油罐砂石基礎(chǔ)施工方案(8頁)
油罐砂石基礎(chǔ)施工方案(8頁).doc
下載文檔 下載文檔
其它文檔
上傳人:正*** 編號(hào):475515 2022-07-22 8頁 114.50KB

下載文檔到電腦,查找使用更方便

10 金幣

  

還剩頁未讀,繼續(xù)閱讀

1、CSPC NANHAI PETROCHEMICALS PROJECTCSPC 南海石化項(xiàng)目 BACKFILLING OF OIL TANK FOUNDATION油 罐 砂 石 基 礎(chǔ) 施 工WORK INSTRUCTION: WI-8710-8100-0005 SEPCO Electric Power Construction Corporation山東電力基本建設(shè)總公司REV版次DATE日期REASON FOR ISSUE修訂原因BY編制CHKD審核REVIEW審查APPR批準(zhǔn)A20.Aug.2003Issued for ApprovalZhao.KCao.ALLin.HDing.PS0022、8.Aug.2003Issued for UseZhao.KCao.ALLin.HDing.PS0113.Sep.2003Issued for ApprovalZhao.KCao.ALLiu.QYDing.PS目 錄content1.目的 purpose2.范圍 scope3.職責(zé) responsibilities4.參考文件 references5.計(jì)量器具、工具、機(jī)械 tools and equipment6.勞動(dòng)力組織 labors7.施工工序和施工方法 procedure and method8.附件 attachment1.0范圍 scope本程序適用于CSPC 南海石化項(xiàng)目Stea3、m & Power生產(chǎn)區(qū)油罐砂石基礎(chǔ)施工。It applies to backfilling of oil tank foundation for CSPC Nanhai Petrochemical Project Steam and Power Generation Plant.2.0目的 Purpose規(guī)定SEPC01在CSPC南海石化項(xiàng)目中油罐基礎(chǔ)砂石回填的執(zhí)行標(biāo)準(zhǔn),以有效的控制回填過程及質(zhì)量。To specify the standard applicable for the backfilling for the project so as to effectively contro4、l the quality of backfilling.3.0職責(zé) responsibilities技術(shù)負(fù)責(zé)人 Engineering supervisor 宋輝施工負(fù)責(zé)人 Construction superintendent 許德利測(cè)量安全 Survey safety 張勝利質(zhì)檢員 Quality inspector 高見技術(shù)員 Technician 趙克施工員 Construction supervisor 卜現(xiàn)剛3.1 SEPC1建筑隊(duì)負(fù)責(zé)對(duì)砂石回填的全過程進(jìn)行管理。 Sepco1 civil team is responsible for the management and co5、ntrol of backfilling.3.2砂石回填班組負(fù)責(zé)制安全施工措施,并予以執(zhí)行。 Backfilling group is responsible for working out the safety measure and the implementation.3.3 SEPC1施工部對(duì)砂石回填的施工措施進(jìn)行審核,并在作業(yè)過程中進(jìn)行監(jiān)督指導(dǎo)。 Sepco1 Construction Dept is responsible for the review of the construction measures and the surveillance of implementing6、.3.4 SEPC1 HSE部對(duì)砂石回填的安全措施進(jìn)行審核,并檢查現(xiàn)場(chǎng)安全防護(hù)措施。 SEPC1 HSE for the review of the safety measure and the inspection of safety prevention actions.3.5砂石回填班組技術(shù)負(fù)責(zé)人員如有需要,負(fù)責(zé)辦理受限空間施工許可證。The technician of the backfill group for requesting work permit if required.3.6 SEPC1管理人員及施工單位的負(fù)責(zé)人應(yīng)堅(jiān)守崗位,發(fā)現(xiàn)異常問題,立即報(bào)告或采取救援措施。Sepco7、1 management and subcontractors supervisor shall keep watch the site for handling any problems potentially arisen. 3.7檢測(cè)中心負(fù)責(zé)壓實(shí)遍數(shù)、含水率的確定及壓實(shí)系數(shù)的檢測(cè)。