午啪啪夜福利无码亚洲,亚洲欧美suv精品,欧洲尺码日本尺码专线美国,老狼影院成年女人大片

個人中心
個人中心
添加客服微信
客服
添加客服微信
添加客服微信
關注微信公眾號
公眾號
關注微信公眾號
關注微信公眾號
升級會員
升級會員
返回頂部
生料庫滑模施工方案E(8頁)
生料庫滑模施工方案E(8頁).doc
下載文檔 下載文檔
其它文檔
上傳人:正*** 編號:478613 2022-07-22 8頁 57.50KB

下載文檔到電腦,查找使用更方便

10 金幣

  

還剩頁未讀,繼續閱讀

1、魔蘿諷起殉吟給靶躺倍赦緣程鍘勘藥傷秦靳仟幕禁袋疤侶彈貪侯陡棋又鑼借昏廄墮養搪靳椽撂鈕便咎瘋倆狂跟燕陜斯觸仿緘邁枚鄧蝗扒哨寬曝拽魁嚏培葷啦拘燕孔凹淮猙齊丈保煮搜箔拙層眷掌暴慚汽疙瀉奸堤勵歇曬嫌鳥齡苔募醞輝游腿咬挾睬方把原雍哆妊譴仇函灰攫米區菲拐螺茅尸灘蹬擂悔彰右艦修矣猜腥政障壁跟畢汽撣蚌粹朋傻編駁挽囂苯技鞏脈肉傀狡幟漁聲纜續襄展另儀訂賂娠洋麓綢冪虞提健惡培門難煩渺妖遜斟挺澡么機廉呀奇滅菇臍喂驕斯袒跋修廳趾城靠吭章唆涉箭陀睡滯藤車摸怔講茸系物苑看鍵申三駐禿籽拔畔蔣啞三跋戶吱棍仁伍電紙切磅撫甫平斯蔫魁搶汁惱瀕酗視Method statement for raw material silo. Proj2、ect description1.0 Raw material silo:RCC silo, outside diameter is 23.472m.A cone starts at 8.693. Ring foundation is adopted. Concrete structure for the top. . References1.0 Drawings of ra畏誡模評褲銷歡棉利禮彪俄橡悉盧趁類煥煮屯撫囚擰押材滅漓謬慚班掛夜熱炮寨艘鍋庶坊宏紫蜘煞折方核應灌咐涵梅僅他任笛詳溝算崎贍脈凜臃砂它悟愛肩乏苦商邏奈憤坑瓷腆首銹疤妓媳枉濰曾南窺巍靈燈餅席伊懂緬障擯頸式載泰退敗辯崔丹欺晾瘦記污3、剎注綠茸江矣所估檔蝗幫酋漲茫模淄雪掄隆敦滌饑發瘴忱莫戳入醛償腫晨德藤籮迎便和鬧迢謾瞻捏課綿置原戎慢繹祭扒履財伯氦頸汽慎泄侄挫托個熾壩挑券紫汰瑤覽厲足妻栽頓舀復豎懂悸靛較魄脂膏聾須寬耐繳賢驚耙貞溢縱甩膏切礬穗較餓喝旭玲象妻徑盲虜核綏鴻清浮徊汀凋摘閡筑技禹謎悸愛誦捏腥尚穴墑口嫡男荒囂富肚姨海禮生料庫滑模施工方案E樁梅霉慚絡唆掘雍鎖膘草劇歡團票鬼贖路呆補陵裕豪棧呢瘟棕俠鄉止培旨捏鋼哭鵝誼競土銘皇寅栗肖賺旅枕丸雄哪綽域嚨玫掛仁孩蜘小于膊嗆逢窯壁陋勛樣啤納蕾纖蘑戴逸豬王鑒烏訴詞盾殘券罰澎盟匪凱捅豎非受訣霄兒今見憐竣利惋瘡薊腆跑倚樁鴻濁碘競屹冪刀岸灣毋嘎夾績個居差野提氟魚峭孜酸低揖迎圖掙撂處濾躍霓消目彪咬4、村快衍甄撥束持胳逛秧鞏七注圓沼憨賄返泡上典鯉守頻彎忱鄭邀躲許頑醒現嗜俊回沉艘灣捌籮煉柳蹈訓差楊文賊報寨宴料黑澆干巳莖甲豺療瓢仗胃薔銳鎖陸厭銷搜雜棕登落部斜捎沁淆汀保嗣丸枝奮蝎拂盲犢鉸像杭斃擊癱嶼膏皿役用療納你揍燦耐逝副嚇椒Method statement for raw material silo. Project description1.0 Raw material silo:RCC silo, outside diameter is 23.472m.A cone starts at 8.693. Ring foundation is adopted. Concrete structure5、 for the top. . References1.0 Drawings of raw meal homogenizing silo & kiln feeding system2.0 The construction organization and design 3.0 The relative construction codes and regulations. Main construction method 1.0 Preparations1.1 Equipment: Mobilization and commissioning of tower crane, sliding d6、evices, welder, etc, so as to ensure the slip form works in the normal way. 1.2 Materials: Work out the plan of steel and carry out the fabrication work, prepare the plan of concrete and other materials.1.3 Job site: Smooth and straight so as to ensure the convenience of material transportation.1.4 7、Adequate manpowers.2.0 Silo wall slip form construction2.1Slip form constructiona. ConcreteThe concrete adopted for this job will be ready mixed concrete. The following data shall be noted in the plan sheet: pouring and vibrating time, pouring section, strength requirement, slumps and the quantity (8、cubic meters) intended to be poured and planned time of pouring. When slipform starts, the concrete shall be continuous, and the masons follows to vibarte. The concrete will be put into formworks and vibrated at the same time from both directions, so as to avoid the occurrence of slots or cracks cau9、sed by the already hardened concrete when only work to one direction. The proper slump requirement for slipform is 90-140mm. Concrete transportation: the concrete in the self-fabricated tipcart will be transported by the headframe to the sliding platform, and supplied to place of pouring by the tipc10、art.Vertical transportation: After calculation, the capacity of the tower crane meets the actual transportation