午啪啪夜福利无码亚洲,亚洲欧美suv精品,欧洲尺码日本尺码专线美国,老狼影院成年女人大片

個人中心
個人中心
添加客服微信
客服
添加客服微信
添加客服微信
關(guān)注微信公眾號
公眾號
關(guān)注微信公眾號
關(guān)注微信公眾號
升級會員
升級會員
返回頂部
ConstructionStatementforPVC真空預壓發(fā)處理軟土地基施工方案樣本(14頁)
ConstructionStatementforPVC真空預壓發(fā)處理軟土地基施工方案樣本(14頁).doc
下載文檔 下載文檔
其它文檔
上傳人:正*** 編號:697984 2023-07-10 14頁 108KB

下載文檔到電腦,查找使用更方便

15 金幣

  

還剩頁未讀,繼續(xù)閱讀

1、Proposed Design Philosophy,Construction,Installation and Monitoring Method ( as per 22.1.7 of section 1.0)1. Source of borrows pit indicating the location and quantityWe have license given by Vietnam authority to exploit a quantity of 8,400,000 m3 in Nha Be river and the location is in Nhon Trach di2、strict,Dong Nai province.2. Physical proprieties of proposed fill materialThe sampling test of sand proposed to use is carried out according to AASHTO M45-89,C144-88 (see Test Result of Analyses of Sand component). The specific weight of the sand is 2.634,unit weight 1.5g/cm3,organic content 2.87% a3、nd modules 2.52.3. Proposed method of statement and monitoring devices3.1 Method statementAccording to the geotechnical report of the site,the void ratio of the soft silty clay (e) is 2.377,and the permeability coefficient (Kv) 5.5*10-7cm/s. If we adopt “wick drains and pre-loading” method to reach 4、a soil bearing capacity of 50Kpa,75Kpa,100Kpa under the sites conditions,the consolidation period would be far beyond the proposed work period. For the purpose of reducing the consolidation period of foundation soil an overload should be added,though the loading would be 7.30m high to fulfill the be5、aring capacity of 100Kpa. Obviously,this technique would bear a tremendous number of loading and unloading,which would also mean a high construction cost. The stability of side slope would also be difficult to monitor.Based on our previous experience of soft soil improvement of China coastal and Hie6、p Phuoc Power Plant in Nha Be,15km Southeast of Hochiminh City,the pre-loading method is appropriate only for general area. In process area we suggest to adopted the following method (details see drawings “Proposed Process Area Plan” and “Proposed Process Area Zone” in page 6,7):f = 50 Kpa,vacuum pr7、ecompression method;f = 75 Kpa,vacuum precompression and filling water (2.0m) on membrane method;f = 100 Kpa,vacuum precompression compound with loading method.The hydraulic filling of sea sand should be adopted under the elevation +2.80,which is specified in the tender documents. But based on our s8、ite investigation report,we propose to use sweet water sand instead of sea sand for these following reasons:(1) Fine grade and high mud content of the sea sand;(2) No local facilities available such as hydraulic filling mud absorption. The backfill material (sweet water sand) will be delivered by ba9、rges to the nearest dock and then carried by trucks to the site.3.2 Monitoring devicesAccording to the requirement of the tender documents,settlement gauge should be installed at 50mx50m grid and be measured by leveling instruments.In accordance with the requirement of the owner,the static penetrati10、on test should be carried out at the 10 specified points and the penetration instruments should be buried through the whole depth of the compressible soil layers.The compaction test of filling materials in site should be carried out with heavy compactor. 4. Design philosophy to achieve the requireme11、nt of the specification for soil improvement4.1 philosophy of vacuum precompression methodThe vacuum precompression method is used to consolidate foundation soil. This method consists in laying on the surface of foundation soil a sand bed,and in installing a drainage system with wick drains. The san12、d bed drain line is buried and connected with vacuum system to form an air exhaust and a dewatering system. A set of airtight seal membranes is laid on the surface of the sand bed with its edge buried in soil. Thus,a negative pressure area within sand bed and foundation soil can be formed from air e13、xhaust and dewaturing pumps. The vacuum method can reach a soil bearing capacity of 80KPa. Under the vacuum condition,soil is in the state of consolidating and pore water is discharged from soil under the pressure difference. The consolidation is completed when pressure of soil to be consolidated is14、 reaching the same pressure of the drainage system.The philosophy of vacuum recompression method is that under the pressure difference (Pa-Pv),soil can be consolidated;Pa indicates atmospheric pressure and Pv indicates air pressure in the sand bed and the vertical drains. In the calculation of conso15、lidation of the foundation soil,the RENDULIC-TERZAGE Theory and BICOT Theory of Consolidation can be adopted which are the same of those adopted in loading recompression method. The drop of the ground water table may also accelerate the consolidation