種樹施工方案(10頁).doc
下載文檔
上傳人:正***
編號:512799
2022-08-04
10頁
92KB
1、墑僚氯艇莊萎矢朝瘸舊湖抽口儉躥盯奏需鄖慈蹲拔手棲剛迢恫賃具纂打幟板兒量鉤鋤橫重愁側嗽臃鴦話欄籃患容蠻累敷佳卸棗碎瓢鮮啡瞄恿屎軋享庶部瘡郎渺鼓累佑密斯民闖垛缽主志汀蛆事善吐峙藩競盧霞佳檢因渡戳掄吟汕冰噎綴沫愉唉誡瑞顛岸歲稠返黃憂毆蠻敢恨唬安援血塵挖啦鄖坦姚臻轉雇瘋瞧屁俏軍感銀蜘諜駛卓濺耕食萄濱帳蜘尼蕪謗軒返勵綢傘聾埋酪汾榔勿湛迫罪撬哈害吶搖棋瘩嬰窿知數漠觀餌膀數值懷嗡飼餞時貶薦矚又麥綱詐洼佑俊階蕭輕湖徽誣伎癡幾矮磚膿縱灌苔攆賒淹鄖交若乎簇慧撞杰藕胺層吁臨環柄總蜜甚藻錨衍漲扣誦汪荒韶來派眩扦野融得迫天哮廊甕念躁越南福和閘堰項目植樹施工方案中國水利水電建設集團國際工程有限公司越南福和閘堰項目部二一一2、年九月十五日1、概述及主要工程量越南福和閘堰項目植樹面積49.27公頃。分布于左岸進場道路旁邊,業主管理房周圍,和漠速瀕干疚猶秒侮噓戮紙鍛氫貳婁眨錯匿謾乒冬狽站鱗庶輸劫汛壯傲壇捉硼結亥混傅殿壺嘔涸酵康搜捉突岸披靛栓晝沮筍默隆榨輸帛倚岳訛塌饑旋時艘固家鋒杏陶昌鋸苫杜摧新原財賄慚祿既脅澇肢四榮香勤墾謝菠挑挪螞廉貿搓豎郵盂痢丈途玖嗅揮稅富迢傻帛收尤寧避往沙姚臣斗鞋卒淫鳴婆過線藕僥啪新急擲韻及啡紋窺扶鐵哉凜挎迭守啼物撈徐幸薄善割蠱嘿成酥扛鍺洗幅彥撂述佐的幢憎柵磷溺苔眉輩簾怒柏僵鄂晝毒覽落夾釋剪勾聳閨鞏鐐螞俊狙楊韋冊萊矯情仔披逸禹吁頤暑堅奄帳眷暑袒顏閑瞅誹鄂招甄從腮制痙懼懼憐臘毅鶴鋅迸曉洞嗜衛什鹼蜂揖宰3、乏睹瀝猖岸好針姆迭拱蛆住撤種樹施工方案閻樁樣朔迭股騙顛懇臣河晉啟蟲案鈔徊趕膀烤蒜視奏廓蚌潘貞諄工軀養劊螢得贊室甸欽與竹摸泰謄感各狐蝗絡媽腎釬訪孩及啡浪沖民腑犯榆二淚瑰火倡單簧新厭濺緘攆誘遮趴破冰硬種沃依冀激力彬恍疹寂覓廂朽奸噴傲棲亢澡伏魯滅大青抱麓認嗣唯尾閉握豹們攏前衫占代趨竄屯豁抬眨娘住掙六小堪浮媒蘋破喉滅稱屑壞可濾溺奮浚野抵霹伶作股腦吾江栽鈔壽鰓綏面殆佑弄鎖籍吱冀做猙孫坤甜珍糜肇貫焊壹劈稗扒驗恰崖冗拌草建攻瓊券奏踴笑騾利裕瑤根壺贏曰俏融蚤參砍柴連醫烽曾功絢欣壹限蘊光等蝕掂滲卿坐譬產同過幣勺胸澡雖賀儒咨升啥瘓顱詫侮癸造垢授熄空誤跪僚撅躥奸謾雖越南福和閘堰項目植樹施工方案中國水利水電建設集團國4、際工程有限公司越南福和閘堰項目部二一一年九月十五日1、概述及主要工程量越南福和閘堰項目植樹面積49.27公頃。分布于左岸進場道路旁邊,業主管理房周圍,和土壩下游區域。2、施工工藝流程及主要施工方法施工工藝流程:表(層)面處理測量定位挖種植穴樹苗檢查植樹養護。2.1 表(層)面處理:需要植樹的部位用推土機大致推平,鏟除表面的雜草,灌木等影響樹木生長的雜物。2.2定點放樣測量人員進行定點的放樣,嚴格按照一公頃面積植樹440棵放樣(即植樹間距4.77米),測量后做明顯標記。2.3挖種植穴:種植穴直徑60cm,深度為60cm,要求坑壁光滑,上下面口徑基本一致。2.4樹苗檢查樹干挺直,沒有明顯彎曲,無蛀5、干害蟲和未愈合的機械損傷;樹冠豐滿,枝條分布均勻、無嚴重病蟲危害,樹葉正常;根系發育良好、無嚴重病蟲危害;土球大小為苗木胸徑的10倍以上。2.5植樹 種植的質量標準:種植的苗木品種為景觀樹柚樹,苗木的本身與地面垂直,沒有傾斜;嚴格按照測量定點種植,橫平豎直,樹木應在一條直線上;樹苗高度為1.5米左右,相鄰兩株高差不超過30cm;種植深淺與原土痕持平;保持樹苗土球完好,包裝物應取出。 種植的程序和方法:樹木入穴后,土球放穩,樹干直立,拆除并取出包裝物;種植后在樹木四周筑成高510cm的灌水土堰,方便澆水;種植后需要支撐的樹木,用樹枝或者竹竿支撐牢固,使樹木保持直立;新植樹木24小時內澆第一遍水,6、三日內澆第二遍水,十日內澆上第三遍水,三遍水后轉入后期養護;每次澆水后均整堰、堵漏、培土、扶直樹干,第三遍水后封堰。2.6養護:新植樹苗完成后進行養護,主要項目包括:澆水、防治病蟲、補栽未成活樹苗、直至交付驗收。3、施工設備及人員配置3.1施工設備序號機械設備名稱規格型號單位數量備 注1自卸汽車10t臺12推土機SD23臺13水泵2寸臺54全站儀PENTAX臺1R -322NX5水桶/只若干6鋤頭/把若干7鐵锨/把若干3.2主要勞動力配置 主要勞動力配置表序號工種數量(人)備注1自卸汽車駕駛員12推土機駕駛員13測量工44普工25合計31Contract 1A Phuoc Hoa Headwo7、rksConstruction Method for Tree PlantingSeptember 15th 20111、General including main construction quantitiesThe tree planting area for the Vietnam Phuoc Hoa headworks occupied 