午啪啪夜福利无码亚洲,亚洲欧美suv精品,欧洲尺码日本尺码专线美国,老狼影院成年女人大片

個人中心
個人中心
添加客服微信
客服
添加客服微信
添加客服微信
關注微信公眾號
公眾號
關注微信公眾號
關注微信公眾號
升級會員
升級會員
返回頂部
煤礦豎井井筒裝備制定施工方案須注意的問題(7頁)
煤礦豎井井筒裝備制定施工方案須注意的問題(7頁).doc
下載文檔 下載文檔
其它文檔
上傳人:正*** 編號:484685 2022-07-25 8頁 42.05KB

下載文檔到電腦,查找使用更方便

10 金幣

  

還剩頁未讀,繼續閱讀

1、煤礦豎井井筒裝備制定施工方案須注意的問題Abstract: Based on a brief analysis of the coal mine shaft equipment installation, according to the particularity of shaft equipment installation engineering, puts forward shaft equipment installation engineering construetion plan formulation, demonstration process, has guiding s2、ignificance for similar eng in eering construction of large shaft equipment Key words: coal mine shaft, shaft equipment installation, construction scheme, problemsAbstract:This paper has a brief analysis on the shaft equipment estaclishment construction shceme of coal mine vertical shafe, and accord3、ing tothe particularity of the shaft equipment construetion project It provides the establishment of the shaft equipment construction project, demon-strating the attentive problems during the construction project This can guide the similar construction on large project of shaft equipment.Key, words:4、 coal, mine, vertical, shaft, shaft, equipment, establishment, constructin, scheme, problemCoal mine shaft equipment installation project is a safety management, risk pressure, construction technology comprehensive strong unit project Shaft equipment construction scheme is the key technology of shaf5、t equipment installation engineering, technology is important in the construction of shaft equipment should be completed before the start of the preparatory work, is to en sure the basic tech no logy to eliminate high-risk deep complex working environment has all kinds of security risks, to ensure t6、he construction safety, construction quality, construction schedule control, improve the normal work the construction efficiency, reduce the cost of construction is of great significance. Therefore, we should pay attention to the following problems in the construction and implementation of the const7、ruction plan1 construction plan demonstration principleShaft equipment is an important component of shaft hoisting system in coal mine As an upgrade system, it also includes large steel structure derrick, large fixed hoist equipment, and wellhead, bottom hole and other ancillary equipment Shaft equi8、pment implementation in the construction organization, construction installation is not actually as a separate unit of the project, but the comprehensive construction units, such as mine construction investment and may need ladderway; shaft drainage, air pressure, sprinkler, grouting, cooling, gas d9、rainage and ot her in dustrial pipelines; in high voltage power cable, low voltage, shaft communication, signal, control and monitoring of cable installation engineering units, with large amount of engineering and construction technology is complex, multi process parallel operation, high density, co10、nstruction environment, wellbore safety protection, the quality control of difficult jobs A number of engineering units with the shaft equipment synchronous pipelining construction, this is the requirements of the construction unit of the mine total construction period, can reflect the ability of co11、nstruction organization construction team and a comprehensive technical level can meet, meet the needs of social economic development, but also the construction unit by optimizing the overall construction plan, the basic requirements, effectively accelerate the construction progress to reduce the co12、nstruction cost, improve economic efficiency Therefore, to develop a good construction plan, should consider the comprehensive analysis of all relevant factors on the shaft equipment installation engineering, making construction plan should follow the following principles: 1) to consider the commonn13、ess and characteristics of the project and similar projects, forming a preliminary feasibility scheme, project planning, technology (with a comprehensive review of design drawings) 2) we should consider the site natural environment conditions (site investigation, construction conditions, operating e14、nvironment) 3) should consider to meet the requirements of the contract period (in the key work line to take technical measures, reasonable shorten construction period) 4) to consider the feasibility and continuity of simultaneous construction technology (quality assurance, effective joint construct15、ion of process nodes) 5) we should consider the ability of construction organization and the level of construction technology and equipment 6) we should analyze and identify major or critical safety risk sources in the operating environment and take effective safety precautions,The safety risk facto16、rs and control requirements of each link of the construction should be considered comprehensively. 7) determine the construction plan to carry out technical and economic evaluation2 construction plan to prove the original data required to complete a construction plan, but also seriously collect, col17、late, verify the following relevant sources: 1) design and construction drawings. 2) construction, location and measurement data of the well head, bottom hole and shaft 3) relevant meeting minutes and minutes from the project construction drawings 4) related technical documents and engineering quali18、ty specifications and standards 5) safety regulations, procedures, regulations, and documents relating to safety management 6) condition of well bore equipment Such as the retaining facilities in the shaft, the thickness and strength of the shaft lining concrete; the shaft passes the quicksand layer19、, the elevation of the coal seam, position, etc7) wellbore ventilation and safety management requirements 8) water gushing, water gushing and measuring data 9) inspection record of well bore equipment The main defects are the verticality, concentricity and hole of the shaft, which will affect the lo20、cation of the installation of the shaft equipment.10) the layout of the existing buildings and facilities on the wellhead site 11) own, can adjust the leased equipment, test and test instrument list 12) the supply of materials involved in the design drawings3 the main points of construction scheme d21、emonstrationAccording to the principle of scheme demonstration and the original data collected, a construction plan of shaft equipment should be worked out At the same