土方明挖英文施工方案constructionmethodstatement(9頁)
土方明挖英文施工方案constructionmethodstatement(9頁).doc
下載文檔 下載文檔
其它文檔
上傳人:正*** 編號:476618 2022-07-22 9頁 85KB

下載文檔到電腦,查找使用更方便

10 金幣

  

還剩頁未讀,繼續閱讀

1、BAKUN HYROELECTRIC PROJECT, MAIN CIVIL WORKSMAIN DAM AND POWERHOUSE EXCAVATION1.MAIN DAM FOUNDATION EXCAVATION1.1 OBJECTIVEThe main objective of this method statement is to describe in detail the sequence of works and establish priorities of work to allow embankment filling to start by scheduled in 2、the baseline programme on 17-Jan-2003. An immediate objective will be to expedite works and expose the plinth at the dam foundation for geotechnical investigation. This method statement and includes the following: Haul roads and disposal areas, Preparation of secondary river crossings, Dewatering, P3、reparation of loading platform, and Earth/rock excavation for integrated cofferdam foundation.1.2 ZONING OF WORK AREAS:From the drawing, by drawing a line connecting the highest point of the ridges of both left and right banks, the main dam work area is divided into the following work zones: Area 1:4、 From downstream face of auxiliary cofferdam to the dam axis of integrated cofferdam; Area 2: From the dam axis of integrated cofferdam to the main dam axis, below elevation 130m for the right bank, below elevation 140 for the left bank, and including the riverbed. Area: From the main dam axis to th5、e down stream limit of Main Dam, below elevation 130m for the right bank, below elevation 140 for the left bank, and including the riverbed downstream of MD Axis. Area 4: From the dam axis of integrated cofferdam to downstream limit of the Main Dam, above elevation 130m for the right bank, above ele6、vation 140 for the left bank.Each work zone is is further divided into sub-areas, each subdivision is basically defined into left abutment, riverbed and right abutment sections. Please refer to drawing no. MDEX-MS-001 (Attachment 1)1.3 METHODOLOGY1.3.1 Preparation of Haul Roads & Disposal Areas1.3.17、.1 Haul RoadsThe following haul roads shall be prepared for haulage of excavated material: Road R1: Main haul road Road R1-1: Connects right abutment at EL 210 to R1. Road R1-2: From loading platform at Right Abutment EL 130, to the upstream face of auxiliary cofferdam, and connected to R2 at Down S8、tream. Road R2: From loading platform at Right Abutment EL 70, to the disposal areas near W4, and Northern side of W6. Road L2: From riverbed EL 50 to disposal areas near W4, and Northern side of W6.Please refer to “Access Road Arrangement for Main Dam/Power House Excavation- First Stage” (Attachmen9、t 2) 1.3.1.2 Disposal AreasThe designated disposal areas will be as follows: Upstream face of auxiliary cofferdam: Designated as disposal area and at the same time a 20m-width access road across the river is to be constructed adjacent to the auxiliary cofferdam. Near W4: Disposal area at low line ar10、eas adjacent to W4. Northern side of W6: Disposal area at low line areas at Northern side of W6. W 14, and W 15.Please refer to Attachment 3”Disposal Area & Temporary Stockpile for Main Dam and Powerhouse Excavation” for the layout plan of the aforesaid disposal areas.1.3.2 Method of Overburden Exca11、vationThe following loading platforms shall be prepared to collect the material (earth/rock) pushed from the higher elevation: Top