午啪啪夜福利无码亚洲,亚洲欧美suv精品,欧洲尺码日本尺码专线美国,老狼影院成年女人大片

個人中心
個人中心
添加客服微信
客服
添加客服微信
添加客服微信
關注微信公眾號
公眾號
關注微信公眾號
關注微信公眾號
升級會員
升級會員
返回頂部
施工方案的審查
施工方案的審查.doc
下載文檔 下載文檔
其它文檔
上傳人:正*** 編號:496398 2022-07-27 10頁 50.50KB

下載文檔到電腦,查找使用更方便

10 金幣

  

還剩頁未讀,繼續(xù)閱讀

1、施工方案的審查Brief discussion on construction plan review by directorThe construction plan is the core of the construction organization design, and also is one of the main documents guiding the site operation. Whether it is reasonable or not will directly affect the cost, duration and quality of the proje2、ct The advantages and disadvantages of the construction plan have direct and decisive influence on the economic benefit of the construction stage and the quality of the project As one of the main participants in the construction of the project, the Commissioner of the supervision department, the con3、struction program to seriously review, identify problems, pointing out, is related to the requirements of the laws and regulations, but also the director s obligations In this paper, the construction plan review, talk about their own ideas, for readers reference1 construction organization design and4、 construction plan contact and differeneeThe construction organization design is the basic technical and economic documents of construction enterprises in guiding a project preparations for the organization and implementation, is to the project (or single unit project) the construction preparation a5、nd the whole construction process, a comprehensive plan made in the aspects of human, financial and material resources, time, space, technology and organization the construction scheme of arrangement; construction unit or branch (sub) analysis of a construction technology and construction methods in6、 engineering, is through technical and economic conditions needed for construction process in the implementation of labor, materials, machinery costs and schedule in a reasonable organization analysis, construction technology and method is feasible and optimal choose from For some construction diffi7、culties and key sub - section projects, it is also necessary to draw up special construction plans1.1, the connection between the two(1) the relationship between the whole and local construction organization design is the overall construction plan, is local; construction plan is an essential part of8、 the project construction organization design, construction scheme from the construction organization design is of no significance, is to guide the construction of the(2) the relationship between guidance and guidance: construction plan must be carried out in the overall planning and overall deploym9、ent of the construction organization design; construction plan is always carried out in the preparation and implementation of construction organization design under the guidance of the1.2 the difference between the two(1) for different purposes: the construction organization design is the selection 10、method for the construction of the manpower and material resources, all aspects of time and space layout are arranged to clear the construction plan according to the requirements: the construction scheme is the preparation of concrete construction technology and method of a part, in order to ensure 11、the quality requirements and requirements safe and civilized construction.(2) the content of the preparation is different: the object of the construction organization design is the whole of the project It involves the construction of various aspects of the content, including project organization div12、ision, construction scheme, construction sequence, optimal allocation and save the use of various production factors and so on; the object of construction scheme is usually engineering division. The contents include the concept of the project, the difficulties in construction, the selection of the c13、onstruction methods and the specific construction methods and so on.(3) the emphasis is different: the construction organization design focuses on the plan, and the construction plan focuses on the imp1ementation.(4) the starting point is different: the construction organization design is from the a14、ngle of project management, and the construction plan is from the angle of project implementation layer2, the existing problems in the preparation of construction plansNow, some construction enterprises do not attach importance to the construction scheme, especially the small and medium-sized constr15、uction enterprises do not really understand the importance of construction plan, the specific circumstances so in the construction scheme combined with no project seriously for the preparation, so that the construction scheme has the following deficiencies and problems in the preparation and Impleme16、ntation process(1) the contents of most construction projects do not conform to the basic requirements of the state regulations, standards and technical specifications, nor are they in only one form according to the actual construction conditions and design drawings requirements From the content poi17、nt of view, this kind of construction plan is only some construction technology standards and other technical data for simple piling up.The construction plan is often used as a necessary data or only to be checked by the relevant department(2) for different engineering types, the construction plan f18、ailed to make a real analysis of the technical and economic indexes, and the diagrams, network design and calculation methods are all in a state of lack of scientific and unified standards(3) the construction market with the owners of construction enterprises (Contractor) put forward the increasingl19、y severe requirements, require the contractor to cope with the owners, not to consider the enterprise technical equipment and management level, not according to the actual situation of engineering, natural conditions and types of enterprises, develop truly can satisfy the construction plan of constr20、uction operation and construct!on management(4) the construction scheme can not play a guiding role in construction. First of all, the lack of technical staff construction scheme of theoretical foundation and concrete construction experience, according to set existing specification content copy prep21、aration, not for technical and economic analysis for the specific project object, does not have the function of guiding. Secondly, from the management mechanism, we have not always insisted on the construction plan as a guiding document, ignoring its authority, in the preparation, examination and ap22、proval, implementation, revision and other links, have not attracted enough attention. Therefore, the construction process can not really guide the role, can not be limited in certain resources and conditions, to achieve the technical and economic benefits of the project(5) the text of the construct23、ion plan is confused At present many staff computer application level and the writing level is not high, the construction program, or typo more typesetting confusion, but can not make good use of the chart, the construction scheme is not beautiful, hiberarchy is not clear, also affected the guiding 24、role of the construction scheme in a certain extent3 chief inspector on construction plan review of several pointsBecause of the different understanding of the construction plan, the content of the construction scheme compiled by different localities and units is also different To further understand25、 the role of the construction programme, the director shall examine the construction plan primarily from the following aspects3. 