time, the following problems should be considered comprehensively. These technical problems are the main contents of the constructio22、n plan.1) what kind of lifting container and lifting method are adopted to solve the problem of hoisting and well entry for construction personnel, and the requirements for project safety and protection are raised clearly, and the safety of construction personnel is guaranteed.2) the construction pe23、rsonnel construction in the wellbore required work platform (that is usually referred to themultilayer hanging plate, hereinafter referred to as the hanging plate), hanging plate design structure and structural strength and construction personnel safety protection, hanging plate can meet the constru24、ction schedule control and each class should complete the project requirements, whether meet the process of synchronous construction, guarantee the next step and the next crew may require continuous construction3) how to realize the quick conversion of the working procedure of the standard and non s25、tandard sections and the effective overlap of the process conversion4) what are the materials and components needed for the construction of the shaft equipment? The method is used to raise, transport, and construct the hoisting disk position in the shaft so as to ensure the construction schedule of 26、the operation team 5) before the installation of steel wall of the base is how to achieve the fast measurement of borehole position number to determine the position of anchor hole, how to quickly find it installed steel wall seat, beam seat, pipe beam, pipeline and other components, and the amount o27、f time needed to determine the precise place6) how to solve the welding operation methods of the shaft, the industrial pipeline, the well entrance, the hoisting and the bore pipe interface, and solve the power supply safety problem of the power supply in the well bore welding operation7) to ensure t28、he shaft equipment installation construction quality inspection and control, construction safety control and protection work should focus on solving several key technical problems: A. installed measuring steel wire and installation process quality inspection method, quality should meet the requireme29、nts of norms and standards, and to facilitate the construction personnel operation Structure design and strength check of B. hoisting plate in shaft Technical requirements for hoisting of hoisting disk in C. shaft D how can the lifting container be temporarily raised in the wellbore to meet the mand30、atory requirements of the relevant safety regulations? How does E arrange temporary lifting signals and visual surveillance systems? F. wellhead temporary safety closed wheel arrangement, we should consider the lifting container, lifting material in the wellbore, the wellbore at the same time to ens31、ure the safety of construction workers, to meet the requirements of ventilation safety management; making use of steel structure and flame retardant materials, comply with fire safety regulations Type selection calculation and safety strength check of G. temporary lifting equipment and suspension. H32、 in accordance with the requirements of safety management of shaft ventilation, such as water gushing from well bore and gushing water, passing through quicksand section or over coal seam section, relevant special safety technical measures must be formulated. I. construction site of theconstruction 33、process, involving environmental protection, occupational health special measures8) compile the construction schedule, control plan, time scale, network diagram9) draw up the distribution chart of each worker during each operation.A complete construction plan of shaft equipment mainly includes the f34、ollowing aspects: 1) general situation of the project 2) construction plan. 3) construction labor organization and post technical work arrangement 4) calculation of large lifting equipment selection. 5) construction equipment and equipment list.6) construction schedule, time scale, network diagram 735、) drawings: large lifting equipment and materials, wellhead layout plan Layout of steel wire for shaft survey. Hanging plate processing and installation structure drawing Derrick sheave wheel platform layout Layout of shaft section lifting facilities Wellhead safety closure layout Sectional drawing 36、of well equipment Layout design of shaft section (original design and construction drawing) Layout plan of bottom nonstandard layer (original design and construction drawing) Compile time scale network diagram of construction progress control plan. Draw up the distribution chart of each operator dur37、ing each shift Draw up temporary power supply system diagram for construction site4 ConclusionShaft construction scheme is a technical document of comprehensive process technology, safety control, schedule control and cost contro1. In the development of the construction program, to boldly carry out 38、technological innovation, to improve the traditional technology, active learning, digestion and absorption, promote application of new technology, in order to improve work efficiency, promote the rapid construction, shorten construction period and reduce the security risk management pressure; at the39、 same time must go through multiple schemes optimization, in order to reflect the the advanced technology and construction efficiency, the construction organization design documents can guide the construction of normal construction technology can be implemented smoothly, to achieve continuous operat40、ion, construction personnel clear objectives, application of guarantee construction quality and construction safety control, comprehensive quality and efficient completion of construction tasks.This paper is based on years of production experience and lessons, systematically introduces the principle41、 and the construction scheme and proved some problems, it has guidance significanee for the construction of large project of shaft equipment; in the development should pay attention to and solve the main problems and put forward the scheme demonstration of shaft equipment in construction points for Tongren reference in practical workReferenee: 1 Yan Junhui, 000 over, Lili soup 1000 meter Shafi Mechanized construction technology discussion J Shanxi architecture, 2009, 35 (8): 174-175.
會員尊享權益 會員尊享權益 會員尊享權益
500萬份文檔
500萬份文檔 免費下載
10萬資源包
10萬資源包 一鍵下載
4萬份資料
4萬份資料 打包下載
24小時客服
24小時客服 會員專屬
開通 VIP
升級會員
  • 周熱門排行

