午啪啪夜福利无码亚洲,亚洲欧美suv精品,欧洲尺码日本尺码专线美国,老狼影院成年女人大片

個人中心
個人中心
添加客服微信
客服
添加客服微信
添加客服微信
關注微信公眾號
公眾號
關注微信公眾號
關注微信公眾號
升級會員
升級會員
返回頂部
碎石基層施工方案翻譯-4月6日修改(10頁)
碎石基層施工方案翻譯-4月6日修改(10頁).doc
下載文檔 下載文檔
其它文檔
上傳人:正*** 編號:700729 2023-07-10 10頁 60.50KB

下載文檔到電腦,查找使用更方便

10 金幣

  

還剩頁未讀,繼續(xù)閱讀

1、Crushed Stone Base Construction Programme1. Purpose and Basis of the Programme1。1 Purpose: To guide the base construction in accordance with the Specification。1。2 Basis of the Programme1.2。1 Design DrawingsDWG. No.: TS001/2 TS-002/2 CS001/2CS037/2 CRS-001/2CRS070/21。2.2 SpecificationsWoretaWoldiya R2、oad Upgrading Project CONTRACT 2: Gob Gob - Gashena Bidding Documents Volume Ib Section Vi - Technical Specification:Part 1:General Specification 1205 Workmanship and Quality Control 1219 Remedial Work 3200 Placing and CompactionPart 2:Particular Specification 3407 Classification of Fill 3408 The Ca3、pping Layer 3700 Crushed Stone Base1。2.3 Other StandardsBS812: PART 1BS812: PART 3AASHTO T96AASHTO T104AASHTO T180 DAASHTO T1912。 GeneralThe WoretaWoldiya Road Upgrading Project Contract 2: Gob Gob Gashena with the initial station of 98+878。63 and terminal station of 184+800 has a total length of 854、.92137Km. The base course will be crushed stone base with a quantity of 187600m3。According to the general programme, the construction of base course will be divided into two sections to cover the part from Sta.134+300 to Sta。184+800 and Sta.134+300 to Sta.98+684 respectively。 The road-mixing method 5、and plantmixing method will be adopted for the construction.3. MaterialsThe crushed aggregate will be employed as the material for base layer and the grading will conform to the grading given in Table 3702/1。 The Aggregate Crushing Value will be no more than 25, the Loss by abrasion will not exceed 6、35%, the Loss of Sodium Sulphate Soundness will not exceed 12 and the Loss of Magnesium Sulphate Soundness will not exceed 15%.Flakiness Index: 35 Max.Liquid Limit: 20% Max.Plasticity Index: 6 Max。CBR: 80 Min。Sand equivalent: 25 Min。The material shall be plastic enough to be well compacted.Table-3707、2/1 Grading envelope crushed stoneSieve size (mm)Percentage Passing (by weight)Tolerance on target Grading (% passing by Mass)50.010037.5951002.019。060806.09。540608。04.7525402.3615-300。68226。00。0755-102。04。 Workmanship4。1 Roadmixing methodThe process for road-mixing method will be as follows:Prepara8、tion of underlying layer Setting out Transportation and placing of aggregate Watering Mixing Shaping Rolling Maintenance.Prior to the commencement of any base course construction, a trial section of not less than 1000m2 in area will be laid to demonstrate the suitable construction methodology includ9、ing suitable equipment, mixing, paving method, rolling speed and passes and inspection etc., loose thickness and suitable length for execution. 4。1。1 Preparation of underlying layer and setting outThe underlying layer (subbase) will be checked and approved complying with the quality requirement with10、 an even and sound surface and specified crown before the commencement of base construction. Then the centreline will be reinstated over the underlying layer and one peg will be installed at an interval of every 15 to 20m for straight line and every 10 to 20m for smooth curve to fix the contour line11、 of the base course. And the indicating stake will be stand on the edge of both base sides, clearly marking the position of design level and loose thickness for the base。4.1.2 Transportation and placing of aggregateThe mixing ratio of crushed stone and chips will be calculated in accordance with Tab12、le-3702/1 Grading envelope crushed stone。 The quantity of loose material will be calculated using the coefficient of loose laying (obtained from the test), compaction thickness, dry compacted density, width of base and intended placing length。 The paving area and stockpiling distance of the loading 13、material will be calculated.The aggregate will be delivered before placing by dump truck with uniform loading capacity and the unloading distance will be strict controlled over the underlying layer。The underlying layer will be watered to suitable moisture content and where the area of which is too w14、et will be dried out to required moisture then spread by grader. Where oversize materials and layer exceeding the required thickness exist, it will be removed by hand and area without aggregate will be made good with qualified materials. The deleterious material will be removed and the loose thickne15、ss will be checked to reach designed requirement. The traffic will be forbidden over loose crushed stone layer except the water truck.4.1.3 WateringThe water content will be tested on loose crushed stone layer and suitable content will be 1% more than optimum water content。 