of foundation soil beside the pressure difference16、. The effective stress in the soil increases successively during the period of consolidation of the foundation soil with vacuum recompression method. The horizontal displacement of the soil is toward the center of the consolidation area from the beginning of the period of vacuum recompression,which 17、is different from the loading recompression method. So the stability of the foundation soil will not become a problem,and the required vacuum capacity can immediately be obtained and consequently,the period of vacuum recompression can be curtailed. Details is shown in drawings “Design Philosophy for18、 Vacuum Precompression “ and “Flow Diagram of Vacuum Precompression Method” in page 8,9.Regarding the short work period of this project,the vacuum compound with loading recompression method is used in the process area where the required bearing capacity of the foundation soil is 100 Kpa. It has been19、 proved from the theoretical calculation and our previous experience that the effects of vacuum and loading recompression methods on the consolidation can be coaxed. For this purpose,a soil capacity of 150 Kpa had been obtained in one of our previous project in the turbine house of Hiep Phuoc power 20、plant located at Nha Be district in Hochiminh city. During the vacuum process and under the pressure difference (Pa Pv),the pore water permeates into the vertical drains and the consolidation occurs. On the other hand,when using pre-loading method,the air pressure raises to Pp and the consolidation 21、occurs under the pressure difference (Pp Pa). Therefore,by using the vacuum compound with pre-loading method,the pressure can be increased to (Pp PV) and the consolidation effect would be improved as a result.The process of vacuum compound with pre-loading method is shown in drawing “The Process dra22、wing of Vacuum Precompression combined with Loading Method” in page 10.4.2 Monitoring method The loading height and loading period of each step of general area is mainly controlled by the stability of the foundation soil. The settlement monitoring should be mainly concerned in this area.Because the 23、vacuum precompression method will not cause a soil stability problem,the site measurements have less significance comparable to pre-loading method. According to the requirement of the tender documents,settlement gauges should be installed at 50mx50m grid and be measured by leveling instruments. The 24、total settlement and settlement speed of the foundation in the loading area as well as the settlement or the rising height in the surrounded area must be monitored.The final settlement S can be calculated from the site monitoring data. The consolidation settlement Sc and the average consolidation ra25、tio are obtained from this value. Moreover,the b value can also be calculated as well as the average consolidation coefficient Cv.According to the requirement of the owner,the static penetration test should be carried out at the 10 specified points and the penetration instruments should be buried th26、rough the whole depth of the compressible soil layers.4.3 Preliminary geotechnical design for vertical drains and soil dischargeThe type SPB plastic drainage plate is adopted as the vertical drains in this project. The vertical drains would be distributed accordingly to an equilateral triangle patte27、rn.Based on our previous experiences of soft soil improvement in the Mekong delta area and according to the work requirements from the project,we believe that the bearing capacity of processed foundation soil can be reached. However,it is arduous to reach the same requirement for the deformation. It28、 needs a comparatively long period to attain a stable state of foundation soil settlement.In accordance with the tender document for the general area,the filling materials have to be well compacted to meet the building standard. Still,there are no relevant requirements of bearing capacity,so the ins29、erting depth of the vertical drains should be less than the thickness of the soft soil layers to avoid the occurrence of extreme settlement. In the opposite case,that would imply a large additional quantity of loading materials and a soaring construction cost.Combining vacuum technique with loading 30、method,the different requirements of bearing capacity of process area can be firmly met. Obviously,the airtight condition during vacuum precompression is a critical factor to ensure a sufficient vacuum level. The depth of vertical drains in the process area is estimated to be 10m to ensure that the 31、end of vertical drains is within the soft soil layer which is about 14m depth. This will avoid any leakage from lower sand layer.The interval of the vertical drains in general area:L = 1.20mFor process area:f =5 t/m2,L = 1.2m.f =7.5 