platform for the interfacing with the main dam excavation:o Right Abutment:EL 130o Left Abutment:EL 140The above platforms shall be at least 15m width. It shall be prepa12、red by forming temporary slope from higher elevation and shall be benched deeper into the design formation of slightly weathered/sound rock layer.As for the Main Dam excavation above elevation EL 130 (Right) and EL 140 (Left), the aforesaid platforms will serve as loading platforms to collect excava13、ted material pushed downslopes from higher elevation working areas. Intermediate platform This will serve as an intermediate collecting point for excavated material to control the overall dozing distance within 30m 40m.o Right Abutment:EL 100 and EL 70Following the topography and terrain at the righ14、t abutment where there are well-defined mountain ridges and gullies, intermediate platforms will be constructed in between ridges. The area will be cleared from logs or undergrowth, slopes trimmed to provided wider area, and filling to form the platform.o Left Abutment:NilThere are no apparent ridge15、s at left abutment. In addition, the thickness of overburden at the left bank is comparatively thinner and the original slope is comparatively steeper than the right bank. Hence, intermediate platforms becomes unfeasible at this area. Final platform Located at the riverbed at approximately EL 50. Fo16、rmed by the excavated material pushed towards the riverbed during the process of foundation excavation, will served as the final loading platform before the riverbed is to be excavated up to the required rock strata. This platform will mainly serve to load and haul overburden pushed downslopes from 17、the leftbank excavations.Pleas refer to drawing MDEX-MS-001 (Attachment 1).1.3.3 Filling of Secondary Crossings/Bunds.Secondary crossings will be constructed across, by filling the riverbed with suitable material taken from excavation works forming a crossing to both banks, and, also, sectionalise t18、he riverbed work areas. This is to minimize interference of works when excavation works of riverbed and upper elevation are carried out simultaneously at alternate zones. These crossings will also serve containment bunds to prevent excavated material from contaminating the integrated cofferdam work 19、areas.By forming these crossings, the river is “transformed into ponds”, and these allows dewatering of the river to be segmentalized.1.3.4 DewateringA combination of 10 and 14” water pumps will be stationed at separate segments of riverbed. Two -720,000 gallons per day pumps will be installed at th20、e downstream side of the river. Smaller pumps may be installed at the river sections formed by the riverbund, to keep and maintain the area dry during riverbed excavation and plinth construction.1.4 IMPLEMENTATION PROGRAM1.4.1 Time FrameThe time frames for respective zones are summarized as follows:21、o Zone 125-Aug-03 to 07-Oct-03o Zone 220-Aug-03 to 19-Dec-03o Zone 301-Oct-03 to 15-Jan-04o Zone 401-Dec-03 to 20-Dec-04.Please refer to Work Program on Main Dam Excavation (Attachment 4) for details.1.4.2 ResourcesRefer to Attachment 5: Table of Work Areas and Processes” and Attachment 6: “Main Dam22、 Excavation Equipment”1.5 SAFETY As a safety barrier, gabion wall in 2-1 arrangement shall be built (if necessary) as protective armor at