The water will be equally16、 added into the material to avoid excess moisture if the water content is not satisfactory。4。1。4 MixingOn the completion of placing, the mixing frequency will be fixed by the test and the mixing will be carried out with grader。 The aggregate will be mixed uniformly without segregation of coarse and 17、fine materials and the water content will be 1 more than optimum water content. 4。1.5 ShapingThe shaping of the work will be initially carried out by grader after mixing the aggregate uniformly。 It will be bladed more than one time, if necessary, from both sides to the center of the road for straigh18、t line section and from inside to outside of the road for smooth curve。 The surface after shaping will be rolled quickly by grader to expose the existing unflatness。 The defects and discrepancies will be scarified, remixed and leveled. Then the materials exceeding the road level will be bladed out o19、f the road by grader. The shaping work must have required slope and crown. The special care must be taken to make the joints clean and neat. In the process of shaping, the traffic and segregation of coarse and fine materials will be forbidden。 4。1。6 RollingWhere the water content of mixture after Sh20、aping arrives at the optimum water content or 1 more than optimum water content, the vibratory roller of 20T will be employed to roll full width of the surface. The rolling will be started from both shoulders to road center for straight line and smooth curve without superelevation and from inside sh21、oulder to outside shoulder for curve with superelevation. The overlap width will be one half width of the wheel when rolling. The rear wheel of the roller must exceed the joint of two adjacent sections. The suitable rolling speed will be 1。5 -1。7Km/h in the first two passes and then changed into 2。022、 2。5Km/h。 The rolling passes will be as specified in the trial section. The stabilized crushed stone surface will be maintained moisture during rolling and watered to avoid rapid evaporation。 The surface which appears as springing, loosening or scaling will be scarified, remixed or replaced with sui23、table materials to required quality. Prior to the completion of rolling, the grader will be adopted in leveling work for the purpose of required crown and superelevation。 Care must be taken to blade the material exceeding the surface level out of the road。 The defects and discrepancies in local area24、 will be left to remedy when placing the base layer。 The turning or emergent braking of roller on the completed section or rolling section will be forbidden to ensure undamaged surface。4.1.7 Areas inaccessible to mechanical equipmentThe materials on the area that cannot be reached by the equipment w25、ill be placed by hand with loose thickness of each layer not more than 100mm. The density will be tamped with the vibrating tamper to the required density.4。1.8 MaintenanceThe completed base will be watered, bladed or cleaned by water truck, broom drag and sweeper, keeping maintenance until such tim26、e as the prime coat is applied. The unprimed base course will not be open to traffic unless otherwise approved or designated by the Engineer.4。1。9 Joint treatment(a) Transverse joint treatmentThe overlapping of two sections will be mixed, shaped and compacted together. A length of 5-8m in the first 27、section left uncompacted after mixing will be mixed, shaped and rolled with the second section to design requirement。(b) Longitudinal joint treatmentThe base course will be divided into two parts from the centerline of the road for construction when the temporary road cannot be got. Therefore, the l28、ongitudinal joint will be overlapped to mix。 The side of first part with a width of 300mm will be overlapped with the second part for mixing, shaping and rolling to design requirement。 4.2 Plant-mixing methodThe process for plantmixing method will be as follows:Preparation of underlying layer Settin29、g out Transportation and placing of aggregate Rolling Maintenance。Prior to the commencement of any base course construction, a trial section of not less than 1000m2 in area will be laid to demonstrate the suitable construction methodology including suitable equipment, mixing, paving method, rolling 30、speed and passes and inspection etc。, loose thickness and suitable length for execution. 4.2。1 Preparation of underlying layer and setting outThe underlying layer (subbase) will be checked and approved complying with the quality requirement with an even and sound surface and specified crown before t31、he commencement of base construction. Then the centreline will be reinstated over the underlying layer and one peg will be installed at an interval of every 15 to 20m for straight line and every 10 to 20m for smooth curve to fix the contour line of the base course. And the indicating stake will be s32、tand on the edge of both base sides, clearly marking the position of design level and loose thickness for the base。