rail) shall be 1.2m tall while the mid rail shall be set in the middle 23、line of the lift height. Toe boards shall be erected with a height of 180mm to the platform.1) Access for going up and down :Place 1 set of upright monkey ladder respectively on the southwest corner and northeast corner of scaffoldings. A rest platform shall be erected at the height of 4.5m of the u24、pright monkey ladder.3.5.Dismantling of supporting frame.1).The technician shall conduct a technical disclosure for all the working crew members who are going to perform dismantling work prior to commencement of dismantling work and all the attendees are required to sign on the written form of this 25、said technical disclosure.2). Arrange the power cables properly before dismantling the supporting frame. For the cables that cannot be dismantled or put aside, they shall be buried by soil.3). Barricade the area with rope or warning tape prior to starting dismantling work. The work can be started on26、ly in the presence of watchman, HSE personnel and foreman.4) During dismantling the scaffoldings, the workers must wear harness and be equipped with tool bag. The workersshall not hold the steel tube and wrenches simultaneously .The tools shall be kept in the tool bag after use.5).The procedure for 27、dismantling scaffoldings: From the top to the bottom, opposite to the sequence of erection. Thegeneral sequence for dismantling: guardrails scaffolding planks cross bracings runner bearer postpassed onto the ground couplers removing dismantled parts stacking and storing as per the specifications.6) 28、Someoneshall be appointedfor monitoringthe dismantlingwork for structuralform of scaffoldings .Thecrewmembersshallacknowledgedwiththeirrespectivegivendutiesand work underunitedinstruction .Theworkingpostsplatform shall be with enough space7) It is not allowed to dismantle a vertical platform from 2 29、different points or from 2 different lift heights at the same time .Do not move to the next one until the last one has been completely dismantled. If the dismantling is being done at 2 different positions of the scaffolding system, the height different shall be within 2 lift heights so that the stab30、ility ofthe structural form will not be destroyed.8) The wall fasteners shall be dismantled along with the scaffoldings lift by lift. It is not allowed to dismantle the wall fasteners of the whole lift before dismantling the scaffoldings. When the dismantling of scaffoldings has come to the height o31、f last post remaining (Approximately 6.5m), the wall fasteners shall be dismantled when temporary bracings have been erected and strengthened at suitable locations.9) The dismantling work of long post or runner (bearer) shall be done by two workers in case any undesirable incident occurs10) The work32、ers cannot sit on the scaffolding platform being dismantled or any unsafe place during taking the break. Horseplay is also strictly forbidden during dismantling the scaffoldings.11).The dismantled post or any component part shall not be thrown causally .Instead, the dismantled parts shall be dropped down with being tied to the solid rope and stacked as per their categories.12).The workers can be permitted to leave the workplace only when it has been confirmed by appointed personnel that this workplace is free from any potential hazard.
會員尊享權益 會員尊享權益 會員尊享權益
500萬份文檔
500萬份文檔 免費下載
10萬資源包
10萬資源包 一鍵下載
4萬份資料
4萬份資料 打包下載
24小時客服
24小時客服 會員專屬
開通 VIP
升級會員
  • 周熱門排行

