1、Works Programme for Gravel Cement Stabilization Base ProgrammeL Main construction methodThe base for the section of OGINGA ODINGA Road (KURA Project) shall be 150mm cement treated natural gravel material layer with cement content 2.5%. The natural gravel material shall be hauled to the field with 152、T tippers, spread by the graders, blended by the pulmixer and compacted by the rollers.IL Construction of trial sectionThe 100m full-width trial section is scheduled to construct between km0+800 - km0+900 in advance before the overall commencement of base laye匸1. The purpose of construction for tria3、l sectionThe purpose of trial section is to verify the following aspects:a) the proposed construction program and method are feasible or not;b) the deployment and matching of construction equipment and personnel are reasonable or not;c) the relationship between the rolling passes of roller, rolling 4、methods and compaction density;d) to confirm the loose coefficient and loose depth of material spreading;e) to verify the range of tolerance between construction mix proportion and designed mix proportionThe trial section shall provide construction guidance and data for the overall constructio n.2. 5、The data required to be collected during construction of trial sectionThe trial section must be undertaken under the direction of Engineer. The following details should be recorded: the types of equipment and equipment quantity; mixing time for stabilization layer; rolling passes and method for roll6、er loose paving thickness, level and moisture content of mixture before compacted; actual thickness, level, moisture content and density of mixture after compacted;3. Testing items for the trial roadThe natural gravel material and cement shall be tested as per the Technical Specification before the 7、commencement of trial road. The mixture and structural layer shall be carried out tests in laboratory as per the requirements of Technical Specification during the construction process and after construction finished. Only if the above tests data reach the requirements, the trial road can be approve8、d. After getting the approval from the Engineer, the testing data will be the basis for our overall construction, and the trial section can be one part of the road, otherwise the Contractor shall find out the reasons and undertake the construction againIIL Preparation Works before Construction1. Con9、struction setting-outa) Centrelines, the edge of shoulder and the edge of carriageway (total 5 points) of top level of base layer shall be calculated as per the interval of 20m, and then submitting the information to Engineer for approval.b) The centre and side lines shall be set out on site as per 10、the interval of 20m, and the permanent wood controlling pegs (5x5cm) shall also be erected 50cm outside of the side pegs. The levels for the stabilization layer shall be controlled with string method.2. TestingThe gravel material and cement shall be tested completely before the commencement of trial11、 road. The mix proportion (natural gravel material with cement) shall also be approved by the Enginee匚 The testing data, such as optimum moisture content, the maximum dry density and cement mixing proportion etc. shall be confirmedIV. Construction methoda) The natural gravel material shall be hauled12、 to the field with 15T tippers, and the required quantity for every chainage shall be dumped by the levelers calculation strictly.b) The dumped gravel material shall be spread and dry-mixed once by the grader to enable the labors to select and throw the big coarse size rocks (size over 5cm) out. Aft13、er leveling, the material shall be slightly compacted by the roller and checked by the leveler to calculate if the gravel material satisfies the quantity for the stabilization laye匚c) After confirmation for the gravel material, the lime shall be used to mark every one square meter to guide the site 14、personnel to spread the cement uniformly on the surface of the natural gravel material.d) Pulmixer shall be used to dry-mix the gravel material and cement initially to ensure the two kinds of material are uniformly blended.e) The water tankers shall be used to spray enough water to the surface of th15、e mixed material, following, the pul mixer shall be used to blend the mixture.f) After properly mixing, the roller shall be used to undertake the initial compaction, and the levels shall be cut with the string method.g) After finishing cutting levels, the mixture shall be compacted two passes with r16、oller. Levels shall also be confirmed by the leveler as soon as possible, if any chainages levels need to be corrected slightly, the grader shall be mobilized to shape the surface to the design levels. On the completion of the levels, the steel roller plus tyred-roller shall be used to finish the co17、mpaction for the stabilization layer.IV Curing1) Within 4 hours after compaction, the water shall be slightly sprinkled to keep the base surface damp, and then the minimum thickness of 0mm polythene film shall be used for covering. Such films shall overlapped 50cm at the joints. The clean gravel mat18、erial shall be piled on the joints and the edge of polythene film to keep the covering in place.2) Minimum curing period is 7 days. During the curing period, the workers shall be sent to patrol and prevent children or livestocks damaging the base layer. If any damage happens, repairing activities sh19、all be undertaken immediately. The compacted base shall be kept damp and the traffic shall be controlled The vehicles shall be forbidden to pass.3) After seven days of curing, the prime coat shall be spread as early as possible. The AC course construction should be undertaken as soon as possible aft20、er the curing period of prime coat and the heavy vehicle shall be forbidden to pass through.IV Construction staff, machinery and equipment1. Staff: 12 unskilled workers, 1 foreman, 2 levelers, 8 operators2. Equipment: 1 shovels, 1 pulmixer, 3 water truck, 8 tippers, 1 grader, 1 steel roller and one tyred roller.