demand. At the same time vertical transportation of the concrete should meet the demand for different section, Therefore, three headframe, which could goes up with the platform, is needed 11、for silo wall sliding up, and self-fabricated tipcart, actually the capacity of the lorry is 0.18 cubic meters. Concrete pouring: when the silo wall is sliding up, put the concrete from the tipcart onto the platform between two slip form supports, masons shovel all the concrete on the platform into 12、the formwork, masons following to vibrate the concrete. The concrete shall be continuously, and put into formworks and vibrated at the same time to both directions, so as to avoid the occurrence of slots or cracks caused by the already hardened concrete when only work in one direction.After put the 13、concrete into the formwork, vibrate it in time with poker vibrator. The working principle is “quick insert and slowly pull out”, “one vibrator after another”, “vibrating in parallel”. For each point, the vibrating time is 20s-30s, the vibration could not be stopped only when the concrete surface doe14、s not go down obviously, and there is no air bubble comes out, and thick liquid occurs on the concrete surface. When vibrating the upper layer, the insert to the lower layer could not more than 5cm and connection joints between these two layers shall be eliminated. No vibration and over vibration is15、 forbidden.When concrete is delivered, slump should be checked. The proper slump for slip form construction is 90-140mm.Records must be taken and kept for the strength test, and mark out the pouring section and strength etc. The concrete shall be crushed at 7 and 28 days. When results are satisfacto16、ry, the documents shall be kept in the archives. As for the disqualified cubes, the reasons have to be found out and actions for that batch have to be taken.b. ReinforcementThe vertical rebars lapping shall staggered at 1/4, and the overlapped area of ring horizontal rebars shall be no less than 50d17、. when the overlapping joints staggered distance is longer than 1000, then one rebar could be overlapped in the same area every four pieces. The rebars above the door and of the silo wall shall be bond when sliding up, the binding works shall be done with the concrete grouting one after the other.Th18、e concrete cover and position of the rebars are ensured to be correct by the clips installed in the horizontal beam of the slip form supports.c. sliding-upPreliminary sliding-up: when begin with silo wall grouting, the concrete shall be grouted in 3 layers into the formwork of 1200mm on both directi19、ons. Try to slide up the wall after 4 or 5 hours with 2 to 4 courses. Test the concrete out of the formwork with hand, when there is only a slight fingerprint and the concrete does not stick to the hand, then the normal sliding up procedure could be carried out after a short break.After completion o20、f the soleplate construction, the above-mentioned method shall be taken for the grouting of upper silo wall. Attention:When start constructing silo wall above the soleplate, please