午啪啪夜福利无码亚洲,亚洲欧美suv精品,欧洲尺码日本尺码专线美国,老狼影院成年女人大片

個(gè)人中心
個(gè)人中心
添加客服微信
客服
添加客服微信
添加客服微信
關(guān)注微信公眾號(hào)
公眾號(hào)
關(guān)注微信公眾號(hào)
關(guān)注微信公眾號(hào)
升級(jí)會(huì)員
升級(jí)會(huì)員
返回頂部
腳手架搭設(shè)施工方案中英文(10頁(yè))
腳手架搭設(shè)施工方案中英文(10頁(yè)).pdf
下載文檔 下載文檔
其它文檔
上傳人:正*** 編號(hào):499622 2022-07-29 10頁(yè) 18.47KB

下載文檔到電腦,查找使用更方便

10 金幣

  

還剩頁(yè)未讀,繼續(xù)閱讀

1、目錄Directory 一、施工地點(diǎn):Job location.1二、參照標(biāo)準(zhǔn):Basis of compiling.2三、材料標(biāo)準(zhǔn):Material streamlined specification.2(一)鋼管:Steel pipe.2(二)扣件:Fastener.3(三)腳手板:Scaffold board.3(四)安全網(wǎng):Protecting net.3四、施工工藝:Construction technique.4(一)施工準(zhǔn)備:Preparations for construction.4(二)腳手架搭設(shè)的要求:Requirement of scaffold.4A、立桿構(gòu)造要求:V2、ertical.5B、縱向水平桿的構(gòu)造要求:Longitudinal horizontal bracing.6C、橫向水平桿的構(gòu)造要求:Transverse horizontal bracing.6D、腳手板的設(shè)置:Scaffold board laying.7E、剪刀撐:X-bracing.8F、扣件:Fastener.8(三)腳手架的使用:Requirement of use the scaffold.8(四)腳手架的拆除:Demolition the scaffold.9五、注意事項(xiàng):Notice proceeding.9一、施工地點(diǎn):Job location*化工區(qū)工業(yè)氣體二期管道設(shè)備3、保溫工程*caojing HYCO1 STEP-2 insulation project 二、參照標(biāo)準(zhǔn):Basis of compiling JGJ130-2001 建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范Steel pipe scaffold safety code of building construction with the fastener 三、材料標(biāo)準(zhǔn):Material streamlined specification(一)鋼管:Steel pipe 1、腳手架鋼管采用外徑48mm,壁厚 3.5mm,橫向水平桿2200mm,其他桿 6500mm,每根鋼管不應(yīng)大于25kg。2、鋼管表4、面應(yīng)平直光滑,不應(yīng)有裂縫、結(jié)疤、分層、錯(cuò)位、硬彎、毛刺、壓痕和深的劃道。3、鋼管的外徑、壁厚、端面等的偏差,應(yīng)分別符合建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范(JGJ130-2001)的有關(guān)規(guī)定。1.The external diameter of the steel pipe is 48mm,and thickness of pipe wall is 3.5mm.Transverse horizontal bracing shall be less than 2200mm,others less than 6500mm,and every steel pipe shall be less tha5、n 25kg.2.The surface of the steel pipe shall be smoothness,and has not the crack,dogs ear,delaminating,burr and deep nick etc.3.The deviation of the steel pipe,as the external diameter,thickness of pipe wall,port etc,shall be accord the code Steel pipe scaffold safety code of building construction w6、ith the fastener(二)扣件:Fastener 1、扣件采用 48 型。扣件的類(lèi)型包括:直角扣件、旋轉(zhuǎn)扣件、對(duì)接扣件、防滑扣件。2、腳手架采用的扣件,其材質(zhì)應(yīng)符合國(guó)家現(xiàn)行標(biāo)準(zhǔn)。1.Fastener adopt the type of 48,and the types include the right-angle,circumgyrate,butt joint,and slip-resistance.2.The fastener of the scaffold shall be accord the GB code.(三)腳手板:Scaffold board 1、腳手板采用木質(zhì),7、每塊質(zhì)量不宜大于30kg。