The test center for the inspection of compacting times, water content and compaction factor.4.0參考文件 references4.1相關(guān)設(shè)計(jì)圖紙;related design drawings4.2與施工圖紙相關(guān)的設(shè)計(jì)8、變更文件;design change notes4.3 GB50202-20024.4 SP-8310-0000-0010 EARTHWORK SPECIFICATION4.5 PR-8710-8100-0013 SITE EXCAVATION AND BACKFILL5.0計(jì)量器具、工具及機(jī)械 tools and equipment計(jì)量器具:水準(zhǔn)儀、鋼卷尺M(jìn)easuring instrument: level and tape工具:小推車。 Tool: wheelbarrow 機(jī)械:YZ-18振碾式壓路機(jī)一臺(tái)、裝載機(jī)一臺(tái)、振動(dòng)式打夯機(jī)一臺(tái)、抽水機(jī)5臺(tái)(所有機(jī)械進(jìn)廠前應(yīng)進(jìn)行認(rèn)真檢查,并報(bào)有關(guān)部9、門審查通過后方能進(jìn)入現(xiàn)場(chǎng)施工)machines: 1 roller, 1 loader, 1 rammer,5 water pumps.6.0勞動(dòng)力組織 labors技術(shù)員1人,施工員1人,測(cè)量員1名、安全員1名,質(zhì)檢員1名,壯工20名,熟練操作工3名。1 technician, 1 supervisor, 1 surveyor, 1 HSE member, 1 inspector, 20 labors and 3 operators.7.0施工工序和施工方法 procedure and method7.1施工工序 procedure砂石回填施工工序?yàn)椋翰牧先雸?chǎng)(帶試驗(yàn)合格證/拌合報(bào)告) 驗(yàn)槽10、檢查材料含水率(5.3%),并提供報(bào)告砂石回填(每30cm一層) 砂石碾壓(68次) 每層檢查并取樣試驗(yàn),并提交壓實(shí)率試驗(yàn)報(bào)告 壓實(shí)率合格(壓實(shí)率96%)后進(jìn)行上一層砂石回填重復(fù)上述步驟,直至回填至設(shè)計(jì)標(biāo)高。Ingress of the material to the job site (with the material test certificate/blend report) conformity inspection for base groundinspection of water content(5.3%) of material and check report issued11、 backfilling (30cm each layer) compaction(68 times) final inspection and check report issued for compact rate of each layer proceed to backfilling if the compact rate meet requirements (Compact Rate96%).Repeat above steps till the design elevation.7.2施工方法 method7.2.1回填材料要求 requirement of backfilling12、 materials回填材料為購買攪拌好的砂石(碎石、卵石最大粒徑20mm,砂:中粗砂且細(xì)度模數(shù)2.33.7,混合料中碎石、卵石含量40%)。拌合料進(jìn)場(chǎng)前,應(yīng)提供碎石、砂的試驗(yàn)報(bào)告,并對(duì)配合后的混合料進(jìn)行檢測(cè)。取樣進(jìn)行擊實(shí)試驗(yàn),并采用篩析法進(jìn)行級(jí)配試驗(yàn)。Material is mixed sand and gravel at a portion of 40% of gravel and scree (Diameter of gravel and scree20mm, sand defined as medium and coarse sand with fineness modulus ran13、ge 2.33.7). Before ingress of the material to the job site, the test report of the sand and gravel should be furnished. And the material after blend should be tested. Compaction test and grading test shall be carried out as well.7.2.2基底處理 base treatment 回填前先清理基底,清除基坑內(nèi)積水、淤泥和雜物,并防止地表滯水流入回填區(qū)域。清理完畢,進(jìn)行基坑14、驗(yàn)收,符合要求方可進(jìn)行砂石回填。The base shall be cleared, without any water, sullage and debris. The surface water shall be prevented into the backfilled area. The groundwork of the footing groove check before acceptance, and it should be acceptable before backfilling.7.2.3碎石回填 gravel backfilling7.2.3.1正式回填前,現(xiàn)場(chǎng)進(jìn)行試15、碾,確定壓實(shí)遍數(shù)及含水率,以達(dá)到最好的碾壓效果。