  • 月熱門排行

  • 季熱門排行

  1. 建筑公司安全物資供應單位及個人防護用品管理制度.doc
  2. 2021房地產公司創新建筑立面設計研發手冊(50頁).pdf
  3. 縣新型智慧城市綜合管理服務平臺可行性及概算方案研究報告(815頁).docx
  4. 西安·綠地中心B座幕墻工程超高層單元式幕墻施工組織設計方案(223頁).pdf
  5. 住宅新中式和法式立面標準化設計產品研發手冊(含出入口標準化)(273頁).pdf
  6. 杭州 ·長嶺居別墅項目故事線策劃方案.pdf
  7. 邊坡治理工程錨索錨桿格構梁施工技術交底.doc
  8. 2022武漢安嶼那住宅地產項目故事線推廣方案(40頁).pdf
  9. 地產項目故事線梳理創作案例與場景運用培訓課件(82頁).pptx
  10. 建筑設計公司魔奇公寓研發及創新手冊(101頁).pdf
  11. 總承包企業建設項目代發工資管理制度.doc
  12. 施工工地觸電傷害現場應急搶救預案.doc
  13. 綠城售樓處示范區中式風格建筑設計研發手冊(380頁).pdf
  14. 創新性公寓標準化研發手冊(101頁).pdf
  15. 水利水電工程單元工程施工質量驗收評定表.doc
  16. 園林綠化工程公司檔案管理制度(25頁).doc
  17. 2018智造系房地產產品價值梳理故事線方案(46頁).pdf
  18. 秦皇島市北環路道路改造工程監理大綱(346頁).PDF
  19. 江蘇會展中心幕墻施工組織設計方案,玻璃幕墻,鋁板幕墻(230頁).doc
  20. 幕墻施工組織設計方案(陶板、玻璃幕墻上海)(73頁).doc
  21. 2020東莞棠樾別墅故事線提報方案(33頁).pdf
  22. 思源房地產項目產品設計研發體系方案(96頁).pptx
  1. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  2. 水泥混凝土路面工程施工方案(17頁).doc
  3. 水泥混凝土路面工程專項施工方案(17頁).doc
  4. 2023年版建筑公司30套施工方案編制指南(1041頁).pdf
  5. 建筑公司安全物資供應單位及個人防護用品管理制度.doc
  6. 生態治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  7. 2025預算員最全造價筆記包.zip
  8. 山西長治長豐綜合(43萬方)項目(住宅+酒店+商業+辦公)建筑方案設計(246頁).pdf
  9. 2024年建筑公司機電安裝工程質量創優策劃方案(108頁).docx
  10. 商業街夜市市集U+夜市定位規劃方案(73頁).pptx
  11. 生態治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  12. 地下停車場環氧地坪漆施工方案(19頁).docx
  13. 2021房地產公司創新建筑立面設計研發手冊(50頁).pdf
  14. 學生宿舍室外市政道路工程雨水管道工程施工組織設計方案(19頁).doc
  15. 工程施工機械車輛設備租賃合同(12頁).docx
  16. 中建二局-201號辦公質保樓項目檢驗和試驗計劃方案(45頁).doc
  17. 綜合樓中央空調安裝施工組織設計方案(水、多聯機)(166頁).doc
  18. 鋼筋工程專項施工方案(46頁).doc
  19. 建筑工程造價失控的原因分析及控制(3頁).docx
  20. 住宅新中式和法式立面標準化設計產品研發手冊(含出入口標準化)(273頁).pdf
  21. 抹灰工程施工方案(水泥砂漿)(20頁).docx
  22. 杭州 ·長嶺居別墅項目故事線策劃方案.pdf
  1. 風機安裝工程施工質量強制性條文執行記錄表(40頁).doc
  2. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  3. 服裝店鋪形象維護細則及獎懲管理制度.doc
  4. 東方國際休閑廣場商業定位與招商提案(51頁).ppt
  5. 建筑[2009]257號關于建立建筑業企業農民工工資保證金制度的通知【5頁】.doc
  6. 城市垃圾中轉站升級改造工程項目可行性研究報告129頁.docx
  7. 湖州市南潯區石淙鎮國土空間總體規劃方案(2021-2035年)(草案公示稿)(39頁).pdf
  8. 河南省城市基礎設升級改造項目可行性研究報告(107頁).doc
  9. 城市220kV電力線路改造工程項目可行性研究報告94頁.doc
  10. 800MW光伏40MWh儲能光伏示范項目可行性研究報告306頁.pdf
  11. 2023珠海城市主干道道路升級改造工程項目可行性研究報告305頁.pdf
  12. 2023城鎮老舊小區配套基礎設施建設項目可行性研究報告(163頁).pdf
  13. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  14. 2022城市更新改造補短板老舊小區改造項目可行性研究報告(206頁).docx
  15. 2023年城鎮老舊小區改造及配套基礎設施建設項目可行性研究報告(84頁).pdf
  16. 2023生活區城鎮老舊小區改造項目可行性研究報告(附圖)(121頁).pdf
  17. 房產中介公司員工入職業務銷售技能培訓資料合集.zip
  18. 縣城配電網110kV輸變電工程項目可行性研究報告266頁.doc
  19. 水天苑小區地源熱泵空調系統設計方案(149頁).doc
  20. 2023城鎮老舊小區改造項目可行性研究報告(122頁).pdf
  21. 淮南礦業集團棚戶區改造項目八公山新村、和平村室外變配電工程施工組織設計方案(92頁).doc
  22. 水泥混凝土路面工程專項施工方案(17頁).doc
主站蜘蛛池模板: 孙吴县| 锡林浩特市| 梅州市| 北川| 九龙城区| 中方县| 泗洪县| 象州县| 格尔木市| 沙坪坝区| 琼海市| 天全县| 大方县| 洛宁县| 石泉县| 五寨县| 瑞安市| 广水市| 斗六市| 沛县| 东光县| 嵊州市| 增城市| 资源县| 荔浦县| 普陀区| 鲁山县| 阿鲁科尔沁旗| 东山县| 南城县| 蚌埠市| 正蓝旗| 松江区| 罗城| 鹿泉市| 浑源县| 庄浪县| 榆中县| 蓝田县| 百色市| 泰来县|