2x600MW鍋爐主要施工組織設計方案(8頁).doc
下載文檔
上傳人:正***
編號:548030
2022-08-16
8頁
130.50KB
1、海薩2x600MW鍋爐主要施工方案Hisar2600MW Boiler Main Erection Plan本期建設規模2600MW燃煤發電機組。鍋爐由提供。鍋爐為亞臨界參數、強制循環、一次中間再熱、單爐膛平衡通風、固態排渣、露天布置、全鋼構架的型汽包爐。This project is 2600MW coal fired thermal units, boiler shall be supplied by SEC. The boiler is all steel structural type drum boiler of a subcritical parameter, pump circu2、lation, single reheat, single furnace balance draft, dry slagging and hypaethral placement. 鍋爐施工方案 Boiler Erection Plan鍋爐為上海電氣集團生產的亞臨界參數、強制循環、一次中間再熱、單爐膛平衡通風、固態排渣、露天布置、全鋼構架的型汽包爐。The Boiler shall be supplied by SEC. The boiler is all steel structural type drum boiler of a subcritical parameter, pump c3、irculation, single reheat, single furnace balance draft, dry slagging and hypaethral placement.1 施工場地及主吊機械 Erection site and main hoisting equipments1.1 施工場地布置 Erection site plot鍋爐組合場布置按總平面布置圖,組合場內布置50t龍門吊各4臺,鍋爐受熱面的大部分組合工作安排在此完成。Boiler assembly yard will be arranged as per general layout drawing. Fo4、ur 50T gantry cranes will be provided respectively. Assembly of most heating surface structures will be done in this area.1.2 施工機械選擇 Selection of construction plants 根據本工程鍋爐的結構特點,以及我公司的機械狀況,選用以下機械作為鍋爐主要施工機械。Given to the features of the boier and mechanical capacity of our company, we chose plants be5、low as our main construction equipmemnts.序號Sl 機械名稱 description機械型號 mode數量quantity1圓筒吊cylindrical craneFZQ2000/80t22履帶吊crawler craneCC140013龍門吊 frame crane50t44履帶吊crawler craneCC250015勞辛格Stand-jack system200t26塔吊 tower craneC7050/20t3(1) FZQ2000/ 80T圓筒吊 FZQ2000/ 80T cylindrical craneFZQ2000圓筒吊做為附吊機械,6、筒身高度102m,采用60m臂長工況,主要負責鍋爐本體部件的吊裝工作。FZQ2000 cylindrical crane is arranged as auxiliary hoisting plants, which is designed to hoist boiler & components (crane body height 102m , length of jib 60m). (2) 250t履帶吊 250t Crawler crane CC1400/250t履帶吊為鍋爐主吊機械,采用SWSL塔式工況,后配重40t,主臂角度85度:主副臂:72m加36m;最大作業半徑42m,負荷27、7t;最小作業半徑24m時,負荷為39t。CC1400/250 Crawler cranes are designed as main boiler hoisting euqipment, adopting SWSL tower working conditions, with a banlance weight of 40t and main jib angle of 85; length of main & auxiliary jib,72+36m, max working radius 42m,load 27t;min working radius 24m,load 39t. 吊裝主要內8、容為:Main hoisting scope:a. 鍋爐鋼架吊裝。Boiler steel structure lifting. b. 鍋爐受熱面吊裝、空氣預熱器吊裝。Boiler heating surface ,airpreheater lifting.c.煙、風、煤管道安裝 Flue gas,air,coal piping erection.d. 根據現場實際換工況用于大件設備的安裝和卸車工作。 Employed in erection of other heavy equipments and unloading works.CC1400/250t履帶吊性能表(SWSL塔式、后配重409、t工況)主附臂(主臂角度85):72m+36m。CC1400/250t crawler crane performance list(SWSL TOWER type,banlance weight 40t), main & auxiliary jib,72+36m(main jib angle of 85) .幅度 scope24m26m28m30m34m38m42m負荷load39t38t38t37t34t31t27t(3)前期采用C7050/20t作為鋼結構的主要吊裝機械,后期作為電除塵的主吊機械。