1 whether the basis of the construction plan conforms to the requirementsPrepared according to the construction plan are: construction drawings, construction organization 26、design, construction of the scene investigation to the data and information, construction and acceptance specification, unified standard for quality inspection and acceptance, safety operation procedures, construction and mechanical performanee manual, new technology, new equipment, new technology a27、nd so on. Some construction enterprises in the preparation of construction plans, the use of obsolete norms and standards, so that it can not guide construction operations.3.2, the content of the construction plan is complete?In order to strict construction plan preparation requirements, according t28、o the construction project management standard GB / T50362 - 2001 article 4.3.7, the construction scheme shall include the following contents (1) construction and construction sequence; (2) division of construction stages; (3) the construction method and construction machinery selection;(4) the cons29、truction safety design; (5) the contents and methods of environmental protectionGenerally speaking, the construction scheme for a single project system should include the following parts: 1) basis;2) item summary and construction conditions; 3) the overall arrangement of the construction; 4) constru30、ction method, technological process, construction sequence 5); quality standard; 6) quality control points; 7), security civilization and environment protection etc3. 3 does the construction plan meet the requirements of the relevant laws and regulations?(1) whether the construction plan meets the r31、equirements of compulsory provisions In addition to the construction characteristics of the project in accordanee with the construction process standards and organizations, but also to meet the requirements of the corresponding mandatory provisions For example, the technical specification for buildi32、ng foundation pit support (JGJ120 一 99) 3.7.5: in the process of foundation pit excavation, measures shall be taken to prevent the collision of retaining structures, engineering piles or undisturbed undisturbed scdl. Code for acceptance of construction quality of concrete structures (GB50204-2002) 433、.1.3: the sequence and safety measures for the removal offormwork and its supports shall be carried out in accordance with the construction technical scheme.Code for acceptance of construction quality of roof (GB50207 -2002 7. 1. 5) : a kind of must be laid firmly. Measures should be taken to streng34、then the seismic fortification area or the roof with a slope greater than 50% Technical code for safety of construction work at height (JGJ80 一 91) 3.1.1: operation on temporary high side, protective measures must be set up. Wai to(2) whether the construction plan meets the requirements of the regul35、ations on the administration of construction safety production. Such as: twenty-sixth construction units should prepare safety technical measures and construction site in the construction organization design scheme for the temporary use of electricity, to achieve a certain scale hazardous project pr36、epare special construction scheme, and affix the safety check result, the construction unit responsible for the technical and the general supervision engineer signed after the implementation. The full-time safety management personnel on-site supervision: 1) excavation and dewatering engineering; 2) 37、excavation engineering; 3) template engineering; 4) the lifting scaffolding engineering; engineering; 5) 6), demolition blasting engineering; 7) regulations of the competent administrative department of construction under the State Council or other relevant departments of the other risk large engine38、ering The construction units shall also organize experts to demonstrate and examine the special construction schemes for deep excavations, underground excavation works and high formwork projects in the projects mentioned in the preceding paragraph(3) whether the construction plan meets the requireme39、nts of the Construction Supervision Specification. For example, 5.4.8: the chief supervision eng in eer shall arrange for the inspector to inspect and inspect the construction process The key parts of the concealed engineering hidden process, construction process after the completion of difficult to40、 check, the discipline engineer shall carry out on-site supervision personnel arrangement Under normal circumstances, supervision enterprises will also require construction units to these sites, processes, preparation of construction programs.(4) whether the construction plan meets the requirements 41、prescribed by the local competent department In addition to the relevant laws and regulations and standards and regulations formulated by the state, local authorities have also issued many local requirements In the preparation of construction plans, should comply with their requirements3. 4 construc42、tion plan commonly used in the calculation of the review(1) the review of formwork calculation: the cost of formwork is about 1 / 3 of the cost of concrete works When reviewing the scheme, the design and calculation of the formwork structure should be reviewed from the practical, safety and economic43、 aspects, and the load, load combinations and structural rigidity of the formwork shall be in line with the requirements(2) calculation of exterior frame review: 1) calculation of lateral rod strength; 2) calculation of longitudinal strength;3) connecting fastener anti slide bearing capacity calcula44、tion;4) calculation of rod stability; 5) wall calculation; 6) vertical bearing capacity calculation of pole foundation.(3) temporary power consumption calculation review: the power supply plan and power supply system of construction electricity should be reviewed to ensure the safety and reliability45、 of construction electricity Some construction enterprises have no understanding of the nature of power consumption and power factor in the field construction, which results in errors in calculation, and hidden dangers for temporary construction electricity, which results in unnecessary losses Durin46、g the review, the chief executive should review the calculation of the capacity and the capacity of the equipment(4) temporary water use calculation review: mainly from the water consumption determination, water supply pipe diameter determination and the selection of water pumps in several aspects o47、f review.(5) calculation and review of receiving platform: review should be done mainly from horizontal horizontal bar, calculation of skid resistance of connecting rod and calculation of intermediate stay pole3. 5 review some new technologies, processes and materials usedSome construction units, in order to improve the progress and quality of construction, the use of new technologies, new processes, new materials As director, we should conduct innovative construction projects
會員尊享權益 會員尊享權益 會員尊享權益
500萬份文檔
500萬份文檔 免費下載
10萬資源包
10萬資源包 一鍵下載
4萬份資料
4萬份資料 打包下載
24小時客服
24小時客服 會員專屬
開通 VIP
升級會員
  • 周熱門排行