  • 月熱門排行

  • 季熱門排行

  1. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  2. 山西長治長豐綜合(43萬方)項目(住宅+酒店+商業+辦公)建筑方案設計(246頁).pdf
  3. 2025預算員最全造價筆記包.zip
  4. 貴陽南明區地塊項目(住宅、商業+辦公+學校)建筑方案設計(311頁).pdf
  5. 西安金輝世界城J地塊綜合體項目建筑設計方案(318頁).pdf
  6. 西安·綠地中心B座幕墻工程超高層單元式幕墻施工組織設計方案(223頁).pdf
  7. 蔬菜大棚鋼結構施工組織設計方案(65頁).pdf
  8. 全輕混凝土地坪施工方案.doc
  9. 邊坡治理工程錨索錨桿格構梁施工技術交底.doc
  10. 陳列布展廳建設工程電氣安裝展廳電子及裝飾裝修安全施工方案46頁.doc
  11. 大酒店公共區域及客房區域室內裝修改造工程墻面軟包施工組織設計86頁.doc
  12. 蔬菜大棚土建、鋼結構工程施工組織設計方案(66頁).doc
  13. 雨、污水管道工程PVC—U雙壁波紋管施工方案(37頁).doc
  14. 熱電聯產機組工程排水槽廢水池防腐施工安全專項方案(12頁).doc
  15. 水利水電工程單元工程施工質量驗收評定表.doc
  16. 秦皇島市北環路道路改造工程監理大綱(346頁).PDF
  17. 江蘇會展中心幕墻施工組織設計方案,玻璃幕墻,鋁板幕墻(230頁).doc
  18. 幼兒園建設工程項目可行性研究報告(486頁).doc
  19. 幕墻施工組織設計方案(陶板、玻璃幕墻上海)(73頁).doc
  20. 物業公司如何提高業主滿意度、提升服務質量演講課件.pptx
  21. 2020江山悅地產項目故事線構建推廣方案.pdf
  22. 建筑大理石、花崗石干掛施工工藝(5頁).doc
  1. 服裝店鋪形象維護細則及獎懲管理制度.doc
  2. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  3. 水泥混凝土路面工程施工方案(17頁).doc
  4. 水泥混凝土路面工程專項施工方案(17頁).doc
  5. 2023年版建筑公司30套施工方案編制指南(1041頁).pdf
  6. 生態治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  7. 山西長治長豐綜合(43萬方)項目(住宅+酒店+商業+辦公)建筑方案設計(246頁).pdf
  8. 2024年建筑公司機電安裝工程質量創優策劃方案(108頁).docx
  9. 商業街夜市市集U+夜市定位規劃方案(73頁).pptx
  10. 生態治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  11. 地下停車場環氧地坪漆施工方案(19頁).docx
  12. 學生宿舍室外市政道路工程雨水管道工程施工組織設計方案(19頁).doc
  13. 工程施工機械車輛設備租賃合同(12頁).docx
  14. 中建二局-201號辦公質保樓項目檢驗和試驗計劃方案(45頁).doc