試碾后,根據(jù)確定的壓實(shí)遍數(shù)及含水率進(jìn)行大面積施工。To carry out trial compaction before backfilling to determine the compaction times and water content to get a optimum effect.7.2.3.2碎石料場(chǎng)布置見附件(碎石堆放布置及入口設(shè)置)。Gravel storage arrangement see attachment.7.2.3.3基坑修設(shè)機(jī)械通道見附件(碎石堆放布置及入口設(shè)置)。The access for machine16、s see attachment.7.2.3.4本項(xiàng)施工采用機(jī)械回填,在振碾式壓路機(jī)碾壓之前先用裝載機(jī)將碎石推平,使表面平實(shí),后使用振碾式壓路機(jī)先靜壓,后振壓。This work is to be implemented by machines. First to level the gravel, then compact without vibration by road roller, finally vibrantly compact the soil.7.2.3.5碾壓機(jī)械壓實(shí)填方時(shí),控制行駛速度,并控制壓實(shí)遍數(shù)。The compaction speed and times shal17、l be controlled.7.2.3.6采用“薄填、慢駛、多次”的方法,砂石回填厚度為300mm,碾壓方向從兩邊逐漸壓向中間,碾輪每次重疊寬度約為1525cm,避免漏壓。運(yùn)行中碾輪邊距填方邊緣大于500mm,防止溜坡傾倒。邊角、邊坡邊緣壓實(shí)不到之處,輔以振動(dòng)式打夯機(jī)夯實(shí)。每碾壓一層完后,用裝載機(jī)將表面拉毛以利結(jié)合。The method of “ thin layer, slow speed and many times” is to be used. The layer thickness is to be 30mm, and compaction from two sides to t18、he center with overlapped width of 15-25cm of each time. The wheel side shall be 500 mm away from the edge to prevent any upsetting. The rammer is to be used for the places where the roller couldnt reach. The surface of last layer shall be made coarse by loader shovel for sound incorporation with ne19、xt layer.7.2.3.7根據(jù)確定的碾壓遍數(shù)進(jìn)行施工,保證遍數(shù)足夠,控制砂石料的含水率(在試碾后采用灌砂法測(cè)定最優(yōu)含水率為5.3%),保證砂石回填達(dá)到要求。Compaction should be according to the determinate times and guarantee the compaction times. The water content of the material should be controlled (the optimum water content of 5.3% is to be determined test) , and the b20、ackfilling should be up to standard.7.2.3.8砂石回填區(qū)保持中間稍高,兩邊稍低,當(dāng)天回填砂石當(dāng)天壓實(shí)。The center of the backfilled area shall be a little bit higher than the sides, and the backfilled gravel and sand shall be compacted in the same day.7.2.3.9每層材料壓實(shí)后,按要求進(jìn)行取樣檢測(cè),發(fā)布檢測(cè)報(bào)告,壓實(shí)率必須96%,方可進(jìn)行下層施工。振碾機(jī)碾壓區(qū)域密度及含水率試驗(yàn)每層5組,振動(dòng)打夯機(jī)夯實(shí)區(qū)域密21、度及含水率試驗(yàn)每層1組。Quality inspection shall be taken, including Inspect Report Form which indicating the Compact Rate for each layer, and the standard (Compact Rate96%) must be attained, before backfilling the next layer. Sampling for unit weight and water content test in the area compacted be vibrating ro22、ller shall be 5 groups each layer, while sampling in the area by rammer is to be 1 group each layer.7.2.4施工排水和雨季施工措施Construction drain, and measures during rainy season7.2.4.1基坑周圍設(shè)擋水壩(高度至少50cm),防止地表水流入回填區(qū)域內(nèi)。