午啪啪夜福利无码亚洲,亚洲欧美suv精品,欧洲尺码日本尺码专线美国,老狼影院成年女人大片

個人中心
個人中心
添加客服微信
客服
添加客服微信
添加客服微信
關注微信公眾號
公眾號
關注微信公眾號
關注微信公眾號
升級會員
升級會員
返回頂部
頂管法施工方案英文版(5頁)
頂管法施工方案英文版(5頁).docx
下載文檔 下載文檔
其它文檔
上傳人:正*** 編號:487016 2022-07-25 5頁 68.09KB

下載文檔到電腦,查找使用更方便

10 金幣

  

還剩頁未讀,繼續閱讀

1、.Method Statement for Pipe Jacking1. Construction of PitsThe jacking pit with a dimension of 6mx5 clear opening with depth of 250mm below invert level of the steel pipe.The floor will be leveled by 100mm thick concrete blinding fixing tow I beams(1.5mx15cm) in the center of the pit for fixing jackin2、g frame.2. Installation of Jacking FrameAfter the construction of drive, the jacking rig will be lowered into the pit and adjust to the control line and level. The rig will be used on this contract consist of two number of hydraulic cylinders with a capacity of 150 ton each to give a total jacking f3、orce of 300 tons. The rig will have guided rails, pushing plate and base plate to hydraulic power back with control unit. The hydraulic system will run through a diesel engine installed the top of the pit.The rig will installed to the correct line and level and check by the consultant in respect to 4、level and alignment.3. Thrust WallConstructing a concrete block behind the base plate of the rig to a dimension of 2x1.5x0.5m will be provided to take and distribute the jacking load.4. Pipe Jacking OperationA steel shield is used at the front of the pipe to accommodate the.miner and to allow for st5、eering of the pipe jack. The soil within the shield is manually excavated and loaded into a wheel skip for transport to the pit bottom. The miner does not dig outside the shield (both in front and radically) and the front, or cutting edge, of the shield is always kept buried in the face, so stabilit6、y is maintained. The shield is thus used to trim the excavation to the size of the pipe thus minimizing the potential for settlement of the ground above the pipe jack.In the pit bottom, the skip is hoisted to the surface, emptied and returned to the used to loosen it prior to digging. The exact diam7、eter of shield will be selected to suit the pushing pipes.As excavation continues, the shield is jacking forward using two hydraulic jacks thrusting from the back wall. When the shield is buried, the jacks are retracted and the first sleeve pipe lowered on to the rails. This in then pushed up to the8、 shield and excavation can then continue. When the sleeve pipe is pushed home, the hydraulic jacks are retracted and the services (lighting& ventilation) disconnected. The next sleeve pipe is lowered on to the rails and the services reconnected and the cycle repeated until the shield is pushed into 9、the receiving pit and the pipeline pushed into final position.5. Maintaining Line and LevelIn order to maintain the correct line and level, a graduated target plate.is located within the shield. The site engineer notes the position of the visible sport on the target, this initial position is used as10、 reference value to locate the relative position of the shield at all times during the drive. At each push, the site engineer monitors the position reference value with the help of level instrument and theodalite, thus giving a shield position (high or low, right or left) relative to the design posi11、tion. Based on this information, the operator manipulates a correct course.Extending or retracting a combination of steering rams causing the front of the shield to articulate in the required direction carries out the steering. As the pipe follows the shield, the correct line and level will be maint12、ained. At all times, the amount steering applied is kept to minimum.6. Fixing Carrier PipesAfter completion of the pipe jacking , we check the line and level for the steel pipe and we take the exact line and level for the carrier pipe with the help of survey instruments.A 3 steel anglebar fixed by w13、elding in the correct bottom level of the carrier pipe, then 3mm thick flat bar half moon claps will fixed through wielding in the correct line after that we put neoprene rubber 3mm thick in the clamp to avoid the scratches of the carrier pipes.Then we start laying the carrier pipe one by one and fi14、x the clamps.through nuts and bolts. After fixing the nuts and bolts we make angle support in between the top of the clamp and top of the pipe. Then we fix the other pipe in the same manner. The same procedure will continues up to the requirement.7. GroutingUpon completion of pipe jacking we make 4 15、2 holes like ventilationin every meter, it helps the concrete fill the gap between the steel pipeand ground. Then we fixed six inch grouting pipe vertically one meterheight in the top of the pipe both end jacking and receiving. One sidewillkeep ventilation and the otherside forconnection andtheconcr16、ete pump.Afterthat we lay the carrier pipe inthe correct line and levelthencheck with the consultant and make the test required fromtheconsultant then we close the both end between steel and carrier pipe by m/s plate welding or masonry, the gap between steel sleeve and ground in the both end we close by cement.During grouting the grout will push through the down string end. Pumping process will continue till the grout reaches the up string end ventilation pipe. When the grout will overflow from the ventilation pipe, grouting process is completed.
會員尊享權益 會員尊享權益 會員尊享權益
500萬份文檔
500萬份文檔 免費下載
10萬資源包
10萬資源包 一鍵下載
4萬份資料
4萬份資料 打包下載
24小時客服
24小時客服 會員專屬
開通 VIP
升級會員
  • 周熱門排行