4。2.2 Transportation and placing of aggregateThe aggregate will be watered by sprinkling using water tank and mixed uniformly by loader in stock pile then delivered to construction site33、 by dump truck. The spreader will be employed to carry out spreading work as per specified crown, width and thickness。The segregation of fine and coarse materials will be eliminated by appointed persons。 The accumulation of coarse material will be treated with fine material to mix uniformly and even34、ly. On the contrary, the fine material will be treated using coarse material.4.2.3 RollingWhere the water content of mixture after paving with spreader arrives at the optimum water content or more than optimum water content, the vibratory roller of 20T will be employed to roll full width of the surf35、ace. The rolling will be started from both shoulders to road center for straight line and smooth curve without superelevation and from inside shoulder to outside shoulder for curve with superelevation。 The overlap width will be one half width of the wheel when rolling。 The rear wheel of the roller m36、ust exceed the joint of two adjacent sections。 The suitable rolling speed will be 1。5 1。7Km/h in the first two passes and then changed into 2.0 2.5Km/h. The number of rolling passes will be as specified in the trial section。 4.2。4 Areas inaccessible to mechanical equipmentThe materials on the area t37、hat cannot be reached by the equipment will be placed by hand with loose thickness of each layer not more than 100mm. The density will be tamped with the vibrating tamper to 95 of required AASHTO T180 density.4。2.5 MaintenanceThe completed base will be watered, bladed or cleaned, keeping maintenance38、 until such time as the prime coat is applied。 The damaged base part caused by the opening of the road to traffic will be scarified and restored. 4。2.6 Joint treatment4.2。6.1 Joint treatment in the same layer(a) Transverse joint treatmentThe mixture near the spreader left uncompacted will be rolled 39、and compacted with the mixture paved in the following day. Special attention will be paid to the water content of the mixture. The water if necessary will be added into the mixture to specified requirements。(b) Longitudinal joint treatmentThe half width construction method will be employed in this P40、roject when the detour road cannot be constructed。 Therefore, the longitudinal joint will be joined vertically。 When the construction of the first half width starts, the wooden form or steel form will be made as bracing for the side near the other half width. The height of the forms will be the same41、 as the compacted thickness of the mixture. And the forms will be removed prior to the construction of second half width。 Alternatively, a slope will be formed in the area of 30cm near the uncompacted boundary when the forms are not applied to the first half width construction。 Therefore, prior to t42、he construction of the other half width, the uncompacted area and the portion doesnt meet the crown requirements will be scarified and watered and then leveled and rolled with the placed mixture.4.2.6.2 Joint treatment in different layersThe overlap for the transverse joint and longitudinal joint of43、 the first layer and second layer will be stagger.4。3 Quality ControlThe field density, plasticity index, liquid limit and grading of materials, ACV, LAA, Soundness and Flakiness index will be checked complying with the testing frequency specified in Clause 3705(a) for the purpose of process control44、。 The construction tolerance of surface level, thickness, width and cross section for base course will be checked for approval。5. Manpower ArrangementThe construction management staff will be qualified engineers, safety staff, dispatcher and statistician etc。.The construction operation staff will be45、 as follows:NoType of WorkQuantityWork ScopeRequirement1Engineer2Construction technical guidance, supervision and quality controlProfessional technology and skill2Foreman4Construction organization and management on SiteAbility of management3Operator16Equipment operation like truck, excavator, spread46、er and grader etc.Skilled worker4Others10To assist foremanUnskilled worker5Interpreter1To overcome language problemFluent in Engineering English6. Construction Equipment ArrangementMain construction equipmentNo。DescriptionSpecification and TypeUnitQuantity1Water truck10t SGZ5141 GSSset22GraderMG530set23SpreaderWTS75set14Steel wheel roller20t SD-200DXset25Rammerset26Loader3m3 CAT 950Hset27Dump truck15t FV517JD1LB9Bset6
會員尊享權益 會員尊享權益 會員尊享權益
500萬份文檔
500萬份文檔 免費下載
10萬資源包
10萬資源包 一鍵下載
4萬份資料
4萬份資料 打包下載
24小時客服
24小時客服 會員專屬
開通 VIP
升級會員
  • 周熱門排行