the upper platforms (mentioned in Section 1.3.2) to prevent materials pushed downslopes from causing injuries to works at the lower sections of the dam. These gab23、ions will also serve to contain excavated materials, sludges, debris and other objects from contaminating embankment work and permanent excavation slopes. The gabion walls will be “wrapped” with geotextiles to allow clean water pass through to the cut off drains.Also, cut off trenches, of sufficient24、 shall also be provided at the upper platforms which will also prevent runoff carrying silt from contamination the dam foundation at lower elevation.Kindly refer to Attachment 7: Section View of Typical Work Sequence.2.POWER HOUSE FIRST STAGE EXCAVATION ABOVE ELEVATION 70M2.1 OBJECTIVEThis method st25、atement is prepared to strengthen the Overall Method Statement that submitted earlier for further elaborating in detailed the sequence of excavation works that related to the overburden and rock excavation for the Powerhouse. This method statement is to cover the following contents:i. Haul roads;ii.26、 Overburden excavation;iii. Rock excavation;iv. Slope protection works;v. Dewatering;ix.Foundation preparation;2.2 ZONINGBy considering the accessibility and haul road arrangement, the powerhouse can be divided in the following work zones: Area 1: From elevation 190m to elevation 145m; Area 2: From 27、elevation 145m to elevation 115m; Area 3: From elevation 115m to elevation 70m.Please refer to drawing no. PHEX-MS-001 (Attachment 8)2.3 METHODOLOGY2.3.1 Preparation of Haul Roads & Disposal Areas2.3.1.1 Haul RoadsThe following haul roads shall be prepared for haulage of excavated material: Road L2-28、2: Trunk haul road for Powerhouse excavation at Area 3 (Downstream) Road L1-1: Trunk haul road for Powerhouse excavation at Area 2 (Upstream)Please refer to “Access Road Arrangement for Main Dam/Power House Excavation- First Stage” (Attachment 2) 2.3.1.2 Disposal AreasThe designated disposal areas w29、ill be as follows: Near W4: Disposal area at low line areas adjacent to W4. Northern side of W6: Disposal area at low line areas at Northern side of W6.The extracted rock from Powerhouse that suitable for embankment fill for the Main Dam will be directly utilized for the main dam filling or will be 30、temporary stockpile at the following designated stock yards: Platform next to the Adit for the diversion tunnels; The platform between W4 and existing access road.Please refer to Attachment 3”Disposal Area & Temporary Stockpile for Main Dam and Powerhouse Excavation” for the layout plan of the afore31、said disposal areas.2.3.2 Method of Overburden/Rock Excavation2.3.2.1 Overburden/Rock Excavation Area 1At Area 1, the excavation of overburden will be started from the twin peaks apart; the working platforms are relatively smaller and more congested. The most suitable method for overburden excavatio32、n at this stage is suggested to be by way of throwing down the said materials by hydraulic excavator and bulldozer from the top of the cut slope in stages to form the benches for rock blasting. The materials will be subsequently pushed down to lower point el. 145m and pile up for collecting and load33、ing by hydraulic excavators then disposed off using 20 tons/30 tons dump trucks in later stage.At this stage, all materials including earth