2、木腳手板應(yīng)采用杉木或松木制作,其材質(zhì)應(yīng)符合國(guó)家現(xiàn)行標(biāo)準(zhǔn)。3、腳手板的寬度不宜小于200mm,厚度不應(yīng)小于50mm,兩端應(yīng)各設(shè)直徑4mm 的鍍鋅鐵絲綁扎兩道。1.Every scaffolds quality shall be less than 30kg.2.Scaffold board shall be make of the fir or deal,and accord the GB code.3.The width of the scaffold board shall be over 200mm and thickness over 50mm.On the8、 ends with the 4mm galvanized wire fixing the board.(四)安全網(wǎng):Protecting net 在腳手架施工操作面和護(hù)欄四周?chē)戏雷o(hù)網(wǎng)。It shall be laying safety netting on the operating platform and protecting fence.四、施工工藝:Construction technique(一)施工準(zhǔn)備:Preparations for construction 1、工程負(fù)責(zé)人應(yīng)按施工組織設(shè)計(jì)中有關(guān)腳手架的要求,向架設(shè)和使用人員進(jìn)行技術(shù)交底。2、應(yīng)對(duì)所有進(jìn)場(chǎng)材料按規(guī)范進(jìn)行驗(yàn)收,9、不合格產(chǎn)品不得使用。3、經(jīng)檢驗(yàn)合格的構(gòu)配件應(yīng)按品種、規(guī)格分類(lèi)、堆放整齊、平穩(wěn),堆放場(chǎng)地不得有積水。4、當(dāng)腳手架基礎(chǔ)下有設(shè)備基礎(chǔ)、管溝時(shí),必須采取加固措施。1.The project manager shall be show the regulations for technical operation on the operation worker,about scaffold in this scheme.2.All the material must be check and acceptance,and no qualification no use.3.The qualificati10、on material shall be stack-up regularity and firmness.The place shall be no water.4.When it has equipment foundation,pipe duct under the base of scaffold,it must to be consolidation.(二)腳手架搭設(shè)的要求:Requirement of scaffold 1、所搭設(shè)的腳手架要堅(jiān)固、穩(wěn)定,保證在施工期內(nèi)及各種載荷和氣候條件下不產(chǎn)生變形,不傾斜、不搖晃,安全可靠。2、根據(jù)搭設(shè)空間,選用適宜的腳手架鋼管長(zhǎng)度。必須有足夠的空11、間,滿(mǎn)足操作、材料堆放及行人的要求。3、腳手架的搭設(shè)寬度根據(jù)構(gòu)造要求不能小于1-1.3m,作業(yè)層大橫桿間隔La/2m,小橫桿間隔不能大于縱距的1/2,立桿橫距不能大于1-1.3m,立桿縱距不能大于 1.5-2.0m。4、K201-K202 整體腳手架重大約16T,搭設(shè)面長(zhǎng) 10.3 米寬 4.6 米高度 30 米,搭設(shè)時(shí)層面和作業(yè)平臺(tái)連接.支撐以減少整體負(fù)荷,施工人員上下可利用原有設(shè)施,作業(yè)平臺(tái)和施工平面須使用梯子上下。1.The scaffold must be firmness,steadiness.During the useful time,it must be no deformat12、ion,no inclination,no sway and safety on the kind of load and climate.2.The pipe of the scaffold must be select the suitable length by the building space,and the space must be enough to suitable for operate,material stack-up and passage.3.The width of the scaffold shall be more than 1-1.3m.In the op13、erating lay,the big traverse bar shall be distance La/2m,and the small traverse bar shall be less than 1/2 of longitudinal distance.The traverse distance of vertical shall be less than 1-1.3m,and longitudinal less than 1.5-2.0m.4.The scaffold weight of the equipment K201-K202 is about 16T,length abo14、ut 10.3m,width 4.6m,and height about 30m.When its building,the operating lay join the platform to reduce the load.The worker may be use the device,when they up and down,but on operating lay must be use the ladder.A、立桿構(gòu)造要求:Vertical 1、腳手架必須調(diào)協(xié)縱、橫向掃地桿??v向掃地桿應(yīng)用直角扣件固定在距底座上皮不大于 200mm 處的立桿上,橫向掃地桿應(yīng)用直角扣件固定在緊靠縱15、向掃地桿下方的立桿上。