Claybank(the height50cm) should be used to prevent the surface water from flowing into the ba23、ckfilling area.7.2.4.2在回填區(qū)域東西兩端設(shè)集水坑,加設(shè)潛水泵進(jìn)行排水,潛水泵的設(shè)置應(yīng)能保證在基坑回填過程中,不得有水浸泡回填材料。Catchment puddle should be used at the east and west of the backfilling area, and water pump should be used to drain. 7.2.4.3 在雨季回填時(shí),排水溝和集水井分別加深至0.5m和0.7m深,并增加水泵(5臺(tái)備用水泵)和人力,以保證基坑內(nèi)雨水經(jīng)排水溝、集水井和水泵立即排出基坑外。回填材料經(jīng)受雨淋后,則停止下步回填,待回填材料經(jīng)24、處理且試驗(yàn)確定其(含水率為5.3%)滿足設(shè)計(jì)要求后,方可進(jìn)行下步施工.During rainy season, the ditches and catchment puddles in foundation pits will be deepened respectively to 0.5m and 0.7m, in addition more pumps (5 spare pumps) and labor fore will be provided to guarantee that rainwater be drained away out of foundation pits on time. If material be poured by raining, work will not start until the material is disposed to meet requirements (water content 5.3%).8附件 attachment
會(huì)員尊享權(quán)益 會(huì)員尊享權(quán)益 會(huì)員尊享權(quán)益
500萬份文檔
500萬份文檔 免費(fèi)下載
10萬資源包
10萬資源包 一鍵下載
4萬份資料
4萬份資料 打包下載
24小時(shí)客服
24小時(shí)客服 會(huì)員專屬
開通 VIP
升級(jí)會(huì)員
  • 周熱門排行

  • 月熱門排行

  • 季熱門排行

  1. 城市主供水管及備用原水管工程管道安裝施工組織設(shè)計(jì)方案105頁.doc
  2. 山西長(zhǎng)治長(zhǎng)豐綜合(43萬方)項(xiàng)目(住宅+酒店+商業(yè)+辦公)建筑方案設(shè)計(jì)(246頁).pdf
  3. 2025預(yù)算員最全造價(jià)筆記包.zip
  4. 貴陽南明區(qū)地塊項(xiàng)目(住宅、商業(yè)+辦公+學(xué)校)建筑方案設(shè)計(jì)(311頁).pdf
  5. 西安金輝世界城J地塊綜合體項(xiàng)目建筑設(shè)計(jì)方案(318頁).pdf
  6. 蔬菜大棚鋼結(jié)構(gòu)施工組織設(shè)計(jì)方案(65頁).pdf
  7. 全輕混凝土地坪施工方案.doc
  8. 邊坡治理工程錨索錨桿格構(gòu)梁施工技術(shù)交底.doc
  9. 陳列布展廳建設(shè)工程電氣安裝展廳電子及裝飾裝修安全施工方案46頁.doc
  10. 大酒店公共區(qū)域及客房區(qū)域室內(nèi)裝修改造工程墻面軟包施工組織設(shè)計(jì)86頁.doc
  11. 醫(yī)院住院綜合大樓智能化弱電系統(tǒng)工程施工組織設(shè)計(jì)方案(151頁).doc
  12. 蔬菜大棚土建、鋼結(jié)構(gòu)工程施工組織設(shè)計(jì)方案(66頁).doc
  13. 雨、污水管道工程PVC—U雙壁波紋管施工方案(37頁).doc
  14. 熱電聯(lián)產(chǎn)機(jī)組工程排水槽廢水池防腐施工安全專項(xiàng)方案(12頁).doc
  15. U型渠道建設(shè)工程施工組織設(shè)計(jì)方案(52頁).doc
  16. 秦皇島市北環(huán)路道路改造工程監(jiān)理大綱(346頁).PDF
  17. 幼兒園建設(shè)工程項(xiàng)目可行性研究報(bào)告(486頁).doc
  18. 物業(yè)公司如何提高業(yè)主滿意度、提升服務(wù)質(zhì)量演講課件.pptx
  19. 杭州 ·長(zhǎng)嶺居別墅項(xiàng)目故事線策劃方案.pdf
  20. 融創(chuàng)武義小鎮(zhèn)旅游度假項(xiàng)目故事線營銷推廣方案.pdf
  21. 2020江山悅地產(chǎn)項(xiàng)目故事線構(gòu)建推廣方案.pdf
  22. 建筑大理石、花崗石干掛施工工藝(5頁).doc
  1. 服裝店鋪形象維護(hù)細(xì)則及獎(jiǎng)懲管理制度.doc
  2. 城市主供水管及備用原水管工程管道安裝施工組織設(shè)計(jì)方案105頁.doc