and rock will be pushed down to lower elevation, and due to no access road (due to very steep terrain,), the segregation of usable and unusable material is not 34、feasible. It is inevitable that all excavated materials from area 1 will be contaminated and will therefore be hauled to disposal area at W6 or W4.2.3.2.2 Overburden/Rock Excavation Area 2At Area 2, excavation will be done by the conventional method of direct load and haul. The excavated material sh35、all be collected by bulldozer, loaded using hydraulic excavator/wheel loader, and hauled to by 30t/20t dumper.Haul road L 1-1 will be used as trunk access road for the haulage. The profile and alignment for haul road L 1-1 may be branched from time to time in accordance to the overall elevation of e36、xcavation.2.3.2.3 Overburden/Rock Excavation Area 3With reference to the drawings, the twin peak of powerhouse excavation will be merged as a larger area of excavation at el. 130m. As such the excavation can be done by the conventional method of direct load and haul. The excavated material shall be 37、collected with bulldozer, loaded with hydraulic excavator/wheel loader and hauled by 30t/20t dumper.Haul road L 2-2 will be used as trunk access road for the haulage. The profile and alignment for haul road L 2-2 maybe branched from time to time in accordance to the overall elevation of excavation.I38、n order to expedite excavation of overburden at this stage, there will be substantial degree of pushing down of overburden material downslopes, to the loading platform at riverbed area. These overburden materials shall be disposed of at a later stage to W6. Rock that can be used for embankment filli39、ng or aggregates will be will be salvaged and transported separately to the designated stockpile areas, crushing plant or directly be utilized as main dam filling.2.3.3Temporary Diversion and DrainagePrior to the excavation of spillway, the existing creek between two ridges of this area will cause t40、he major impact to the powerhouse excavation. With reference to the design drawings, in order to integrate with the permanent berm drain design, a temporary drain is to be provided to join with the permanent berm drain at el. 130. The runoff of the said creek will then be collected and diverted thro41、ugh the slope drains and discharged to Batang Balui through the berm drain at el.70m.Should the said berm drain have failed to cater the runoff from the existing creek, dimension and size of the berm drains at el.130 shall be reviewed and modified to suit the actual site condition and to satisfy the42、 drainage requirement.Precipitation and wastewater during the period of construction will be discharged through the berm drains and slope drains. Reference is made to Attachment 8: Drainage System Layout 2.4 SLOPE PROTECTIONWorks for slope protection will follow closely excavation works. As a genera43、l rule, as soon as one berm layer is excavated, slope protection works will be carried out as per construction drawings prior to continuing with excavation of the next bench. As a general method, each berm (15meters) will be bench blasted into 3 stages or layers ( 5 meters per layer). This is to all44、ow a working platform for the equipment, and slope protection works can proceed without need of scaffolding. In cases where the slope has been cut into its full bench, scaffolding will have to be installed for slope protection works.2.5 IMPLEMENTATION PROGRAM2.5.1 Time FrameThe time frames for respective zones are summarized as follows:o Area 110-Aug-03 to 06-Oct-03o Area 204-Oct-03 to 20- Nov-03o Area 304-Nov-03 to 18-Jan-04Please refer to the attachment 9: WORK SCHEDULE2.5.2 ResourcesRefer to Attachment 10: Manpower and EquipmentPage 9 of 9