  • 月熱門排行

  • 季熱門排行

  1. 2018龍湖地產(chǎn)批量精裝修管理方案.ppt
  2. 建筑鋼筋平法培訓課件.ppt
  3. 2023東城街城鄉(xiāng)結合示范帶建設項目可行性研究報告(248頁).pdf
  4. 工業(yè)廠房及附屬設施綜合樓輪扣式高支模腳手架專項施工方案(60頁).docx
  5. 龍湖集團運營體系組織架構.ppt
  6. 再生水廠配套管網(wǎng)工程項目有限空間作業(yè)事故應急救援預案.doc
  7. 智慧城市項目可行性研究報告(257頁).doc
  8. 龍湖地產(chǎn)工程精細化管理方案(150頁).ppt
  9. 龍湖房地產(chǎn)開發(fā)公司項目工程建安成本管理思路.ppt
  10. 沁源綠化園林工程公司ISO質量手冊和程序文件匯編65頁.doc
  11. 科學技術新館鋼結構工程桁架制作及桁架預拼裝施工方案44頁.doc
  12. 嘉善縣陶莊鎮(zhèn)國土空間總體規(guī)劃方案(2021-2035年)(草案公示)(58頁).pdf
  13. 五星級酒店室內裝修改造工程施工組織設計方案(187頁).doc
  14. 雙遼電廠一期配電室基礎及上部結構施工方案(24頁).doc
  15. 排水溝清淤施工方案(25頁).pdf
  16. 廠區(qū)雨水管道、污水管道、天燃氣管道施工組織設計方案(111頁).doc
  17. 龍湖物業(yè)管理與品牌建設培訓課件.ppt
  18. 重慶龍湖成本管理實施細則.ppt
  19. 龍湖企業(yè)管理及運營精細化管理研究報告.ppt
  20. 土建、裝飾、維修改造等零星工程施工組織設計方案(187頁).doc
  21. 年產(chǎn)15萬噸尿基復混肥工廠建設項目可行性研究報告66頁.doc
  22. 2021龍湖地產(chǎn)企業(yè)薪酬數(shù)據(jù)分析報告.ppt
  1. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  2. 田螺山河姆渡文化遺址生活館室內設計方案(247頁).pdf
  3. 建筑工程公司資料員取證培訓課件(307頁).ppt
  4. 水泥混凝土路面工程施工方案(17頁).doc
  5. 水泥混凝土路面工程專項施工方案(17頁).doc
  6. 建筑公司安全物資供應單位及個人防護用品管理制度.doc
  7. 生態(tài)治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  8. 2018龍湖地產(chǎn)批量精裝修管理方案.ppt
  9. 建筑鋼筋平法培訓課件.ppt
  10. 2025預算員最全造價筆記包.zip
  11. 山西長治長豐綜合(43萬方)項目(住宅+酒店+商業(yè)+辦公)建筑方案設計(246頁).pdf
  12. 施工企業(yè)安全技術交底范本大全(361頁).pdf
  13. 2024年建筑公司機電安裝工程質量創(chuàng)優(yōu)策劃方案(108頁).docx
  14. 2023東城街城鄉(xiāng)結合示范帶建設項目可行性研究報告(248頁).pdf
  15. 生態(tài)治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  16. 工業(yè)廠房及附屬設施綜合樓輪扣式高支模腳手架專項施工方案(60頁).docx