In prophase, C7050/20t shall be employed as ma10、in hoisting plants for structure;in anaphase shall be employed in hoisting ESP components. (4) 其它吊裝機械 Other lifting plants A四臺50t龍門吊布置于鍋爐組合場,負責設備裝卸車、受熱面膜式壁及蛇行管排的組合工作及煙風道的制作組合工作。4 frame cranes of 50t shall be arranged in Boiler structure assembly yard, employed in equipments loading and unloading, he11、ating surface and pipe coil assembly works and flue/air ducting fabricating asembly works. b. 50t汽車吊負責現場設備卸車倒運等工作。 .b. Truck crane of 50t shall be employed in equipments unloading in site.c.卷揚機布置在鍋爐0m,輔助進行爐膛內管排及小件的吊裝。c . winch shall be arranged in 0m, assisting furnace internals lifting and the lift12、ing of some samll units. d. 勞辛格負責汽包吊裝工作。Stand-jack system will be used in steam drum listing works.(5) 施工電梯布置 service lift arrangment為方便鍋爐施工,在爐一側布置一施工電梯。Sservice lifts shall be arranged in each side of the boiler. 2鍋爐本體鋼架安裝 Boiler steel structure erection鍋爐鋼結構由頂板、柱和梁、垂直支撐、水平支撐等部件組成,頂板由主梁、次梁和小梁組成一個堅固13、的梁格,其四周有水平支撐,主梁端有垂直支撐。Boiler steel structure consists of roof, column, girder, vertical and lateral supporting, while roof comprising of girder, secondary beam, trabecula and forming a firm box. 鋼架內側柱為主要承重鋼柱,外側副柱則通過梁、水平支撐與內側柱相連,以增加鋼架的整體穩定性。鋼結構從前至后共有6排。鍋爐鋼架的連接,采用高強螺栓和焊接相結合的方式,頂板和主梁與次梁之間,柱和梁之間,垂直支撐、水平14、支撐之間采用扭剪型高強螺栓連接,其余構件間采用焊接連接。Internal pillars of the structure are designed for bearing, while the external pillars are designed to reinforce the entire stability of structure by connecting with girders, lateral supporting and internal pillars. There are 6 rows. Bolt and welding are employed in the c15、onnection of structure. 2.1 吊裝方案 Hoisting plans 主吊機械選用一臺FZQ2000圓桶吊,一臺CC1400履帶吊為附吊機械,圓筒吊布置于鍋爐爐左K、L間距鍋爐本體外側柱中心線5米處,CC1400履帶吊布置于爐的另一側。鋼架各段本著由爐前至爐后、先主柱后輔柱原則分段吊裝,即安裝一段找正一段,驗收本段鋼架后對高強螺栓進行終緊。鋼架安裝過程中相應段平臺、樓梯、欄桿隨之安裝。Main hoisting plants comprise of an FZQ2000 cylindrical crane and CC1400 crawler crane (as au16、xiliary hoisting plants), the cylindrical crane shall be arranged at left side of boiller between boiler central line and it is 5 meters away from the boiler central line , CC14OO crawler shall be arranged on the other side of boiler. Each section of the structure follows the rule of from furnace fr17、ont to back, from main pillars to complement pillars. Duiring the process of structure erection, platform,stairecase and handrails should be finishsed. 在鋼架吊裝過程中,視來貨及制件完成情況,根據相應設備的安裝位置和標高,把一次風熱風道、二次風熱風道、回轉式空預器、預熱器入口煙道、省煤器出口灰斗以及燃燒器連接風道等相關設備隨之預存;各段吊裝過程中,相應主降水管和剛性梁要臨時吊掛在相應各層鋼架梁上;視圖紙具體情況緩裝爐左側及爐后7m標高下的部分拉18、條,做為爐內吊裝設備的進入通道,爐膛內影響汽包(吊裝中的初偏斜和爐頂調水平處)、板梁(爐膛內抬吊時)吊裝的桿件緩裝。