會員尊享權益 會員尊享權益 會員尊享權益
500萬份文檔
500萬份文檔 免費下載
10萬資源包
10萬資源包 一鍵下載
4萬份資料
4萬份資料 打包下載
24小時客服
24小時客服 會員專屬
開通 VIP
升級會員
  • 周熱門排行

  • 月熱門排行

  • 季熱門排行

  1. 水泥混凝土路面工程施工方案(17頁).doc
  2. 水泥混凝土路面工程專項施工方案(17頁).doc
  3. 生態治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  4. 2024年建筑公司機電安裝工程質量創優策劃方案(108頁).docx
  5. 學生宿舍室外市政道路工程雨水管道工程施工組織設計方案(19頁).doc
  6. 醫院住院綜合大樓智能化弱電系統工程施工組織設計方案(151頁).doc
  7. 生態治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  8. U型渠道建設工程施工組織設計方案(52頁).doc
  9. 黑龍江省伊春市國家森林城市建設總體規劃方案(2020-2030年)(224頁).docx
  10. 10萬噸水廠城市供水工程施工方案(163頁).doc
  11. 施工現場文明施工制度及措施【19頁】.doc
  12. 供熱管網施工方案(223頁).docx
  13. 建筑工程造價失控的原因分析及控制(3頁).docx
  14. 工程施工機械車輛設備租賃合同(12頁).docx
  15. 丹陽市“十四五”新能源汽車及零部件產業發展規劃方案(2021-2025年)(135頁).pdf
  16. 綜合性大樓玻璃幕墻、鋁合金門窗、玻璃地彈門、金屬板幕墻、石材幕墻、雨棚、欄桿施工方案【174頁】.doc
  17. 物業公司應急預案匯編(128頁).doc
  18. 鄉村道路及給水管網施工組織設計方案(102頁).doc
  19. 再生水廠建設運營項目EPC工程施工組織設計方案(465頁).doc
  20. 綜合醫院弱電智能化系統工程設計方案(173頁).doc
  21. 重慶龍湖小區業主對龍湖小區戶型設計評價定性研究報告(91頁).ppt
  22. 綠色建筑與綠色施工組織方案.pptx
  1. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  2. 服裝店鋪形象維護細則及獎懲管理制度.doc
  3. 建筑[2009]257號關于建立建筑業企業農民工工資保證金制度的通知【5頁】.doc
  4. 水泥混凝土路面工程施工方案(17頁).doc
  5. 水泥混凝土路面工程專項施工方案(17頁).doc
  6. 2023年版建筑公司30套施工方案編制指南(1041頁).pdf
  7. 2024年建筑公司機電安裝工程質量創優策劃方案(108頁).docx
  8. 基地燃氣系統維修工程管道閥門安裝維護保養施工方案30頁.doc
  9. 生態治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  10. 商業街夜市市集U+夜市定位規劃方案(73頁).pptx
  11. 生態治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  12. 地下停車場環氧地坪漆施工方案(19頁).docx
  13. 安全生產管理體系及保證措施方案(59頁).doc
  14. 學生宿舍室外市政道路工程雨水管道工程施工組織設計方案(19頁).doc
  15. 工程施工機械車輛設備租賃合同(12頁).docx
  16. 中建二局-201號辦公質保樓項目檢驗和試驗計劃方案(45頁).doc
  17. 綜合樓中央空調安裝施工組織設計方案(水、多聯機)(166頁).doc
  18. 房地產公司如何成為銷售明星培訓課件(21頁).pdf
  19. 建筑工程造價失控的原因分析及控制(3頁).docx
  20. 抹灰工程施工方案(水泥砂漿)(20頁).docx
  21. 新營社區城中村改造項目內墻及頂棚乳膠漆施工方案(10頁).doc
  22. 江西九江湖口盛世中央城城市綜合體項目招商手冊(20頁).ppt
  1. 風機安裝工程施工質量強制性條文執行記錄表(40頁).doc
  2. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  3. 服裝店鋪形象維護細則及獎懲管理制度.doc
  4. 東方國際休閑廣場商業定位與招商提案(51頁).ppt
  5. 建筑[2009]257號關于建立建筑業企業農民工工資保證金制度的通知【5頁】.doc
  6. 城市垃圾中轉站升級改造工程項目可行性研究報告129頁.docx
  7. 湖州市南潯區石淙鎮國土空間總體規劃方案(2021-2035年)(草案公示稿)(39頁).pdf
  8. 河南省城市基礎設升級改造項目可行性研究報告(107頁).doc
  9. 城市220kV電力線路改造工程項目可行性研究報告94頁.doc
  10. 電力公司樁基、墩基施工組織設計方案(38頁).doc
  11. 800MW光伏40MWh儲能光伏示范項目可行性研究報告306頁.pdf
  12. 2023珠海城市主干道道路升級改造工程項目可行性研究報告305頁.pdf
  13. 2023城鎮老舊小區配套基礎設施建設項目可行性研究報告(163頁).pdf
  14. 2022城市更新改造補短板老舊小區改造項目可行性研究報告(206頁).docx
  15. 2023年城鎮老舊小區改造及配套基礎設施建設項目可行性研究報告(84頁).pdf
  16. 2023生活區城鎮老舊小區改造項目可行性研究報告(附圖)(121頁).pdf
  17. 房產中介公司員工入職業務銷售技能培訓資料合集.zip
  18. 縣城配電網110kV輸變電工程項目可行性研究報告266頁.doc
  19. 水天苑小區地源熱泵空調系統設計方案(149頁).doc
  20. 2023城鎮老舊小區改造項目可行性研究報告(122頁).pdf
  21. 施工進度橫道圖.xls
  22. 淮南礦業集團棚戶區改造項目八公山新村、和平村室外變配電工程施工組織設計方案(92頁).doc
主站蜘蛛池模板: 中西区| 二手房| 荥阳市| 肥东县| 鄂尔多斯市| 图木舒克市| 洞口县| 屏东县| 罗江县| 上饶县| 仁寿县| 新源县| 应用必备| 东台市| 卢湾区| 黄浦区| 阳原县| 陵水| 本溪| 景谷| 武定县| 美姑县| 宁南县| 阜阳市| 和龙市| 江阴市| 永清县| 聂拉木县| 武定县| 广丰县| 托克逊县| 个旧市| 湘阴县| 曲阳县| 五台县| 仲巴县| 紫金县| 奉贤区| 宾川县| 开封县| 化隆|