1、 Method Statement for Pipe Jacking1. Construction of PitsThe jacking pit with a dimension of 6mx5 clear opening with depth of 250mm below invert level of the steel pipe.The floor will be leveled by 100mm thick concrete blinding fixing tow I beams(1.5mx15cm) in the center of the pit for fixing jackin2、g frame.2. Installation of Jacking FrameAfter the construction of drive, the jacking rig will be lowered into the pit and adjust to the control line and level. The rig will be used on this contract consist of two number of hydraulic cylinders with a capacity of 150 ton each to give a total jacking f3、orce of 300 tons. The rig will have guided rails, pushing plate and base plate to hydraulic power back with control unit. The hydraulic system will run through a diesel engine installed the top of the pit.The rig will installed to the correct line and level and check by the consultant in respect to 4、level and alignment.3. Thrust WallConstructing a concrete block behind the base plate of the rig to a dimension of 2x1.5x0.5m will be provided to take and distribute the jacking load.4. Pipe Jacking OperationA steel shield is used at the front of the pipe to accommodate the miner and to allow for st5、eering of the pipe jack. The soil within the shield is manually excavated and loaded into a wheel skip for transport to the pit bottom. The miner does not dig outside the shield (both in front and radically) and the front, or cutting edge, of the shield is always kept buried in the face, so stabilit6、y is maintained. The shield is thus used to trim the excavation to the size of the pipe thus minimizing the potential for settlement of the ground above the pipe jack.In the pit bottom, the skip is hoisted to the surface, emptied and returned to the used to loosen it prior to digging. The exact diam7、eter of shield will be selected to suit the pushing pipes.As excavation continues, the shield is jacking forward using two hydraulic jacks thrusting from the back wall. When the shield is buried, the jacks are retracted and the first sleeve pipe lowered on to the rails. This in then pushed up to the8、 shield and excavation can then continue.When the sleeve pipe is pushed home, the hydraulic jacks are retracted and the services (lighting& ventilation) disconnected. The next sleeve pipe is lowered on to the rails and the services reconnected and the cycle repeated until the shield is pushed into t9、he receiving pit and the pipeline pushed into final position.5. Maintaining Line and LevelIn order to maintain the correct line and level, a graduated target plate is located within the shield. The site engineer notes the position of the visible sport on the target, this initial position is used as 10、reference value to locate the relative position of the shield at all times during the drive. At each push, the site engineer monitors the position reference value with the help of level instrument and theodalite, thus giving a shield position (high or low, right or left) relative to the design posit11、ion. Based on this information, the operator manipulates a correct course.Extending or retracting a combination of steering rams causing the front of the shield to articulate in the required direction carries out the steering. As the pipe follows the shield, the correct line and level will be mainta12、ined. At all times, the amount steering applied is kept to minimum.6. Fixing Carrier PipesAfter completion of the pipe jacking , we check the line and level for the steel pipe and we take the exact line and level for the carrier pipe with the help of survey instruments.A 3 steel angle bar fixed by w13、elding in the correct bottom level of the carrier pipe, then 3mm thick flat bar half moon claps will fixed through wielding in the correct line after that we put neoprene rubber 3mm thick in the clamp to avoid the scratches of the carrier pipes.Then we start laying the carrier pipe one by one and fi14、x the clamps through nuts and bolts. After fixing the nuts and bolts we make angle support in between the top of the clamp and top of the pipe. Then we fix the other pipe in the same manner. The same procedure will continues up to the requirement.7. GroutingUpon completion of pipe jacking we make 4 15、2 holes like ventilation in every meter, it helps the concrete fill the gap between the steel pipe and ground. Then we fixed six inch grouting pipe vertically one meter height in the top of the pipe both end jacking and receiving. One side will keep ventilation and the other side for connection and 16、the concrete pump.After that we lay the carrier pipe in the correct line and level then check with the consultant and make the test required from the consultant then we close the both end between steel and carrier pipe by m/s plate welding or masonry, the gap between steel sleeve and ground in the both end we close by cement.During grouting the grout will push through the down string end.Pumping process will continue till the grout reaches the up string end ventilation pipe. When the grout will overflow from the ventilation pipe, grouting process is completed.
會員尊享權益 會員尊享權益 會員尊享權益
500萬份文檔
500萬份文檔 免費下載
10萬資源包
10萬資源包 一鍵下載
4萬份資料
4萬份資料 打包下載
24小時客服
24小時客服 會員專屬
開通 VIP
升級會員
  • 周熱門排行