會員尊享權益 會員尊享權益 會員尊享權益
500萬份文檔
500萬份文檔 免費下載
10萬資源包
10萬資源包 一鍵下載
4萬份資料
4萬份資料 打包下載
24小時客服
24小時客服 會員專屬
開通 VIP
升級會員
  • 周熱門排行

  • 月熱門排行

  • 季熱門排行

  1. 田螺山河姆渡文化遺址生活館室內設計方案(247頁).pdf
  2. 建筑鋼筋平法培訓課件.ppt
  3. 2023東城街城鄉(xiāng)結合示范帶建設項目可行性研究報告(248頁).pdf
  4. 工業(yè)廠房及附屬設施綜合樓輪扣式高支模腳手架專項施工方案(60頁).docx
  5. 再生水廠配套管網工程項目有限空間作業(yè)事故應急救援預案.doc
  6. 天然氣管道保護工程專項施工方案(36頁).docx
  7. 智慧城市項目可行性研究報告(257頁).doc
  8. 市區(qū)中心醫(yī)院信息化改造項目可行性分析研究報告(461頁).docx
  9. 華為公司干部任職資格管理制度.doc
  10. 沁源綠化園林工程公司ISO質量手冊和程序文件匯編65頁.doc
  11. 科學技術新館鋼結構工程桁架制作及桁架預拼裝施工方案44頁.doc
  12. 2023城市水廠工藝升級改造工程可行性研究報告108頁.pdf
  13. 嘉善縣陶莊鎮(zhèn)國土空間總體規(guī)劃方案(2021-2035年)(草案公示)(58頁).pdf
  14. 五星級酒店室內裝修改造工程施工組織設計方案(187頁).doc
  15. 雙遼電廠一期配電室基礎及上部結構施工方案(24頁).doc
  16. 排水溝清淤施工方案(25頁).pdf
  17. 新鮮水、消防水儲水池土建工程鋼筋混凝土蓄水池施工方案(82頁).doc
  18. 初級中學校運動場建設工程施工組織設計方案(171頁).doc
  19. 盱眙垃圾焚燒發(fā)電廠鋼結構工程500T吊車鋼結構吊裝專項施工方案(40頁).doc
  20. 辦公樓無線網絡WiFi方案【28頁】.doc
  21. 住宅樓施工組織設計書(137頁).doc
  22. 裝修裝飾公司建筑裝修合同范本(3頁).doc
  1. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  2. 田螺山河姆渡文化遺址生活館室內設計方案(247頁).pdf
  3. 建筑工程公司資料員取證培訓課件(307頁).ppt
  4. 水泥混凝土路面工程施工方案(17頁).doc
  5. 水泥混凝土路面工程專項施工方案(17頁).doc
  6. 建筑公司安全物資供應單位及個人防護用品管理制度.doc
  7. 生態(tài)治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  8. 建筑鋼筋平法培訓課件.ppt
  9. 2025預算員最全造價筆記包.zip
  10. 山西長治長豐綜合(43萬方)項目(住宅+酒店+商業(yè)+辦公)建筑方案設計(246頁).pdf
  11. 施工企業(yè)安全技術交底范本大全(361頁).pdf
  12. 2024年建筑公司機電安裝工程質量創(chuàng)優(yōu)策劃方案(108頁).docx
  13. 2023東城街城鄉(xiāng)結合示范帶建設項目可行性研究報告(248頁).pdf
  14. 生態(tài)治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  15. 工業(yè)廠房及附屬設施綜合樓輪扣式高支模腳手架專項施工方案(60頁).docx