2、當(dāng)立桿基礎(chǔ)不在同一高度上時(shí),必須較高處的縱向桿向低處延長(zhǎng),與立桿固定,高低差不應(yīng)大于1m。3、立桿接長(zhǎng)除頂層頂步可采用搭接外,其余各層各步接頭必須采用對(duì)接扣件連接。1.When the scaffold build,it shall be harmonize the vertically and horizontally pipe.The vertically pipe shall be fix the base with the right-angle fastener and less than 200mm.The horizontally pipe shall 16、be fix under the vertically pipe tightly with the right-angle fastener.2.When the vertical base is not on the same plane,it shall be extend from highness to lowness,and the gap shall be less than 1m.3.When the vertical join each other,it must be use the butt joint fastener,but the top.B、縱向水平桿的構(gòu)造要求:L17、ongitudinal horizontal bracing 1、縱向水平桿宜設(shè)置在立桿內(nèi)側(cè),其長(zhǎng)度不宜小于3 跨。2、縱向水平桿接長(zhǎng)宜采用對(duì)接扣件連接,也可采用搭接。3、當(dāng)使用木腳手板時(shí),縱向水平桿應(yīng)作為橫向水平桿的支座,用直角扣件固定在立桿上。1.Longitudinal horizontal bracing shall be inside the vertical and length shall be more than 3 span.2.Longitudinal horizontal bracing may be use the butt joint or lap joint wit18、h the fastener.3.When use the scaffold board,longitudinal horizontal bracing is the base of the transverse horizontal bracing,and fix the vertical with the right-angle fastener.C、橫向水平桿的構(gòu)造要求:Transverse horizontal bracing 1、主節(jié)點(diǎn)處必須設(shè)置一根橫向水平桿,用直角扣件扣緊且嚴(yán)禁拆除。2、主節(jié)點(diǎn)處兩個(gè)直角扣件的中心距不應(yīng)大于150mm。3、作業(yè)層上非主節(jié)點(diǎn)處的橫向水平桿,宜根據(jù)支承19、腳手板的需要等間距設(shè)置,最大間距不應(yīng)大于縱距的1/2。1.The central node must be set one transverse horizontal bracing and forbid backout.2.The two right-angle fastener of the central node shall be less than 150mm each other.3.The transverse horizontal bracing of the other node on the operating lay which is not the central,sh20、all be set base on needs,and the max distance shall be less than 1/2 of the longitudinal.D、腳手板的設(shè)置:Scaffold board laying 1、作業(yè)層的腳手板應(yīng)鋪滿(mǎn)、鋪穩(wěn)。2、腳手板應(yīng)設(shè)置在三根橫向水平桿上。當(dāng)腳手板的長(zhǎng)度小于2m 時(shí),可采用兩根橫向水平桿支承,但應(yīng)將腳手板兩端與其可靠固定,嚴(yán)防傾翻。3、腳手板可采用對(duì)接平鋪或搭接鋪設(shè)。4、作業(yè)層上端部腳手板探頭長(zhǎng)度應(yīng)取150mm,其板長(zhǎng)度兩端均應(yīng)與支承桿可靠固定,可用直徑3.2mm 的鍍鋅鐵絲固定在支承桿桿上。