  • 月熱門排行

  • 季熱門排行

  1. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  2. 山西長治長豐綜合(43萬方)項目(住宅+酒店+商業+辦公)建筑方案設計(246頁).pdf
  3. 2025預算員最全造價筆記包.zip
  4. 貴陽南明區地塊項目(住宅、商業+辦公+學校)建筑方案設計(311頁).pdf
  5. 西安金輝世界城J地塊綜合體項目建筑設計方案(318頁).pdf
  6. 蔬菜大棚鋼結構施工組織設計方案(65頁).pdf
  7. 全輕混凝土地坪施工方案.doc
  8. 邊坡治理工程錨索錨桿格構梁施工技術交底.doc
  9. 陳列布展廳建設工程電氣安裝展廳電子及裝飾裝修安全施工方案46頁.doc
  10. 大酒店公共區域及客房區域室內裝修改造工程墻面軟包施工組織設計86頁.doc
  11. 蔬菜大棚土建、鋼結構工程施工組織設計方案(66頁).doc
  12. 雨、污水管道工程PVC—U雙壁波紋管施工方案(37頁).doc
  13. 熱電聯產機組工程排水槽廢水池防腐施工安全專項方案(12頁).doc
  14. U型渠道建設工程施工組織設計方案(52頁).doc
  15. 秦皇島市北環路道路改造工程監理大綱(346頁).PDF
  16. 幼兒園建設工程項目可行性研究報告(486頁).doc
  17. 物業公司如何提高業主滿意度、提升服務質量演講課件.pptx
  18. 2018社區商業設計標準.pdf
  19. 杭州 ·長嶺居別墅項目故事線策劃方案.pdf
  20. 融創武義小鎮旅游度假項目故事線營銷推廣方案.pdf
  21. 2020江山悅地產項目故事線構建推廣方案.pdf
  22. 建筑大理石、花崗石干掛施工工藝(5頁).doc
  1. 服裝店鋪形象維護細則及獎懲管理制度.doc
  2. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  3. 水泥混凝土路面工程施工方案(17頁).doc
  4. 水泥混凝土路面工程專項施工方案(17頁).doc
  5. 2023年版建筑公司30套施工方案編制指南(1041頁).pdf
  6. 生態治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  7. 山西長治長豐綜合(43萬方)項目(住宅+酒店+商業+辦公)建筑方案設計(246頁).pdf
  8. 2024年建筑公司機電安裝工程質量創優策劃方案(108頁).docx
  9. 商業街夜市市集U+夜市定位規劃方案(73頁).pptx
  10. 生態治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  11. 地下停車場環氧地坪漆施工方案(19頁).docx
  12. 學生宿舍室外市政道路工程雨水管道工程施工組織設計方案(19頁).doc
  13. 工程施工機械車輛設備租賃合同(12頁).docx
  14. 中建二局-201號辦公質保樓項目檢驗和試驗計劃方案(45頁).doc
  15. 花苑小區住宅樓工程新工藝新技術應用施工方案(32頁).doc
  16. 土建、安裝、裝飾工程施工檢測試驗計劃表.docx
  17. 安全生產管理體系及保證措施方案(59頁).doc
  18. 蔬菜大棚鋼結構施工組織設計方案(65頁).pdf
  19. 冷卻水塔管道更換安裝施工方案(41頁).doc
  20. 綜合樓中央空調安裝施工組織設計方案(水、多聯機)(166頁).doc
  21. 建筑工程造價失控的原因分析及控制(3頁).docx
  22. 抹灰工程施工方案(水泥砂漿)(20頁).docx
  1. 風機安裝工程施工質量強制性條文執行記錄表(40頁).doc
  2. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  3. 服裝店鋪形象維護細則及獎懲管理制度.doc
  4. 東方國際休閑廣場商業定位與招商提案(51頁).ppt
  5. 建筑[2009]257號關于建立建筑業企業農民工工資保證金制度的通知【5頁】.doc
  6. 城市垃圾中轉站升級改造工程項目可行性研究報告129頁.docx
  7. 湖州市南潯區石淙鎮國土空間總體規劃方案(2021-2035年)(草案公示稿)(39頁).pdf
  8. 河南省城市基礎設升級改造項目可行性研究報告(107頁).doc
  9. 城市220kV電力線路改造工程項目可行性研究報告94頁.doc
  10. 電力公司樁基、墩基施工組織設計方案(38頁).doc
  11. 800MW光伏40MWh儲能光伏示范項目可行性研究報告306頁.pdf
  12. 2023珠海城市主干道道路升級改造工程項目可行性研究報告305頁.pdf
  13. 2023城鎮老舊小區配套基礎設施建設項目可行性研究報告(163頁).pdf
  14. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  15. 2022城市更新改造補短板老舊小區改造項目可行性研究報告(206頁).docx
  16. 2023年城鎮老舊小區改造及配套基礎設施建設項目可行性研究報告(84頁).pdf
  17. 2023生活區城鎮老舊小區改造項目可行性研究報告(附圖)(121頁).pdf
  18. 房產中介公司員工入職業務銷售技能培訓資料合集.zip
  19. 縣城配電網110kV輸變電工程項目可行性研究報告266頁.doc
  20. 水天苑小區地源熱泵空調系統設計方案(149頁).doc
  21. 2023城鎮老舊小區改造項目可行性研究報告(122頁).pdf
  22. 淮南礦業集團棚戶區改造項目八公山新村、和平村室外變配電工程施工組織設計方案(92頁).doc
主站蜘蛛池模板: 开封市| 玛多县| 山丹县| 永登县| 芜湖县| 隆安县| 丰台区| 荔浦县| 陵川县| 宜兴市| 苍南县| 建水县| 临夏县| 买车| 泰和县| 桂平市| 东源县| 西畴县| 呈贡县| 广南县| 益阳市| 新宁县| 来宾市| 神农架林区| 卓资县| 阿巴嘎旗| 安徽省| 甘南县| 彩票| 兴海县| 美姑县| 谷城县| 鹰潭市| 阳谷县| 博爱县| 普陀区| 东光县| 巴中市| 青岛市| 安国市| 宜宾县|