  • 月熱門排行

  • 季熱門排行

  1. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  2. 山西長治長豐綜合(43萬方)項目(住宅+酒店+商業(yè)+辦公)建筑方案設計(246頁).pdf
  3. 2025預算員最全造價筆記包.zip
  4. 貴陽南明區(qū)地塊項目(住宅、商業(yè)+辦公+學校)建筑方案設計(311頁).pdf
  5. 西安金輝世界城J地塊綜合體項目建筑設計方案(318頁).pdf
  6. 西安·綠地中心B座幕墻工程超高層單元式幕墻施工組織設計方案(223頁).pdf
  7. 蔬菜大棚鋼結構施工組織設計方案(65頁).pdf
  8. 全輕混凝土地坪施工方案.doc
  9. 邊坡治理工程錨索錨桿格構梁施工技術交底.doc
  10. 陳列布展廳建設工程電氣安裝展廳電子及裝飾裝修安全施工方案46頁.doc
  11. 大酒店公共區(qū)域及客房區(qū)域室內裝修改造工程墻面軟包施工組織設計86頁.doc
  12. 蔬菜大棚土建、鋼結構工程施工組織設計方案(66頁).doc
  13. 雨、污水管道工程PVC—U雙壁波紋管施工方案(37頁).doc
  14. 熱電聯(lián)產機組工程排水槽廢水池防腐施工安全專項方案(12頁).doc
  15. 水利水電工程單元工程施工質量驗收評定表.doc
  16. 秦皇島市北環(huán)路道路改造工程監(jiān)理大綱(346頁).PDF
  17. 江蘇會展中心幕墻施工組織設計方案,玻璃幕墻,鋁板幕墻(230頁).doc
  18. 幼兒園建設工程項目可行性研究報告(486頁).doc
  19. 幕墻施工組織設計方案(陶板、玻璃幕墻上海)(73頁).doc
  20. 物業(yè)公司如何提高業(yè)主滿意度、提升服務質量演講課件.pptx
  21. 2020江山悅地產項目故事線構建推廣方案.pdf
  22. 建筑大理石、花崗石干掛施工工藝(5頁).doc
  1. 服裝店鋪形象維護細則及獎懲管理制度.doc
  2. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  3. 水泥混凝土路面工程施工方案(17頁).doc
  4. 水泥混凝土路面工程專項施工方案(17頁).doc
  5. 2023年版建筑公司30套施工方案編制指南(1041頁).pdf
  6. 生態(tài)治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  7. 山西長治長豐綜合(43萬方)項目(住宅+酒店+商業(yè)+辦公)建筑方案設計(246頁).pdf
  8. 2024年建筑公司機電安裝工程質量創(chuàng)優(yōu)策劃方案(108頁).docx
  9. 商業(yè)街夜市市集U+夜市定位規(guī)劃方案(73頁).pptx
  10. 生態(tài)治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  11. 地下停車場環(huán)氧地坪漆施工方案(19頁).docx
  12. 學生宿舍室外市政道路工程雨水管道工程施工組織設計方案(19頁).doc
  13. 工程施工機械車輛設備租賃合同(12頁).docx
  14. 中建二局-201號辦公質保樓項目檢驗和試驗計劃方案(45頁).doc