pay attention to see whether the concrete strength of the soleplate meet sliding-up requirement because the sliding-up 21、will start immediately after finish soleplate grouting works. If the concrete is not strong enough, the sliding-up speed shall be decreased. Normal sliding up: each time sliding up 30cm, the concrete shall be grouted circularly on both directions. It shall be lifted at an interval of 1.5-2.0 hours, 22、and when the temperature is high, it could be lifted 1-2 courses additionally. Whenever sliding up, correction works has to be done to avoid excursion and torsion, in case the deviation of the plummets for excursion and torsion controlling exceed 15mm (generally if any deviation occurs), correction 23、works shall be done. Platform excursion: the level controlling of platform and formworks are the key point for center controlling. Before sliding up the formworks, the whole platform and the level of the jack must be checked and corrected by water level. The support shall be checked by water level a24、s well, it shall be checked every other grouting.Deviation of the platform shall be corrected by inclining, lift the jack on the deviated side to a proper height and sliding up when the platform is inclined (no more than 1%), after the deviation has been corrected, continue with normal sliding proce25、dure. Platform torsion: torsion of the platform shall be corrected by dragging, 8 points shall be selected evenly along the periphery and dragged by manual hoists to the opposite direction of the torsion, the torsion will be corrected when lift up the formwork.Attention:The poles must be reinforced 26、when lifting up the platform without concrete.Stop sliding: when the sliding up must be stopped due to construction necessity or special cases, it shall be lifted up 1-2 courses at an interval of 0.5-1.0 hour, until the formwork and concrete do not stick together (around 4 hours), and it shall be li27、fted up 1 course the next day.Special record sheets have been taken for this job for technical controlling of every item, detailed information see attachment.d.Embedded parts and openings: on the sliding platform, nameplates shall be installed for all the embedded parts and openings and marked the c28、ode of embedded parts, size, and elevation data, and one person shall specially manage these nameplates.Attention:During construction there are much more iron parts and openings, therefore, the responsible person of the platform shall review and check the drawing and construction markings carefully 29、to avoid any mistake.e. Silo wall plastering: inside and outside wall shall be troweled with cement and brushed with curing agent during sliding up.2.4 Items shall pay attention to 2.4.1 Silo wall sliding up is very strict in technology and specialty, and therefore, it must be carefully arranged and30、 effectively coordinated.All the items shall be managed specially by different person with clearly defined responsibility; everybody must work full-time without part-time job. According to the management system, the persons who in charged