  16. 2021房地產公司創(chuàng)新建筑立面設計研發(fā)手冊(50頁).pdf
  17. 學生宿舍室外市政道路工程雨水管道工程施工組織設計方案(19頁).doc
  18. 住宅新中式和法式立面標準化設計產品研發(fā)手冊(含出入口標準化)(273頁).pdf
  19. 智慧城市項目可行性研究報告(257頁).doc
  20. 土建、裝飾、維修改造等零星工程施工組織設計方案(187頁).doc
  21. 杭州 ·長嶺居別墅項目故事線策劃方案.pdf
  22. 住宅樓施工組織設計書(137頁).doc
  1. 風機安裝工程施工質量強制性條文執(zhí)行記錄表(40頁).doc
  2. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  3. 服裝店鋪形象維護細則及獎懲管理制度.doc
  4. 東方國際休閑廣場商業(yè)定位與招商提案(51頁).ppt
  5. 建筑[2009]257號關于建立建筑業(yè)企業(yè)農民工工資保證金制度的通知【5頁】.doc
  6. 城市垃圾中轉站升級改造工程項目可行性研究報告129頁.docx
  7. 湖州市南潯區(qū)石淙鎮(zhèn)國土空間總體規(guī)劃方案(2021-2035年)(草案公示稿)(39頁).pdf
  8. 河南省城市基礎設升級改造項目可行性研究報告(107頁).doc
  9. 城市220kV電力線路改造工程項目可行性研究報告94頁.doc
  10. 800MW光伏40MWh儲能光伏示范項目可行性研究報告306頁.pdf
  11. 2023珠海城市主干道道路升級改造工程項目可行性研究報告305頁.pdf
  12. 2023城鎮(zhèn)老舊小區(qū)配套基礎設施建設項目可行性研究報告(163頁).pdf
  13. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  14. 2022城市更新改造補短板老舊小區(qū)改造項目可行性研究報告(206頁).docx
  15. 2023年城鎮(zhèn)老舊小區(qū)改造及配套基礎設施建設項目可行性研究報告(84頁).pdf
  16. 2023生活區(qū)城鎮(zhèn)老舊小區(qū)改造項目可行性研究報告(附圖)(121頁).pdf
  17. 縣城配電網110kV輸變電工程項目可行性研究報告266頁.doc
  18. 水天苑小區(qū)地源熱泵空調系統(tǒng)設計方案(149頁).doc
  19. 2023城鎮(zhèn)老舊小區(qū)改造項目可行性研究報告(122頁).pdf
  20. 田螺山河姆渡文化遺址生活館室內設計方案(247頁).pdf
  21. 淮南礦業(yè)集團棚戶區(qū)改造項目八公山新村、和平村室外變配電工程施工組織設計方案(92頁).doc
  22. 建筑工程公司資料員取證培訓課件(307頁).ppt
主站蜘蛛池模板: 南乐县| 齐齐哈尔市| 通渭县| 铜山县| 怀集县| 大宁县| 调兵山市| 齐齐哈尔市| 延寿县| 五台县| 苏州市| 扬中市| 潮州市| 兴安县| 平乐县| 民勤县| 台北市| 定州市| 航空| 吴桥县| 苗栗县| 林周县| 体育| 黔南| 黔西| 弥勒县| 蓝山县| 隆昌县| 友谊县| 托克托县| 巩留县| 安龙县| 林州市| 阿荣旗| 丹巴县| 宿松县| 库尔勒市| 宜君县| 福建省| 沙湾县| 石门县|