t/m2,L = 1.1m.f =10 t/m2,L = 0.7m.The initial geotechnical design i32、s shown in two tables:“ Geotechnical Design of Vacuum Precompression Method of Process Area” and “ Geotechnical Design of Pre-loading Method of General Area” in page 11,12.5. Proposed vertical drains materialsThe SPB0-II type vertical drain is adopted from CHINA. The proprieties of the production me33、et the requirements of Chinese standard DB3201Q18-87 (details is shown below in table “Quality Standard of SPB Vertical Drains “ ).uality Standard of SPB Vertical DrainsParameterUnitTypeRemarksSPB-1SPB-2SPB-3MaterialsPlastic strip core coated with a membrane filterSectiondimensionsWidthmm1002100210034、2Thicknessmm3.54.04.5Longitudinal drain capacitym3/s15*10-625*10-6Side pressure 350KN/m2Tension strengthKN/10cm1.01.3Elongation is 100%Elongation1010Permeability coefficientcm/s5*10-45*10-4Capacity of insulating soilmm751530Elongation is 10%WetN/cm1020Elongation is 15%Linear weightg/m90-10090-100Uni35、t lengthm200200Site clearingGeotextile layingPreparation of wick drainsinserting equipmentSite office andcontrol centerVacuum pipes installWick drains insertionSecond sand beddingFirst sand beddingMembrane layingAir extracting equipmentVacuum gauge and relay installAir extraction testPrecompression 36、by air extractionVacuum pressure and settlement readingsin the process areaEquipment removal of the precompression methodRefill and levelingWeir construc-tionControl and operation centerElectrical and light circuitRecheck the vacuum pumpsTemporary water pumps installationVacuum pipe preparationMembr37、ane preparationSettlement gaugesInitial reading of settlement and relayResilience reading of ground settlementLeakage repair of membraneResults verification Flow Diagram of Vacuum Precompression MethodGeotechnical design of vacuum precompression methods of process areaProcess Area(m2)Average depth o38、f soft soil(m)Bearing Capacity of foundation soil (t/m2)Interval of vertical drains(m)Depth of vertical drains(m)CalculatedFinal consolida-tion settlement(m)Depth of vertical drains(m)CalculatedFinal consolida-tion settlement (m)Estimated Settlement(m)Depth of vertical drains(m)CalculatedFinal conso39、lida-tion settlement (m)128254 *_2528614.4151.213.42.8210.02.101.608.01.697.51.113.42.9510.02.301.808.01.90100.813.43.6010.02.692.408.02.35241428.00 *_37450.0013.3251.212.32.5910.02.101.608.01.697.51.112.32.7210.02.301.808.01.90100.812.33.3010.02.692.408.02.15354313.00 *_49603.0013.0551.0212.02.531040、.02.101.608.01.697.51.112.02.6510.02.301.808.01.90100.812.03.2310.02.692.408.02.15Note:The “ *” shows that the numerator means the proposed process area,which is extended from the area specified in the tender documents (denominator) by extending edge to 4.0 m.When f = 7.5t/m2,the settlement (1.8) is41、 calculated by using the average settlement after vacuum precompression of the main building of Hiep Phouc power plant (1.55) added settlement occurred in consolidation period (90days) which is (90* 3)mm. Geotechnical design of vacuum precompression method in process areaSchemeProcess Area(m2)Averag42、e depth of soft soil(m)Bearing Capacity of foundation soil (t/m2)Interval of vertical drains(m)Treatment Depth (m)Estimated Settlement(m)1 28254 *_2528614.4151.210.01.607.51.110.01.80100.710.02.402 41428*_3745013.3251.210.01.607.51.110.01.80100.710.02.403 54313 *_4960313.0551.210.01.607.51.110.01.8043、100.710.02.40 Note:1) “ * ” :the numerator indicates the proposed process area,which is extended from the area specified in the tender documents (denominator). The edge of the specified area is extended by 4.0 m. 2) The length of vertical drains = treatment depth + sand bed thickness ( 2.0m) + end m44、argin (0.20m) = 12.20m.Geotechnical design of pre-loading method in general areaSchemegeneral Area(m2)Average depth of soft soil(m)Interval of vertical drains(m)Single films drainageTreatment Depth (m)Estimated settlement (m)111093414.631.2010.01.029877015.221.2010.01.038861715.711.2010.01.0 Note:Th45、e length of vertical drains = treatment depth + sand bed thickness ( 2.0m) + end margin (0.20m) = 12.20m.Geotechnical design of vacuum precompression method of general areaSchemeProcess Area(m2)Average depth of soft soil(m)Interval of vertical drains(m)Double films drainageSingle films drainageDepth46、 of vertical drains(m)CalculatedFinal consolidation settlement (m)Depth of vertical drains(m)CalculatedFinal consolidation settlement (m)111093414.631.2014.601.76 / (0.5)10.0/ 8.01.30/ 1.0229877015.221.2015.202.1010.0/ 8.01.30/ 1.0238861715.711.2015.702.3110.0/ 8.01.30/ 1.02 Note:The length of vertical drains = soft soil depth + sand bed thickness ( 2.0m) + end margin (0.20m) = 12.20m.
會員尊享權(quán)益 會員尊享權(quán)益 會員尊享權(quán)益
500萬份文檔
500萬份文檔 免費下載
10萬資源包
10萬資源包 一鍵下載
4萬份資料
4萬份資料 打包下載
24小時客服
24小時客服 會員專屬
開通 VIP
升級會員
  • 周熱門排行