1.The scaffold bo21、ard of the operating lay shall be pave the all and fixedness.2.The scaffold board shall be lay on three transverse horizontal bracing,when length less than 2m,it may be use the two,but must fix on the ends.3.The scaffold board may be butt joint or lap joint.4.The ends of the scaffold board on the op22、erating lay shall be overstep about 150mm and fix it on the knighthead with the 3.2mm galvanized wire.E、剪刀撐:X-bracing 1、腳手架的兩端、轉(zhuǎn)角處及每隔5-7 個(gè)立桿必須設(shè)剪刀撐,并由底至頂連續(xù)設(shè)置,斜桿與地面的夾角為45-60,中間各道剪刀撐之間的凈距不應(yīng)大于15mm。2、剪刀撐斜桿的接長(zhǎng)宜采用搭接。1.The scaffold must set the X-bracing on the ends,turns and alternation 5-7 vertical.It mus23、t be from bottom to top.The diagonal s angle is 45-60 to the ground.Each X-bracing distance shall be less than 15mm.2.The distance of X-bracing shall be use the lap joint.F、扣件:Fastener 1、扣件規(guī)格必須與鋼管外徑相同。2、對(duì)接扣件開(kāi)口應(yīng)向上或向內(nèi)。3、各桿件端頭伸出扣件蓋板邊緣的長(zhǎng)度不應(yīng)小于100mm。1.The spec of fastener must be same as the external diam24、eter of pipe.2.The open of butt joint fastener shall be up or entad.3.The length shall be more than 100mm,which overstep the fastener on the ends of pipe.(三)腳手架的使用:Requirement of use the scaffold 1、沒(méi)有經(jīng)過(guò)驗(yàn)收的腳手架一律嚴(yán)禁使用。2、腳手架使用前,必須認(rèn)真檢查腳手架是否完好、牢固,如有異常應(yīng)立即提出整改,合格后方能使用。3、應(yīng)定期檢查安全防護(hù)措施是否符合要求,扣件螺栓是否松動(dòng)及是否超載等。1.Th25、e scaffold must be check and acceptance.2.Before use the scaffold,it must to checked.If it has abnormity,it must to refit.3.It must check the means of safety termly,and must be up to the mustard.(四)腳手架的拆除:Demolition the scaffold 1、應(yīng)根據(jù)現(xiàn)場(chǎng)情況及業(yè)主要求,及時(shí)進(jìn)行腳手架的拆除工作。2、腳手架拆除前,應(yīng)清除腳手架上雜物及地面障礙物。3、拆除作業(yè)應(yīng)由上而下逐層進(jìn)行,嚴(yán)禁26、上下同時(shí)作業(yè)。4、拆下的腳手架材料應(yīng)及時(shí)運(yùn)走,不亂堆亂放。5、拆除后,應(yīng)及時(shí)對(duì)現(xiàn)場(chǎng)清理,保持場(chǎng)地清潔。1.It shall be dismantle the scaffold in time,by the requirement of the owner and case of the locale.2.Before dismantle the scaffold,it must be clean the sundries on scaffold and the abattis on the ground.3.Dismantle the scaffold shall be from up to 27、down.Prohibit labour at one time.4.The material which is dismantle shall be carry out in time.5.After finish,it shall be clean the locale in time,keep up the cleanness.五、注意事項(xiàng):Notice proceeding 1、安裝鋼腳手架時(shí),禁止使用彎曲、壓扁或有裂縫的鋼管,連接部分要完整無(wú)損,以防傾倒或移動(dòng)。2、鋼腳手架的立桿,必須垂直穩(wěn)放在墊木的鋼板上,在安置墊木前要將地面夯實(shí)、整平,并采取防滑措施。3、搭設(shè)腳手架人員必須按規(guī)定28、穿戴好防護(hù)用品。4、安全網(wǎng)應(yīng)按有關(guān)規(guī)定搭設(shè)和拆除。5、在腳手架使用期間,禁止拆除主節(jié)點(diǎn)處縱、橫向水平桿和縱、橫向掃地桿。6、搭拆腳手架時(shí),地面應(yīng)設(shè)圍欄和警戒標(biāo)志,并派專(zhuān)人看守,嚴(yán)禁非操作人員入內(nèi)。