  17. 2021房地產(chǎn)公司創(chuàng)新建筑立面設計研發(fā)手冊(50頁).pdf
  18. 學生宿舍室外市政道路工程雨水管道工程施工組織設計方案(19頁).doc
  19. 土建、裝飾、維修改造等零星工程施工組織設計方案(187頁).doc
  20. 龍湖房地產(chǎn)開發(fā)公司項目工程建安成本管理思路.ppt
  21. 杭州 ·長嶺居別墅項目故事線策劃方案.pdf
  22. 住宅樓施工組織設計書(137頁).doc
  1. 風機安裝工程施工質量強制性條文執(zhí)行記錄表(40頁).doc
  2. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  3. 服裝店鋪形象維護細則及獎懲管理制度.doc
  4. 東方國際休閑廣場商業(yè)定位與招商提案(51頁).ppt
  5. 建筑[2009]257號關于建立建筑業(yè)企業(yè)農民工工資保證金制度的通知【5頁】.doc
  6. 城市垃圾中轉站升級改造工程項目可行性研究報告129頁.docx
  7. 湖州市南潯區(qū)石淙鎮(zhèn)國土空間總體規(guī)劃方案(2021-2035年)(草案公示稿)(39頁).pdf
  8. 河南省城市基礎設升級改造項目可行性研究報告(107頁).doc
  9. 城市220kV電力線路改造工程項目可行性研究報告94頁.doc
  10. 800MW光伏40MWh儲能光伏示范項目可行性研究報告306頁.pdf
  11. 2023珠海城市主干道道路升級改造工程項目可行性研究報告305頁.pdf
  12. 2023城鎮(zhèn)老舊小區(qū)配套基礎設施建設項目可行性研究報告(163頁).pdf
  13. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  14. 2022城市更新改造補短板老舊小區(qū)改造項目可行性研究報告(206頁).docx
  15. 2023年城鎮(zhèn)老舊小區(qū)改造及配套基礎設施建設項目可行性研究報告(84頁).pdf
  16. 2023生活區(qū)城鎮(zhèn)老舊小區(qū)改造項目可行性研究報告(附圖)(121頁).pdf
  17. 縣城配電網(wǎng)110kV輸變電工程項目可行性研究報告266頁.doc
  18. 水天苑小區(qū)地源熱泵空調系統(tǒng)設計方案(149頁).doc
  19. 2023城鎮(zhèn)老舊小區(qū)改造項目可行性研究報告(122頁).pdf
  20. 田螺山河姆渡文化遺址生活館室內設計方案(247頁).pdf
  21. 淮南礦業(yè)集團棚戶區(qū)改造項目八公山新村、和平村室外變配電工程施工組織設計方案(92頁).doc
  22. 建筑工程公司資料員取證培訓課件(307頁).ppt
主站蜘蛛池模板: 衡阳市| 建德市| 平舆县| 云龙县| 霍城县| 巴塘县| 长汀县| 湄潭县| 武乡县| 建平县| 阳东县| 抚顺市| 洪江市| 贡嘎县| 鹿泉市| 漯河市| 安顺市| 德昌县| 陇南市| 平乡县| 东乡县| 凤山县| 富平县| 酒泉市| 沙田区| 东城区| 郎溪县| 仙游县| 梁山县| 信丰县| 开封县| 大悟县| 许昌市| 台前县| 苏尼特左旗| 板桥市| 区。| 峨山| 大港区| 宣汉县| 郁南县|