  • 月熱門排行

  • 季熱門排行

  1. 水泥混凝土路面工程施工方案(17頁).doc
  2. 水泥混凝土路面工程專項施工方案(17頁).doc
  3. 山西長治長豐綜合(43萬方)項目(住宅+酒店+商業+辦公)建筑方案設計(246頁).pdf
  4. 生態治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  5. 學生宿舍室外市政道路工程雨水管道工程施工組織設計方案(19頁).doc
  6. 2025預算員最全造價筆記包.zip
  7. 貴陽南明區地塊項目(住宅、商業+辦公+學校)建筑方案設計(311頁).pdf
  8. 西安金輝世界城J地塊綜合體項目建筑設計方案(318頁).pdf
  9. 醫院住院綜合大樓智能化弱電系統工程施工組織設計方案(151頁).doc
  10. 生態治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  11. 蔬菜大棚鋼結構施工組織設計方案(65頁).pdf
  12. 全輕混凝土地坪施工方案.doc
  13. 陳列布展廳建設工程電氣安裝展廳電子及裝飾裝修安全施工方案46頁.doc
  14. 蔬菜大棚土建、鋼結構工程施工組織設計方案(66頁).doc
  15. U型渠道建設工程施工組織設計方案(52頁).doc
  16. 黑龍江省伊春市國家森林城市建設總體規劃方案(2020-2030年)(224頁).docx
  17. 幼兒園建設工程項目可行性研究報告(486頁).doc
  18. 施工現場文明施工制度及措施【19頁】.doc
  19. 物業公司如何提高業主滿意度、提升服務質量演講課件.pptx
  20. 2018社區商業設計標準.pdf
  21. 建筑大理石、花崗石干掛施工工藝(5頁).doc
  22. 綠色建筑與綠色施工組織方案.pptx
  1. 服裝店鋪形象維護細則及獎懲管理制度.doc
  2. 水泥混凝土路面工程施工方案(17頁).doc
  3. 水泥混凝土路面工程專項施工方案(17頁).doc
  4. 2023年版建筑公司30套施工方案編制指南(1041頁).pdf
  5. 2024年建筑公司機電安裝工程質量創優策劃方案(108頁).docx
  6. 生態治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  7. 山西長治長豐綜合(43萬方)項目(住宅+酒店+商業+辦公)建筑方案設計(246頁).pdf
  8. 商業街夜市市集U+夜市定位規劃方案(73頁).pptx
  9. 生態治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  10. 地下停車場環氧地坪漆施工方案(19頁).docx
  11. 安全生產管理體系及保證措施方案(59頁).doc
  12. 學生宿舍室外市政道路工程雨水管道工程施工組織設計方案(19頁).doc
  13. 工程施工機械車輛設備租賃合同(12頁).docx
  14. 中建二局-201號辦公質保樓項目檢驗和試驗計劃方案(45頁).doc
  15. 小區環境綜合整治工程安全文明專項施工方案(20頁).docx
  16. 花苑小區住宅樓工程新工藝新技術應用施工方案(32頁).doc
  17. 土建、安裝、裝飾工程施工檢測試驗計劃表.docx
  18. 蔬菜大棚鋼結構施工組織設計方案(65頁).pdf
  19. 冷卻水塔管道更換安裝施工方案(41頁).doc
  20. 綜合樓中央空調安裝施工組織設計方案(水、多聯機)(166頁).doc
  21. 建筑工程造價失控的原因分析及控制(3頁).docx
  22. 抹灰工程施工方案(水泥砂漿)(20頁).docx
  1. 風機安裝工程施工質量強制性條文執行記錄表(40頁).doc
  2. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  3. 服裝店鋪形象維護細則及獎懲管理制度.doc
  4. 東方國際休閑廣場商業定位與招商提案(51頁).ppt
  5. 建筑[2009]257號關于建立建筑業企業農民工工資保證金制度的通知【5頁】.doc
  6. 城市垃圾中轉站升級改造工程項目可行性研究報告129頁.docx
  7. 湖州市南潯區石淙鎮國土空間總體規劃方案(2021-2035年)(草案公示稿)(39頁).pdf
  8. 河南省城市基礎設升級改造項目可行性研究報告(107頁).doc
  9. 城市220kV電力線路改造工程項目可行性研究報告94頁.doc
  10. 電力公司樁基、墩基施工組織設計方案(38頁).doc
  11. 800MW光伏40MWh儲能光伏示范項目可行性研究報告306頁.pdf
  12. 2023珠海城市主干道道路升級改造工程項目可行性研究報告305頁.pdf
  13. 2023城鎮老舊小區配套基礎設施建設項目可行性研究報告(163頁).pdf
  14. 2022城市更新改造補短板老舊小區改造項目可行性研究報告(206頁).docx
  15. 2023年城鎮老舊小區改造及配套基礎設施建設項目可行性研究報告(84頁).pdf
  16. 2023生活區城鎮老舊小區改造項目可行性研究報告(附圖)(121頁).pdf
  17. 房產中介公司員工入職業務銷售技能培訓資料合集.zip
  18. 縣城配電網110kV輸變電工程項目可行性研究報告266頁.doc
  19. 水天苑小區地源熱泵空調系統設計方案(149頁).doc
  20. 2023城鎮老舊小區改造項目可行性研究報告(122頁).pdf
  21. 淮南礦業集團棚戶區改造項目八公山新村、和平村室外變配電工程施工組織設計方案(92頁).doc
  22. 水泥混凝土路面工程專項施工方案(17頁).doc
主站蜘蛛池模板: 乌拉特后旗| 临沂市| 翁源县| 银川市| 兰州市| 瓮安县| 内丘县| 诸暨市| 弥勒县| 南安市| 抚远县| 万载县| 崇州市| 基隆市| 平谷区| 盘山县| 常州市| 全椒县| 长海县| 青岛市| 东兴市| 内乡县| 福海县| 东乡县| 应用必备| 栾城县| 修文县| 固阳县| 漳平市| 城市| 郎溪县| 九寨沟县| 孝义市| 太湖县| 二连浩特市| 南乐县| 泰和县| 凌源市| 夏河县| 南澳县| 巴彦县|