1.When build the scaffold,that pipe which has bend,bruising or crack,is prohibit to use.And the part of join shall be intactness.2.When build the vertical,the ground shall be tamp,flattening and avoid s29、lip.3.The workers,who build the scaffold shall be dress the protective measure that necessary.4.Safety netting must be accord the code when it building and demolition.5.During the scaffold use,prohibit demolition the vertically and horizontally bracing on the central node.6.When demolition the scaffold,it shall be set up the sign,and prohibit come into who is not the workers.2013 年 9 月 Sep.9.2013
會(huì)員尊享權(quán)益 會(huì)員尊享權(quán)益 會(huì)員尊享權(quán)益
500萬(wàn)份文檔
500萬(wàn)份文檔 免費(fèi)下載
10萬(wàn)資源包
10萬(wàn)資源包 一鍵下載
4萬(wàn)份資料
4萬(wàn)份資料 打包下載
24小時(shí)客服
24小時(shí)客服 會(huì)員專(zhuān)屬
開(kāi)通 VIP
升級(jí)會(huì)員
  • 周熱門(mén)排行

  • 月熱門(mén)排行

  • 季熱門(mén)排行

  1. 建筑公司安全物資供應(yīng)單位及個(gè)人防護(hù)用品管理制度.doc
  2. 2021房地產(chǎn)公司創(chuàng)新建筑立面設(shè)計(jì)研發(fā)手冊(cè)(50頁(yè)).pdf
  3. 縣新型智慧城市綜合管理服務(wù)平臺(tái)可行性及概算方案研究報(bào)告(815頁(yè)).docx
  4. 西安·綠地中心B座幕墻工程超高層單元式幕墻施工組織設(shè)計(jì)方案(223頁(yè)).pdf
  5. 住宅新中式和法式立面標(biāo)準(zhǔn)化設(shè)計(jì)產(chǎn)品研發(fā)手冊(cè)(含出入口標(biāo)準(zhǔn)化)(273頁(yè)).pdf
  6. 杭州 ·長(zhǎng)嶺居別墅項(xiàng)目故事線策劃方案.pdf
  7. 邊坡治理工程錨索錨桿格構(gòu)梁施工技術(shù)交底.doc
  8. 2022武漢安嶼那住宅地產(chǎn)項(xiàng)目故事線推廣方案(40頁(yè)).pdf
  9. 地產(chǎn)項(xiàng)目故事線梳理創(chuàng)作案例與場(chǎng)景運(yùn)用培訓(xùn)課件(82頁(yè)).pptx
  10. 建筑設(shè)計(jì)公司魔奇公寓研發(fā)及創(chuàng)新手冊(cè)(101頁(yè)).pdf
  11. 總承包企業(yè)建設(shè)項(xiàng)目代發(fā)工資管理制度.doc
  12. 施工工地觸電傷害現(xiàn)場(chǎng)應(yīng)急搶救預(yù)案.doc
  13. 綠城售樓處示范區(qū)中式風(fēng)格建筑設(shè)計(jì)研發(fā)手冊(cè)(380頁(yè)).pdf
  14. 創(chuàng)新性公寓標(biāo)準(zhǔn)化研發(fā)手冊(cè)(101頁(yè)).pdf
  15. 水利水電工程單元工程施工質(zhì)量驗(yàn)收評(píng)定表.doc
  16. 園林綠化工程公司檔案管理制度(25頁(yè)).doc
  17. 2018智造系房地產(chǎn)產(chǎn)品價(jià)值梳理故事線方案(46頁(yè)).pdf
  18. 秦皇島市北環(huán)路道路改造工程監(jiān)理大綱(346頁(yè)).PDF
  19. 江蘇會(huì)展中心幕墻施工組織設(shè)計(jì)方案,玻璃幕墻,鋁板幕墻(230頁(yè)).doc
  20. 幕墻施工組織設(shè)計(jì)方案(陶板、玻璃幕墻上海)(73頁(yè)).doc
  21. 2020東莞棠樾別墅故事線提報(bào)方案(33頁(yè)).pdf
  22. 思源房地產(chǎn)項(xiàng)目產(chǎn)品設(shè)計(jì)研發(fā)體系方案(96頁(yè)).pptx
  1. 城市主供水管及備用原水管工程管道安裝施工組織設(shè)計(jì)方案105頁(yè).doc
  2. 水泥混凝土路面工程施工方案(17頁(yè)).doc
  3. 水泥混凝土路面工程專(zhuān)項(xiàng)施工方案(17頁(yè)).doc
  4. 2023年版建筑公司30套施工方案編制指南(1041頁(yè)).pdf
  5. 建筑公司安全物資供應(yīng)單位及個(gè)人防護(hù)用品管理制度.doc
  6. 生態(tài)治理工程土石方工程及噴播植草籽施工方案(91頁(yè)).doc
  7. 2025預(yù)算員最全造價(jià)筆記包.zip
  8. 山西長(zhǎng)治長(zhǎng)豐綜合(43萬(wàn)方)項(xiàng)目(住宅+酒店+商業(yè)+辦公)建筑方案設(shè)計(jì)(246頁(yè)).pdf