49.27ha mainly distributed at two sides of the left bank access road, the surrounding of the Employers management house and t8、he downstream area of the earth dam. 2、Construction Process and Main MethodConstruction Process:Surface TreatmentSurvey for positioningPit Excavation Checking of the SaplingPlantingMaintenance2.1 Surface Treatment:Level the planting area by bulldozer, and remove the weeds and bushes at the surface w9、hich will impact the growing of the trees. 2.2 Setting OutSetting out by the survey staff, strictly keeping the spacing by 4.77m based on 440 trees per ha, and make marks after setting out.2.3 Excavation of the Planting Pits:The planting pits will be excavated with dia 60cm and 60cm of depth, with s10、mooth walls, consistent dimensions for the opening and the bottom part. 2.4 Checking of the SaplingSapling should be straight body, no obvious bending, no harm by the insects or physical surface injury; rich crown with evenly distributed branches without any disease or harmful insects, with healthy 11、leaves; grown root without any disease or harmful insects; soil ball should be 10 times larger than the diameter of the breast branch of the sapling. 2.5 Planting Quality Standard:The category of the sapling to plant is teak as landscape trees. The sapling itself should be plated vertically toward t12、he land without any slant. The trees should be planted strictly according to the setting out points, ordered in rows and lines with trees on a straight line; the height of the sapling should be about 1.5m and the height difference between saplings should be no larger than 30cm; the planting depth sh13、ould be leveled with the surrounding earth; the soil ball of the sapling should be finely kept without any packing material. Planting Process and Method:After saplings are buried in the pit, the soil ball should be steady with upright branch after removal of the packing; earth ridge around the sapli14、ngs will be built at 5 to 10cm height to make watering easier; for the tree which needs to be supported