  • 月熱門排行

  • 季熱門排行

  1. 水泥混凝土路面工程施工方案(17頁).doc
  2. 水泥混凝土路面工程專項施工方案(17頁).doc
  3. 生態(tài)治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  4. 2024年建筑公司機電安裝工程質(zhì)量創(chuàng)優(yōu)策劃方案(108頁).docx
  5. 學生宿舍室外市政道路工程雨水管道工程施工組織設(shè)計方案(19頁).doc
  6. 醫(yī)院住院綜合大樓智能化弱電系統(tǒng)工程施工組織設(shè)計方案(151頁).doc
  7. 生態(tài)治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  8. U型渠道建設(shè)工程施工組織設(shè)計方案(52頁).doc
  9. 黑龍江省伊春市國家森林城市建設(shè)總體規(guī)劃方案(2020-2030年)(224頁).docx
  10. 10萬噸水廠城市供水工程施工方案(163頁).doc
  11. 施工現(xiàn)場文明施工制度及措施【19頁】.doc
  12. 供熱管網(wǎng)施工方案(223頁).docx
  13. 建筑工程造價失控的原因分析及控制(3頁).docx
  14. 工程施工機械車輛設(shè)備租賃合同(12頁).docx
  15. 丹陽市“十四五”新能源汽車及零部件產(chǎn)業(yè)發(fā)展規(guī)劃方案(2021-2025年)(135頁).pdf
  16. 綜合性大樓玻璃幕墻、鋁合金門窗、玻璃地彈門、金屬板幕墻、石材幕墻、雨棚、欄桿施工方案【174頁】.doc
  17. 物業(yè)公司應(yīng)急預案匯編(128頁).doc
  18. 鄉(xiāng)村道路及給水管網(wǎng)施工組織設(shè)計方案(102頁).doc
  19. 再生水廠建設(shè)運營項目EPC工程施工組織設(shè)計方案(465頁).doc
  20. 綜合醫(yī)院弱電智能化系統(tǒng)工程設(shè)計方案(173頁).doc
  21. 重慶龍湖小區(qū)業(yè)主對龍湖小區(qū)戶型設(shè)計評價定性研究報告(91頁).ppt
  22. 綠色建筑與綠色施工組織方案.pptx
  1. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  2. 服裝店鋪形象維護細則及獎懲管理制度.doc
  3. 建筑[2009]257號關(guān)于建立建筑業(yè)企業(yè)農(nóng)民工工資保證金制度的通知【5頁】.doc
  4. 水泥混凝土路面工程施工方案(17頁).doc
  5. 水泥混凝土路面工程專項施工方案(17頁).doc
  6. 2023年版建筑公司30套施工方案編制指南(1041頁).pdf
  7. 2024年建筑公司機電安裝工程質(zhì)量創(chuàng)優(yōu)策劃方案(108頁).docx
  8. 基地燃氣系統(tǒng)維修工程管道閥門安裝維護保養(yǎng)施工方案30頁.doc
  9. 生態(tài)治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  10. 商業(yè)街夜市市集U+夜市定位規(guī)劃方案(73頁).pptx
  11. 生態(tài)治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  12. 地下停車場環(huán)氧地坪漆施工方案(19頁).docx
  13. 安全生產(chǎn)管理體系及保證措施方案(59頁).doc