During the erection of structure, according to the progress of goods supply and parts fabrication, and erection position and height , we can save some equipments in their required position and ercet later such equipments including, primary ho19、t air duct, secondary hot air duct, rotaty air preheator, preheator inlet flue gas ducting, economizer outlet ash bucket and burner connecting air duct. During each stage of erection, main downcomers and stiffening bars should be temporarily hanged in their girders of structure. As per the drawings 20、, some braces on the left side of boiler or back of boiler below the height of 7m should be erected later, so that access for the hoisting works of boiler internals are made, in addition, any parts of boiler internal shafts that affect steam drum and plate girder lifting should be erected later. 2.221、 施工順序 Construction procedure鍋爐基礎劃線標高復驗和基礎鑿毛柱底板安裝立柱1m標高線復檢結構第一段吊裝整體找正柱腳二次澆灌其它幾層結構吊裝頂板梁吊裝鋼結構完善。Boiler Foudation Lining Level Call Back And Surface Preparation Column Plate Erection Column 1m Level Callback Structure Erection Stage 1 Structure Alignment Column Foot Secondary Grouting Other Floors Lifti22、ng Roof Plate Girder Lifting Stucture Maintenance 3頂板梁吊裝方案 Roof girder hoisting plans鍋爐鋼結構第八段立柱、橫梁、拉條安裝完畢后,根據大板梁吊裝需要,部分桿件預留,經檢驗合格,才能進行板梁吊裝。After the erection of pillars of structure, beams , braces , to meet the requirement of girder hoisting, some shafts should be saved to their position and erecte23、d after passing test ,then plate beams hoisting could commence. 鍋爐頂板梁的吊裝機械為FZQ2000/80t圓筒吊和CC1400/CC2500履帶吊。FZQ2000/80t圓筒吊布置在#1、#2爐的兩側,每臺爐有一臺磨機緩裝,CC2500/CC1400履帶吊在2臺爐中間機動布置,看情況緩裝一臺磨煤機,使CC2500/CC1400滿足頂板梁吊裝工況。FZQ2000/80t cylindrical crane and CC1400/CC2500 crawler crane are employed to hoist boiler ro24、of plate girder. FZQ2000/80t cylindrical crane should be arranged in both sides of boiler #1and#2, each boiler should be arranged with one mill after later. , while CC1400 or CC2500 crawler crane should be arranged between the tow boilers ,one mill should be erected later if necessary so that CC250025、/CC1400 can meet the requirement of roof plate girder hoisting. 板梁由專用平板車運輸至爐右側0m處,利用CC1400履帶吊卸車或者兩主吊同卸,其中J、K、 L三根板梁利用FZQ2000塔吊和CC2500/CC1400共同抬吊到安裝位置。順序依次為L、K、J,其余板梁由FZQ2000塔吊或CC2500/CC1400履帶吊單獨吊裝。Plate girder should handled to 0 m in the right side of boiler by special platform lorry, CC1400crawler26、 cranes or main cranes should be used to unload. FZQ2000 tower crane and CC2500/CC1400 are used to lift J,K,L plate girder. Consequence is L,K,J, other plate girders should respectively be hoisted by FZQ2000 tower crane or CC2500/CC1400 crawler crane. 說 明 星欣設計圖庫資料專賣店擁有最新最全的設計參考圖庫資料,內容涉及景觀園林、建筑、規劃、室內裝修、建筑結構、暖通空調、給排水、電氣設計、施工組織設計等各個領域的設計素材和設計圖紙等參考學習資料。是為廣大藝術設計工作者優質設計學習參考資料。本站所售的參考資料包括設計方案和施工圖案例已達幾十萬套以上,總量在數千G以上。建筑設計施工圖紙建筑規劃設計方案及施工圖園林景觀設計施工圖紙室內裝修設計圖紙建筑結構設計方案與施工圖給排水設計方案與施工圖暖通空調設計方案與施工圖電氣設計方案與施工圖設計施工組織方案大全建筑及景觀表現PSD后期處理效果圖圖庫網址 聯系QQ:447255935電話: