2017房地產開發公司馬來西亞森林城市工程建設進度報告(21頁).pdf
下載文檔
上傳人:偷****
編號:473490
2022-07-22
21頁
4.07MB
該文檔所屬資源包:
東南亞城市房地產市場投資研究報告
1、森林城市工程建設進度 2017.10.15Forest City Progress Update 海藍灣Cerulean Bay:主體結構已封頂,目前裝修施工階段,鋁窗已安裝至19層,砌體施工至31層。Main structural works completed,decoration works in progress,Level 19 aluminium frame door and window completed,Level 31 masonry works completed.觀瀾海Regalia Park:主體結構施工階段,最慢第4層、最快第7層;Plot 4:Main struc2、ture works in construction;the lowest is Level 4-the highest is Level 7海珀灣Peony Littoral:主體結構施工階段,基礎結構完成至70%,主體結構完成至40%。Main structure works in construction;foundation works completed 70%,main structure works completed 40%.星海灣Starview Bay:主體結構施工階段,最慢第2層、最快第7層。In the construction of main structure wo3、rks;the lowest is Level 2-the highest is Level 7.海悅灣1、3:Ataraxia Park1,3:打樁完成;總包進場。Piling works completed;main contractor takes site possession.海悅灣4:Ataraxia Park4:打樁階段,灌注樁完成34.9%,管樁完成26.9%;In the process of piling;bored pile completed 34.9%,spun piles completed 26.9%海之羽地標:Landmark Building:主體樁基完成,攪4、拌樁完成47%。Main structure piling completed;concrete mixer pile completed 47%.美國名校:International school:教學樓和文體中心主體結構施工階段、宿舍樓和活動中心基礎回填及首層施工中;Mainstructureworksforeducationbuildingandartcentre are in the constructionprogress;earth filling worksand Level 1 for hostel andactivity hall are in the process.森林城5、市二期建設進度Forest City Phase II Progress Update高爾夫酒店Golf Hotel:主體施工階段,已施工至4層結構,砌筑進行中。Main structure works in the construction progress up to Level 4,masonry works in progress.高爾夫別墅展示區:Golf demonstration area主體結構已封頂,抹灰100%,裝修25%。Main structure works completed,base coating works completed 100%,and decoration works completed 25%.建筑工業化產業園IBS Park建筑工業化產業園IBS Park島一實景美圖集Forest City Side View 濱海園林Coastal Beach婚慶廣場Wedding Venue濱海風情商業街垂直綠化Vertical Greening海之貝國際會所Forest City Sales Gallery沙灘公園 Beach ParkWelcome Home北緯1 歡迎您歸家
合同協議
上傳時間:2022-07-12
148份