  15. 土建、安裝、裝飾工程施工檢測試驗計劃表.docx
  16. 安全生產管理體系及保證措施方案(59頁).doc
  17. 西安·綠地中心B座幕墻工程超高層單元式幕墻施工組織設計方案(223頁).pdf
  18. 蔬菜大棚鋼結構施工組織設計方案(65頁).pdf
  19. 冷卻水塔管道更換安裝施工方案(41頁).doc
  20. 綜合樓中央空調安裝施工組織設計方案(水、多聯(lián)機)(166頁).doc
  21. 建筑工程造價失控的原因分析及控制(3頁).docx
  22. 抹灰工程施工方案(水泥砂漿)(20頁).docx
  1. 風機安裝工程施工質量強制性條文執(zhí)行記錄表(40頁).doc
  2. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  3. 服裝店鋪形象維護細則及獎懲管理制度.doc
  4. 東方國際休閑廣場商業(yè)定位與招商提案(51頁).ppt
  5. 建筑[2009]257號關于建立建筑業(yè)企業(yè)農民工工資保證金制度的通知【5頁】.doc
  6. 城市垃圾中轉站升級改造工程項目可行性研究報告129頁.docx
  7. 湖州市南潯區(qū)石淙鎮(zhèn)國土空間總體規(guī)劃方案(2021-2035年)(草案公示稿)(39頁).pdf
  8. 河南省城市基礎設升級改造項目可行性研究報告(107頁).doc
  9. 城市220kV電力線路改造工程項目可行性研究報告94頁.doc
  10. 電力公司樁基、墩基施工組織設計方案(38頁).doc
  11. 800MW光伏40MWh儲能光伏示范項目可行性研究報告306頁.pdf
  12. 2023珠海城市主干道道路升級改造工程項目可行性研究報告305頁.pdf
  13. 2023城鎮(zhèn)老舊小區(qū)配套基礎設施建設項目可行性研究報告(163頁).pdf
  14. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  15. 2022城市更新改造補短板老舊小區(qū)改造項目可行性研究報告(206頁).docx
  16. 2023年城鎮(zhèn)老舊小區(qū)改造及配套基礎設施建設項目可行性研究報告(84頁).pdf
  17. 2023生活區(qū)城鎮(zhèn)老舊小區(qū)改造項目可行性研究報告(附圖)(121頁).pdf
  18. 房產中介公司員工入職業(yè)務銷售技能培訓資料合集.zip
  19. 縣城配電網110kV輸變電工程項目可行性研究報告266頁.doc
  20. 水天苑小區(qū)地源熱泵空調系統(tǒng)設計方案(149頁).doc
  21. 2023城鎮(zhèn)老舊小區(qū)改造項目可行性研究報告(122頁).pdf
  22. 淮南礦業(yè)集團棚戶區(qū)改造項目八公山新村、和平村室外變配電工程施工組織設計方案(92頁).doc
主站蜘蛛池模板: 桐城市| 嘉义市| 习水县| 财经| 铁岭市| 滦南县| 罗定市| 永吉县| 福安市| 老河口市| 亳州市| 松溪县| 江达县| 墨脱县| 荣昌县| 新丰县| 红安县| 乳山市| 茂名市| 中山市| 民县| 井陉县| 元江| 岗巴县| 台江县| 龙山县| 南安市| 阜城县| 民勤县| 张北县| 韩城市| 随州市| 长岭县| 姜堰市| 新沂市| 张北县| 保定市| 赣州市| 白河县| 二连浩特市| 阿克陶县|