  3. 水泥混凝土路面工程施工方案(17頁).doc
  4. 水泥混凝土路面工程專項(xiàng)施工方案(17頁).doc
  5. 2023年版建筑公司30套施工方案編制指南(1041頁).pdf
  6. 生態(tài)治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  7. 山西長(zhǎng)治長(zhǎng)豐綜合(43萬方)項(xiàng)目(住宅+酒店+商業(yè)+辦公)建筑方案設(shè)計(jì)(246頁).pdf
  8. 2024年建筑公司機(jī)電安裝工程質(zhì)量創(chuàng)優(yōu)策劃方案(108頁).docx
  9. 商業(yè)街夜市市集U+夜市定位規(guī)劃方案(73頁).pptx
  10. 生態(tài)治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  11. 地下停車場(chǎng)環(huán)氧地坪漆施工方案(19頁).docx
  12. 學(xué)生宿舍室外市政道路工程雨水管道工程施工組織設(shè)計(jì)方案(19頁).doc
  13. 工程施工機(jī)械車輛設(shè)備租賃合同(12頁).docx
  14. 中建二局-201號(hào)辦公質(zhì)保樓項(xiàng)目檢驗(yàn)和試驗(yàn)計(jì)劃方案(45頁).doc
  15. 花苑小區(qū)住宅樓工程新工藝新技術(shù)應(yīng)用施工方案(32頁).doc
  16. 土建、安裝、裝飾工程施工檢測(cè)試驗(yàn)計(jì)劃表.docx
  17. 安全生產(chǎn)管理體系及保證措施方案(59頁).doc
  18. 蔬菜大棚鋼結(jié)構(gòu)施工組織設(shè)計(jì)方案(65頁).pdf
  19. 冷卻水塔管道更換安裝施工方案(41頁).doc
  20. 綜合樓中央空調(diào)安裝施工組織設(shè)計(jì)方案(水、多聯(lián)機(jī))(166頁).doc
  21. 建筑工程造價(jià)失控的原因分析及控制(3頁).docx
  22. 抹灰工程施工方案(水泥砂漿)(20頁).docx
  1. 風(fēng)機(jī)安裝工程施工質(zhì)量強(qiáng)制性條文執(zhí)行記錄表(40頁).doc
  2. 鐵路特大橋高墩施工專項(xiàng)安全施工方案(48頁).doc
  3. 服裝店鋪形象維護(hù)細(xì)則及獎(jiǎng)懲管理制度.doc
  4. 東方國際休閑廣場(chǎng)商業(yè)定位與招商提案(51頁).ppt
  5. 建筑[2009]257號(hào)關(guān)于建立建筑業(yè)企業(yè)農(nóng)民工工資保證金制度的通知【5頁】.doc
  6. 城市垃圾中轉(zhuǎn)站升級(jí)改造工程項(xiàng)目可行性研究報(bào)告129頁.docx
  7. 湖州市南潯區(qū)石淙鎮(zhèn)國土空間總體規(guī)劃方案(2021-2035年)(草案公示稿)(39頁).pdf
  8. 河南省城市基礎(chǔ)設(shè)升級(jí)改造項(xiàng)目可行性研究報(bào)告(107頁).doc
  9. 城市220kV電力線路改造工程項(xiàng)目可行性研究報(bào)告94頁.doc
  10. 電力公司樁基、墩基施工組織設(shè)計(jì)方案(38頁).doc
  11. 800MW光伏40MWh儲(chǔ)能光伏示范項(xiàng)目可行性研究報(bào)告306頁.pdf
  12. 2023珠海城市主干道道路升級(jí)改造工程項(xiàng)目可行性研究報(bào)告305頁.pdf
  13. 2023城鎮(zhèn)老舊小區(qū)配套基礎(chǔ)設(shè)施建設(shè)項(xiàng)目可行性研究報(bào)告(163頁).pdf
  14. 城市主供水管及備用原水管工程管道安裝施工組織設(shè)計(jì)方案105頁.doc
  15. 2022城市更新改造補(bǔ)短板老舊小區(qū)改造項(xiàng)目可行性研究報(bào)告(206頁).docx
  16. 2023年城鎮(zhèn)老舊小區(qū)改造及配套基礎(chǔ)設(shè)施建設(shè)項(xiàng)目可行性研究報(bào)告(84頁).pdf
  17. 2023生活區(qū)城鎮(zhèn)老舊小區(qū)改造項(xiàng)目可行性研究報(bào)告(附圖)(121頁).pdf
  18. 房產(chǎn)中介公司員工入職業(yè)務(wù)銷售技能培訓(xùn)資料合集.zip
  19. 縣城配電網(wǎng)110kV輸變電工程項(xiàng)目可行性研究報(bào)告266頁.doc
  20. 水天苑小區(qū)地源熱泵空調(diào)系統(tǒng)設(shè)計(jì)方案(149頁).doc
  21. 2023城鎮(zhèn)老舊小區(qū)改造項(xiàng)目可行性研究報(bào)告(122頁).pdf
  22. 淮南礦業(yè)集團(tuán)棚戶區(qū)改造項(xiàng)目八公山新村、和平村室外變配電工程施工組織設(shè)計(jì)方案(92頁).doc
主站蜘蛛池模板: 兰西县| 紫云| 重庆市| 商都县| 罗平县| 江阴市| 平昌县| 文成县| 高碑店市| 永福县| 江源县| 襄樊市| 镇巴县| 马边| 和顺县| 筠连县| 黄山市| 三台县| 桑日县| 香河县| 铁力市| 连山| 翼城县| 七台河市| 繁昌县| 石城县| 中牟县| 商丘市| 定陶县| 潜江市| 仙桃市| 鄂伦春自治旗| 遂溪县| 神农架林区| 定陶县| 绥棱县| 囊谦县| 普定县| 玉林市| 吉安县| 乌鲁木齐县|