  9. 2024年建筑公司機(jī)電安裝工程質(zhì)量創(chuàng)優(yōu)策劃方案(108頁(yè)).docx
  10. 商業(yè)街夜市市集U+夜市定位規(guī)劃方案(73頁(yè)).pptx
  11. 生態(tài)治理工程土石方、噴播植草(灌木)籽施工方案(89頁(yè)).doc
  12. 地下停車(chē)場(chǎng)環(huán)氧地坪漆施工方案(19頁(yè)).docx
  13. 2021房地產(chǎn)公司創(chuàng)新建筑立面設(shè)計(jì)研發(fā)手冊(cè)(50頁(yè)).pdf
  14. 學(xué)生宿舍室外市政道路工程雨水管道工程施工組織設(shè)計(jì)方案(19頁(yè)).doc
  15. 工程施工機(jī)械車(chē)輛設(shè)備租賃合同(12頁(yè)).docx
  16. 中建二局-201號(hào)辦公質(zhì)保樓項(xiàng)目檢驗(yàn)和試驗(yàn)計(jì)劃方案(45頁(yè)).doc
  17. 綜合樓中央空調(diào)安裝施工組織設(shè)計(jì)方案(水、多聯(lián)機(jī))(166頁(yè)).doc
  18. 鋼筋工程專(zhuān)項(xiàng)施工方案(46頁(yè)).doc
  19. 建筑工程造價(jià)失控的原因分析及控制(3頁(yè)).docx
  20. 住宅新中式和法式立面標(biāo)準(zhǔn)化設(shè)計(jì)產(chǎn)品研發(fā)手冊(cè)(含出入口標(biāo)準(zhǔn)化)(273頁(yè)).pdf
  21. 抹灰工程施工方案(水泥砂漿)(20頁(yè)).docx
  22. 杭州 ·長(zhǎng)嶺居別墅項(xiàng)目故事線策劃方案.pdf
  1. 風(fēng)機(jī)安裝工程施工質(zhì)量強(qiáng)制性條文執(zhí)行記錄表(40頁(yè)).doc
  2. 鐵路特大橋高墩施工專(zhuān)項(xiàng)安全施工方案(48頁(yè)).doc
  3. 服裝店鋪形象維護(hù)細(xì)則及獎(jiǎng)懲管理制度.doc
  4. 東方國(guó)際休閑廣場(chǎng)商業(yè)定位與招商提案(51頁(yè)).ppt
  5. 建筑[2009]257號(hào)關(guān)于建立建筑業(yè)企業(yè)農(nóng)民工工資保證金制度的通知【5頁(yè)】.doc
  6. 城市垃圾中轉(zhuǎn)站升級(jí)改造工程項(xiàng)目可行性研究報(bào)告129頁(yè).docx
  7. 湖州市南潯區(qū)石淙鎮(zhèn)國(guó)土空間總體規(guī)劃方案(2021-2035年)(草案公示稿)(39頁(yè)).pdf
  8. 河南省城市基礎(chǔ)設(shè)升級(jí)改造項(xiàng)目可行性研究報(bào)告(107頁(yè)).doc
  9. 城市220kV電力線路改造工程項(xiàng)目可行性研究報(bào)告94頁(yè).doc
  10. 800MW光伏40MWh儲(chǔ)能光伏示范項(xiàng)目可行性研究報(bào)告306頁(yè).pdf
  11. 2023珠海城市主干道道路升級(jí)改造工程項(xiàng)目可行性研究報(bào)告305頁(yè).pdf
  12. 2023城鎮(zhèn)老舊小區(qū)配套基礎(chǔ)設(shè)施建設(shè)項(xiàng)目可行性研究報(bào)告(163頁(yè)).pdf
  13. 城市主供水管及備用原水管工程管道安裝施工組織設(shè)計(jì)方案105頁(yè).doc
  14. 2022城市更新改造補(bǔ)短板老舊小區(qū)改造項(xiàng)目可行性研究報(bào)告(206頁(yè)).docx
  15. 2023年城鎮(zhèn)老舊小區(qū)改造及配套基礎(chǔ)設(shè)施建設(shè)項(xiàng)目可行性研究報(bào)告(84頁(yè)).pdf
  16. 2023生活區(qū)城鎮(zhèn)老舊小區(qū)改造項(xiàng)目可行性研究報(bào)告(附圖)(121頁(yè)).pdf
  17. 房產(chǎn)中介公司員工入職業(yè)務(wù)銷(xiāo)售技能培訓(xùn)資料合集.zip
  18. 縣城配電網(wǎng)110kV輸變電工程項(xiàng)目可行性研究報(bào)告266頁(yè).doc
  19. 水天苑小區(qū)地源熱泵空調(diào)系統(tǒng)設(shè)計(jì)方案(149頁(yè)).doc
  20. 2023城鎮(zhèn)老舊小區(qū)改造項(xiàng)目可行性研究報(bào)告(122頁(yè)).pdf
  21. 淮南礦業(yè)集團(tuán)棚戶(hù)區(qū)改造項(xiàng)目八公山新村、和平村室外變配電工程施工組織設(shè)計(jì)方案(92頁(yè)).doc
  22. 水泥混凝土路面工程專(zhuān)項(xiàng)施工方案(17頁(yè)).doc
主站蜘蛛池模板: 玉环县| 长乐市| 玉田县| 葵青区| 乌鲁木齐县| 吴旗县| 肥东县| 丽水市| 大兴区| 芜湖市| 河北区| 安龙县| 鲁甸县| 中牟县| 尚志市| 江山市| 宁波市| 大邑县| 富阳市| 石渠县| 商城县| 通道| 临漳县| 定日县| 平阳县| 新兴县| 栾川县| 新野县| 瑞金市| 延寿县| 精河县| 娱乐| 吉木萨尔县| 任丘市| 葵青区| 虞城县| 根河市| 呼图壁县| 司法| 长沙县| 全椒县|