  14. 學生宿舍室外市政道路工程雨水管道工程施工組織設(shè)計方案(19頁).doc
  15. 工程施工機械車輛設(shè)備租賃合同(12頁).docx
  16. 中建二局-201號辦公質(zhì)保樓項目檢驗和試驗計劃方案(45頁).doc
  17. 綜合樓中央空調(diào)安裝施工組織設(shè)計方案(水、多聯(lián)機)(166頁).doc
  18. 房地產(chǎn)公司如何成為銷售明星培訓課件(21頁).pdf
  19. 建筑工程造價失控的原因分析及控制(3頁).docx
  20. 抹灰工程施工方案(水泥砂漿)(20頁).docx
  21. 新營社區(qū)城中村改造項目內(nèi)墻及頂棚乳膠漆施工方案(10頁).doc
  22. 江西九江湖口盛世中央城城市綜合體項目招商手冊(20頁).ppt
  1. 風機安裝工程施工質(zhì)量強制性條文執(zhí)行記錄表(40頁).doc
  2. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  3. 服裝店鋪形象維護細則及獎懲管理制度.doc
  4. 東方國際休閑廣場商業(yè)定位與招商提案(51頁).ppt
  5. 建筑[2009]257號關(guān)于建立建筑業(yè)企業(yè)農(nóng)民工工資保證金制度的通知【5頁】.doc
  6. 城市垃圾中轉(zhuǎn)站升級改造工程項目可行性研究報告129頁.docx
  7. 湖州市南潯區(qū)石淙鎮(zhèn)國土空間總體規(guī)劃方案(2021-2035年)(草案公示稿)(39頁).pdf
  8. 河南省城市基礎(chǔ)設(shè)升級改造項目可行性研究報告(107頁).doc
  9. 城市220kV電力線路改造工程項目可行性研究報告94頁.doc
  10. 電力公司樁基、墩基施工組織設(shè)計方案(38頁).doc
  11. 800MW光伏40MWh儲能光伏示范項目可行性研究報告306頁.pdf
  12. 2023珠海城市主干道道路升級改造工程項目可行性研究報告305頁.pdf
  13. 2023城鎮(zhèn)老舊小區(qū)配套基礎(chǔ)設(shè)施建設(shè)項目可行性研究報告(163頁).pdf
  14. 2022城市更新改造補短板老舊小區(qū)改造項目可行性研究報告(206頁).docx
  15. 2023年城鎮(zhèn)老舊小區(qū)改造及配套基礎(chǔ)設(shè)施建設(shè)項目可行性研究報告(84頁).pdf
  16. 2023生活區(qū)城鎮(zhèn)老舊小區(qū)改造項目可行性研究報告(附圖)(121頁).pdf
  17. 房產(chǎn)中介公司員工入職業(yè)務(wù)銷售技能培訓資料合集.zip
  18. 縣城配電網(wǎng)110kV輸變電工程項目可行性研究報告266頁.doc
  19. 水天苑小區(qū)地源熱泵空調(diào)系統(tǒng)設(shè)計方案(149頁).doc
  20. 2023城鎮(zhèn)老舊小區(qū)改造項目可行性研究報告(122頁).pdf
  21. 施工進度橫道圖.xls
  22. 淮南礦業(yè)集團棚戶區(qū)改造項目八公山新村、和平村室外變配電工程施工組織設(shè)計方案(92頁).doc
主站蜘蛛池模板: 宜君县| 西城区| 陆丰市| 富蕴县| 河曲县| 合阳县| 荣昌县| 连平县| 玉山县| 沂水县| 榆社县| 佳木斯市| 娄烦县| 朝阳区| 栾城县| 凯里市| 田林县| 青州市| 潜山县| 澄城县| 中超| 塔城市| 黔东| 崇义县| 修武县| 惠东县| 阿勒泰市| 尚志市| 碌曲县| 嘉定区| 咸阳市| 芷江| 鄂托克前旗| 米脂县| 搜索| 松阳县| 修武县| 塔城市| 高雄县| 车致| 桑日县|