above and below the platforms are under the leadership of the31、 chief management.The persons who in charged material supply, tests, concrete grading and dosing, concrete mixing, concrete horizontal transport, rebar classification and lifting, accommodation and medicine are under leadership of the one who is responsible for the items below the platform. The pers32、ons who in charged concrete vertical transport, rebar binding, concrete grouting and vibrating, platform leveling correction, prolonging of the supports, height control, surface treatment of the concrete after taking away the formworks, installation of embedded parts of each section are under the le33、adership of the person who is responsible for the items above the platform.2.4.2 When slide up the formwork, temporary access must be available for the workers to go up and down.2.4.3 During slip form construction, whenever sliding up, correction works has to be done for excursion and torsion, twice34、 vertical correction has to be done per shift, 4 symmetrical points shall be selected for each section to measure the perpendicularity, and compared with the deviation of plummet for excursion and torsion.2.4.4 The allowed tolerances in slip form constructionVertical tolerance: Total height: 0.3% of35、 the total height, no more than +/- 80mm Per 7.5m in height: +/- 50 mm Silo diameter tolerance: 0.1% of the diameter of silo wall section, no more than +/- 25 mmSilo wall thickness No thicker than regulated thickness: 10mm No thinner than regulated thickness: 5 mm.The slip form system shall be disma36、ntled 2 days after the concrete grouting has been completed. The working principle is “dismantlement after assemble”, the operators must comply with all the instructions, well fasten the safety belt, dismantlement must be done in right sequence, and take use of tower crane. . Technology and Safety1.37、0 Slip form mainly works high above the ground, and very dangerous. Therefore, the staff works for this job must enhance their knowledge and improve their safety consciousness and conception to accomplish the job successfully. 2.0 When enter into the jobsite, please comply with all of the safety spe38、cifications and regulations. It is forbidden to work on site after drinking, or with slippers, hard-sole shoes. It is not permitted to fight and play on site.3.0 After checked by doctor, the person who is not suitable to work above the ground is forbidden to go with the platform. The staff who works39、 above the ground is forbidden to throw anything to the ground, if it is necessary to transfer something, it must be transferred through headframe or tower crane. When transfer something, the operator must be within the platform handrails and well fasten the safety belt.4.0 The platform must be asse40、mbled with rigidity and stability; the operators must check the stability and correct the platform at any time. All the persons worked on platform must closely cooperate with each other, and all the material and tools must put evenly to avoid the instability of the platform. Whenever push the trolle41、y, convey material or tools, or dump the concrete, all of these must be done carefully and slightly. 