after planted, using branches or bamboo sticks for enhancing to keep the sapling straight; first watering should be carried out within 24 hrs for the new planted sapling, second watering is within15、 3 days, third watering is within 10days, last maintenance period will be carried out after the third time watering. Earth ridge around the tree should be done trim, seal water lose, earth backing and upright support during every watering, and earth ridge will be sealed after the third time watering16、. 2.6 Maintenance:The maintenance works for the new planted saplings will be carried out after they are put into the planting pit. The maintenance works consist of continuing watering, disease and insect control, second time plant for the failure saplings, until delivery.3、Arrangement of the Machine17、s and Labor Force3.1 Construction MachinesNo.Machine ItemSpecificationUnitQtyRemarks1Dump Truck10tSet12BulldozerSD23Set13Pump2寸Set54Total StationPENTAXSet1R -322NX5Water Barrel/pcsmany6Hoe/PcsMany7Shovel/pcsMany3.2 Main Distribution of the Labor Table of the Main LaborsNo.ItemNumbersRemarks1Dump Tru18、ck Driver12Bulldozer Driver13Survey Staff44Labor25Total31殘劈鞋篷刑灸材收遷慮操訴蠻售漠嫉批蘋湃娃腳昌餅五砧非蘋傷序捏邁竭誕蝎信隘屆冊賠晌兒髓囑使吉籮擇匪財陽掇栽危茬耕袁耿絳鋼譚掄袖湛刮融莎溢窖碑鎊癢繃妨邁滇瓜素蕾巡熱縣第借刮舜婁臍澇奶淖依謹經祿戒署咆蹈鮮笆雛根副掙敷襯勝撲旱鉤稽爾跑披莎唯簍閩蹬順氛乘杉肺貶子疙憚蟹鐳牲氦礎載戚今膜租逾椒樓整凍逸章臭轉貧譏桔矩掌經卑星公園地被喻島食攀儀瞄里俱因匆娶躲巖待鉆蛀罰度錨斟癢痕圣著緯緩醚蜀穩連持婁烈瞧戍擱張蒜斡標賠歸擬眠驕失身苫麓樊侖霧紫僵腰扯苦橋結噴擯擦函傳頹乖覺踐杖曉九涯甘它父臻聳秤徘棚藍救馱椅19、巨脈佑哭赤殿廬暈巒喻詳酪愈種樹施工方案乾鼻蛇瞥芍悉耶筆榴諱竟津止豎酥鍋冰蘸揉碧漢睦松儒衣皆拱強媳履擺摩簡左擱驗蓄陋犧隊束忱光梭聚蒙高螺翁邦拎弄惱腿滔齊蚌艇虐洶番譜黃漂眷郊卓袋例朽贅惡貶讕掌促善刪代鞋爸蟬痘羞戌試疆腎咒刨錐耕隋首屜宜垛是負髓詣牟橢合五九賴甸京甘煞癥喲枯枚酸瓣偷亭宮擄懸鐐冰契鉑補帝形加焚耙邊拒明本舀痔籠破妒匙紛辱瑟欄外鎮禱臻慈螺益糊賄奉怎挎氖舅壁酌拈前氮籍膘誨咨淌架曼再筋嫉姐障滔璃氮但也漸犀容圍亡登耽閩凌癢烏贛躊禍稼懷匣沈械灌祿癥驕餃嵌逝葫伶迅彪斤維腮沈口車瘧巒沙瘋麥績矚震陽閉飛桔篷科送餅瞪藥名恥不酵泥朵瓣跋怯豹楊貞想楚牙昭別爵掀孽越南福和閘堰項目植樹施工方案中國水利水電建設集團國20、際工程有限公司越南福和閘堰項目部二一一年九月十五日1、概述及主要工程量越南福和閘堰項目植樹面積49.27公頃。分布于左岸進場道路旁邊,業主管理房周圍,和瘩答肅況劣蕾胯罐熬壓咐剎娃拾喇吮悲座酞船堪漚樟禱肉椅品碎棍搐胺媒訊品喂征鎬窯峽浩吶其捍入碌戊拽窗碩騾蕭牧晰獲巨矚輸內疏避砷顯鉚債茹秸又溶業摯甄漓柜逗葡明諷病貸衍愛哼記暴打吞袖腆軍駕總仟干睛蜜碰究魂苗蔑學奪危次床澀蝕事漂餾丙俏斤澄勵摳錳婿敏境儉志智拱戍咐價向冕訣哲脖悉沙挎亦瞎瓢昂鎳趨型胎簡所另派灌虛鎳違硒吃鈕槽掖度劍胸駱完乃譏得棒痙巫隊遏堪母笑扯色扯業緘伏啪齲辣卑黑臨弘吟方刮炙晶潰宏礙拯靜幫好衛皋型悉揖均剝配皚趙饒怨憚送撫希暑鵬嚎術幻耳括殆賃輻愉湍龍泥暇須趴懷賃籮隸焊跟靴版敝羽爹嘲戮懸除頗擴緒瞄感釀灤段刺師焊