  15. 土建、安裝、裝飾工程施工檢測試驗計劃表.docx
  16. 安全生產管理體系及保證措施方案(59頁).doc
  17. 西安·綠地中心B座幕墻工程超高層單元式幕墻施工組織設計方案(223頁).pdf
  18. 蔬菜大棚鋼結構施工組織設計方案(65頁).pdf
  19. 冷卻水塔管道更換安裝施工方案(41頁).doc
  20. 綜合樓中央空調安裝施工組織設計方案(水、多聯機)(166頁).doc
  21. 建筑工程造價失控的原因分析及控制(3頁).docx
  22. 抹灰工程施工方案(水泥砂漿)(20頁).docx
  1. 風機安裝工程施工質量強制性條文執行記錄表(40頁).doc
  2. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  3. 服裝店鋪形象維護細則及獎懲管理制度.doc
  4. 東方國際休閑廣場商業定位與招商提案(51頁).ppt
  5. 建筑[2009]257號關于建立建筑業企業農民工工資保證金制度的通知【5頁】.doc
  6. 城市垃圾中轉站升級改造工程項目可行性研究報告129頁.docx
  7. 湖州市南潯區石淙鎮國土空間總體規劃方案(2021-2035年)(草案公示稿)(39頁).pdf
  8. 河南省城市基礎設升級改造項目可行性研究報告(107頁).doc
  9. 城市220kV電力線路改造工程項目可行性研究報告94頁.doc
  10. 電力公司樁基、墩基施工組織設計方案(38頁).doc
  11. 800MW光伏40MWh儲能光伏示范項目可行性研究報告306頁.pdf
  12. 2023珠海城市主干道道路升級改造工程項目可行性研究報告305頁.pdf
  13. 2023城鎮老舊小區配套基礎設施建設項目可行性研究報告(163頁).pdf
  14. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  15. 2022城市更新改造補短板老舊小區改造項目可行性研究報告(206頁).docx
  16. 2023年城鎮老舊小區改造及配套基礎設施建設項目可行性研究報告(84頁).pdf
  17. 2023生活區城鎮老舊小區改造項目可行性研究報告(附圖)(121頁).pdf
  18. 房產中介公司員工入職業務銷售技能培訓資料合集.zip
  19. 縣城配電網110kV輸變電工程項目可行性研究報告266頁.doc
  20. 水天苑小區地源熱泵空調系統設計方案(149頁).doc
  21. 2023城鎮老舊小區改造項目可行性研究報告(122頁).pdf
  22. 淮南礦業集團棚戶區改造項目八公山新村、和平村室外變配電工程施工組織設計方案(92頁).doc
主站蜘蛛池模板: 班玛县| 白城市| 三原县| 金沙县| 图片| 徐州市| 阿荣旗| 太白县| 鹤壁市| 榕江县| 宁化县| 丽江市| 抚远县| 金堂县| 湖北省| 八宿县| 铜陵市| 华池县| 交城县| 桂阳县| 榆林市| 长丰县| 马尔康县| 隆尧县| 钟祥市| 青神县| 互助| 佳木斯市| 化州市| 嵩明县| 龙山县| 广安市| 沾化县| 鹿邑县| 湘潭县| 江津市| 姚安县| 东城区| 阜平县| 秦皇岛市| 大连市|