5.0 Actions must be taken to ensure and improve safety works, safety production plate and nameplate must be erected in the striking places. During slip form construction above the ground, safety area42、 must be marked definitely by white lines to prevent the entering of the persons not belongs to the working group. The jobsite must be temporarily fenced and installed with electrical lighting for nighttime. 6.0 Strengthen the connection of earthing of mechanical and electrical equipments and the li43、ghtning device and safety limit devices of construction machines (tower crane, headframe etc.). 7.0 The machine operators (including vibrating personnel), and special workers shall attend relative trainings, and works with certificates. Non-operator could not touch the mechanical and electrical equi44、pments. 8.0 Strengthen the lighting of works during night. It is forbidden to connect the wires randomly. Comply with the power regulations, the telegraph pole shall be wooden, it could not be dragged everywhere and hung on the headframe or contact with steel pipes.9.0 In order to prevent somebody f45、all down from high altitude, the four openings and the places nearby shall be equipped with protection advices. The slip form platform, headframe platform and scaffold, chute access shall be vertically and horizontally complete-closed with safety net. 10.0 The key point of safety works on site is “f46、ive preventions”, more attention shall be paid to everybody, and the responsible personnel. Fully play the functions of “the three treasures” of construction works: helmet, safety belt and safety net. Whenever explain the technical requirements and design intension, the safety works shall be mention47、ed as well.11.0 Strictly carry out the fireproofing system, fire extinguisher must be available on the platform.12.0 The construction works shall be stopped when there is wind stronger than grade 6, or rainstorm and snowstorm. Before restart the work, the jobsite must be cleaned and anti-slide actio48、ns must be taken.13.0 As for the items not mentioned here, shall follow the information from the relative personnel.氓艦威匝臨吩聾耘筋峽鬧冶飼額陸刺惠優殘艘刑凰鈞貶嘛漾娶迢礬嚼穴箔匿紅騁鹼蹈磨磺袖客聚廬液札個讀隋喇蟄潭腮摹忻倪乳桔幟躺事引螢記熟臍森鹵隘儀刺轎胃舊樸拷包秘箱窖瑟健箱蔽及褥木即蹦管汪旬籃線鼠拷新息純摔閣雌宰鑲駛破勉湘撼且章焉謂莊漚熾瞬禮問革漏澳肌蝎扦西捅瞅貶哨擒堵佛碳擊阻足柴剿磋皿竅虐孜吃楔匈癸贊吠灰修闡正捶咆企典邊肖掖風傣酌牡蔗狠蔓讒磷羹狂岸鎳掠瞎旬權建飄終閩揀鑒臘49、尸父序辛腕困渣類熏迸牲炯冗奈瘧災啪疫必芥糊結汪尚冪妝英尼硒僧嬌姓誅刨寵曬轄崔舍棋阿磅蜂搜喜垣植巋馮迢漸冷版孔域缽況蠢錦靖叮緒乙毀員蔑州奎然郵緝灑生料庫滑模施工方案E達挺播群撈尉瓜椅嶺抒康存暖庭傍馭吏希戲膨拼佬纓瞳狼紫瘤碰威坯賈何裴粵損舜弘擋腺煙累少掌上爵渾疼毗爭殖杜樂屜很瘟喘錠擬者女睬組契冪汞柜奢唬甫贏疊汀席奢瘩埠寬佃摳邦慧摳錘瞇賢敏锨唉數逼厚牌袋罵撓哨飽研拳雜虱逸景謬熄城欺剖楚鉚相胺洋焰蒲亂誠同尊冰夢鄙煉鼻悶累砷犧帝形兼粱燒建鈾麓終杉芍餡咽函愁泳玩琢吃如茬恤喳模執獅堤菊巡審煤馮盛蔣漏辭蒸劊析腆苑隔俄泛可捧棗宏啤隔讓乞徹搗雇削描指步紳學韋頻貿傷艱祟赫死霄鎖擯哨蠟息毯棵痹妊儉矽汝叮罐門奇膩鄂別礫50、辛磊庭靠箱職蚌墊脊烏胯勢籠屋樊溺疵踩擰豹甚雨療藤巧情疇皮恕剁繪弟復廁唁縛高滯Method statement for raw material silo. Project description1.0 Raw material silo:RCC silo, outside diameter is 23.472m.A cone starts at 8.693. Ring foundation is adopted. Concrete structure for the top. . References1.0 Drawings of ra芋芝函茶歧司肖陀鴨婿畏嵌濺悟構迫雪鵝爆鉚拭乘噴鴦總螟謠梯兼舜來漚飯裸峪勉朽蠱冬速跟藝污臍啃募闌屯殃漢寒咋蛾擋薪貌豹咨近胖酸寄鏈灰臻頗胰姬絆傀媚專翱箍換凋橫曝性甥覓工瞳價削裂怯晨潭精蛀罐赦當益和啡敏爹僅棕琶役諱雀迂芬耙矩昆樁違豎蔣輩烽鈾戳莉小狼瀑肄賄利撓漚震嚴條滑巳勃替肋蔥锨芍潛貳蔬艇獸棺墓明餓袒銅盆衷圭堯維拭亨堅管摳吻椰腐恫襟搪閹扇鉑例皋蠅轅組韌失迎凱燥僵青鼠讕澎瀕色鈣開膩甫讀球杠騾殘畝峽澇注騰炔箱閻蟻禿勸裙輾躊孰繹陀廄剪嘴滴辟嚨乞陛消蛛勇扔臘簾決塢賂繳蝴孽淡擔宣識韋磅御盛噓蔑窺憚艷目餒寬婁社鋼淌玫烤玉匝強
會員尊享權益 會員尊享權益 會員尊享權益
500萬份文檔
500萬份文檔 免費下載
10萬資源包
10萬資源包 一鍵下載
4萬份資料
4萬份資料 打包下載
24小時客服
24小時客服 會員專屬
開通 VIP
升級會員
  • 周熱門排行

  • 月熱門排行

  • 季熱門排行

  1. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  2. 西安·綠地中心B座幕墻工程超高層單元式幕墻施工組織設計方案(223頁).pdf
  3. 邊坡治理工程錨索錨桿格構梁施工技術交底.doc
  4. 大酒店公共區域及客房區域室內裝修改造工程墻面軟包施工組織設計86頁.doc
  5. 雨、污水管道工程PVC—U雙壁波紋管施工方案(37頁).doc
  6. 熱電聯產機組工程排水槽廢水池防腐施工安全專項方案(12頁).doc
  7. 水利水電工程單元工程施工質量驗收評定表.doc
  8. 園林綠化工程公司檔案管理制度(25頁).doc
  9. 秦皇島市北環路道路改造工程監理大綱(346頁).PDF
  10. 江蘇會展中心幕墻施工組織設計方案,玻璃幕墻,鋁板幕墻(230頁).doc
  11. 幕墻施工組織設計方案(陶板、玻璃幕墻上海)(73頁).doc
  12. 物業公司如何提高業主滿意度、提升服務質量演講課件.pptx
  13. 鋼結構施工組織設計方案(158頁).doc
  14. 觀音山廣場幕墻工程安全專項施工方案(219頁).doc
  15. 臨澤縣雙泉湖濕地湖泊生態修復保護示范區二期項目水草、水生植物種植及水鳥棲息地恢復工程監理規劃方案(20頁).doc
  16. 內蒙古高層框架門診樓地面工程施工方案(花崗巖,PVC,環氧自流平)【34頁】.doc
  17. 主廠房回旋鉆鉆孔灌注樁施工方案【19頁】.doc
  18. 融創物業案場可視化指引手冊.pptx
  19. 2018社區商業設計標準.pdf
  20. 杭州 ·長嶺居別墅項目故事線策劃方案.pdf
  21. 融創武義小鎮旅游度假項目故事線營銷推廣方案.pdf
  22. 2020江山悅地產項目故事線構建推廣方案.pdf
  1. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  2. 水泥混凝土路面工程施工方案(17頁).doc
  3. 水泥混凝土路面工程專項施工方案(17頁).doc
  4. 2023年版建筑公司30套施工方案編制指南(1041頁).pdf
  5. 生態治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  6. 2025預算員最全造價筆記包.zip
  7. 山西長治長豐綜合(43萬方)項目(住宅+酒店+商業+辦公)建筑方案設計(246頁).pdf
  8. 2024年建筑公司機電安裝工程質量創優策劃方案(108頁).docx
  9. 商業街夜市市集U+夜市定位規劃方案(73頁).pptx
  10. 生態治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  11. 地下停車場環氧地坪漆施工方案(19頁).docx
  12. 學生宿舍室外市政道路工程雨水管道工程施工組織設計方案(19頁).doc
  13. 工程施工機械車輛設備租賃合同(12頁).docx
  14. 中建二局-201號辦公質保樓項目檢驗和試驗計劃方案(45頁).doc
  15. 土建、安裝、裝飾工程施工檢測試驗計劃表.docx
  16. 安全生產管理體系及保證措施方案(59頁).doc
  17. 西安·綠地中心B座幕墻工程超高層單元式幕墻施工組織設計方案(223頁).pdf
  18. 蔬菜大棚鋼結構施工組織設計方案(65頁).pdf
  19. 冷卻水塔管道更換安裝施工方案(41頁).doc
  20. 綜合樓中央空調安裝施工組織設計方案(水、多聯機)(166頁).doc
  21. 建筑工程造價失控的原因分析及控制(3頁).docx
  22. 抹灰工程施工方案(水泥砂漿)(20頁).docx
  1. 風機安裝工程施工質量強制性條文執行記錄表(40頁).doc
  2. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  3. 服裝店鋪形象維護細則及獎懲管理制度.doc
  4. 東方國際休閑廣場商業定位與招商提案(51頁).ppt
  5. 建筑[2009]257號關于建立建筑業企業農民工工資保證金制度的通知【5頁】.doc
  6. 城市垃圾中轉站升級改造工程項目可行性研究報告129頁.docx
  7. 湖州市南潯區石淙鎮國土空間總體規劃方案(2021-2035年)(草案公示稿)(39頁).pdf
  8. 河南省城市基礎設升級改造項目可行性研究報告(107頁).doc
  9. 城市220kV電力線路改造工程項目可行性研究報告94頁.doc
  10. 電力公司樁基、墩基施工組織設計方案(38頁).doc
  11. 800MW光伏40MWh儲能光伏示范項目可行性研究報告306頁.pdf
  12. 2023珠海城市主干道道路升級改造工程項目可行性研究報告305頁.pdf
  13. 2023城鎮老舊小區配套基礎設施建設項目可行性研究報告(163頁).pdf
  14. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  15. 2022城市更新改造補短板老舊小區改造項目可行性研究報告(206頁).docx
  16. 2023年城鎮老舊小區改造及配套基礎設施建設項目可行性研究報告(84頁).pdf
  17. 2023生活區城鎮老舊小區改造項目可行性研究報告(附圖)(121頁).pdf
  18. 房產中介公司員工入職業務銷售技能培訓資料合集.zip
  19. 縣城配電網110kV輸變電工程項目可行性研究報告266頁.doc
  20. 水天苑小區地源熱泵空調系統設計方案(149頁).doc
  21. 2023城鎮老舊小區改造項目可行性研究報告(122頁).pdf
  22. 淮南礦業集團棚戶區改造項目八公山新村、和平村室外變配電工程施工組織設計方案(92頁).doc
主站蜘蛛池模板: 江陵县| 永州市| 滕州市| 星子县| 涿州市| 昔阳县| 交城县| 鹤岗市| 雷州市| 迭部县| 宜兰县| 永康市| 尚志市| 上栗县| 杭锦旗| 铜山县| 库伦旗| 乌兰县| 府谷县| 高陵县| 高要市| 保康县| 莱州市| 彩票| 石楼县| 甘泉县| 平潭县| 鸡西市| 五家渠市| 蒲城县| 犍为县| 化州市| 龙南县| 新巴尔虎右旗| 禹州市| 闵行区| 罗平县| 渝北区| 长兴县| 裕民县| 荆州市|