午啪啪夜福利无码亚洲,亚洲欧美suv精品,欧洲尺码日本尺码专线美国,老狼影院成年女人大片

個人中心
個人中心
添加客服微信
客服
添加客服微信
添加客服微信
關注微信公眾號
公眾號
關注微信公眾號
關注微信公眾號
升級會員
升級會員
返回頂部
洗桶房鋁扣板吊頂施工方案
洗桶房鋁扣板吊頂施工方案.doc
下載文檔 下載文檔
其它文檔
上傳人:正*** 編號:889474 2024-01-22 6頁 344.54KB

下載文檔到電腦,查找使用更方便

10 金幣

  

還剩頁未讀,繼續閱讀

1、videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables for three years to resolve outstanding issues, obviously worked, victory of the year. The Countys departments at all levels must firmly establish the guanghui is gold 2、and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A)3、 lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, t4、he County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure the E5、limination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water 6、source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Do7、mestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural dom8、estic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud9、, as the deepening water of this years plays. Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out 10、mud way out, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intens11、ity ofP&G XQ plant PCC Room project 【安全施工方案】編制:陳玉龍審核:陳忠慶批準:李家慶中建華恒(天津)設備安裝工程有限公司2014年12月14日為了促進本公司各項經營活動由事后管理向事前管理方式的轉變,強化生產經營全過程控制,提高資金使用的計劃性,特制定本管理辦法,以增加公司資金運行的透明度treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution ind12、ustry regulation three years action plans, requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard r13、egulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy co14、nsumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project Trinity environment access system, promoting indus15、try access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservatio16、n, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution instal17、lations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood con18、trol drainage engineering construction, vigorously implementation strong library solid di spread row engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood con19、trol drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair20、, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play three to split battle. Xia Baolong, Secretary of provincial party Committee stressed that while the three to split operatio21、n time is over three years, but three to split must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and no unauthorised created第 1 頁第 3 頁 共 6 頁P&G XQ plant PCC Room project 【鋁扣板施工方案】鋁扣板吊頂工程工程概況:本工程位于GSS room首層洗桶房,施工面積10,采用歐陸牌600600鋁扣板吊頂,飛利浦牌22、燈具。一、施工準備(一) 作業條件1 安裝完頂棚內的各種管線及設備,確定好燈位、通風口及各種照明孔口的位置。2 頂棚罩面板安裝前,應作完墻、地濕作業工程項目。3 搭好頂棚施工操作平臺架子、護欄。4 輕鋼骨架頂棚在大面積施工前,應做樣板間,對頂棚的起拱度、燈槽、窗簾盒、通風口進行構造處理,經鑒定后再大面積施工。(二) 材料準備鋁合金方板板材、龍骨、吊桿、燈具等。(三) 施工機具沖擊鉆、無齒鋸、鋼鋸、射釘槍、刨子、螺絲刀、吊線錐、角尺、錘子、水平尺、白線、墨斗等二、 質量要求(一) 暗龍骨吊頂工程質量要求符合建筑裝飾裝修工程質量驗收規范(GB2001)的規定。表21檢查項目允許偏差或允許值主控項目23、1標高、尺寸、起拱、造型第6.2。2條2飾面材料第6。2.3條3吊桿、龍骨、飾面材料安裝第6。2.4條4吊桿、龍骨材質、間距及連接方式第6.2.5條5石膏板接縫第6。2.6條一般項目1材料表面質量第6.2。7條2燈具等設備第6.2.8條3龍骨、吊桿接縫第6.2。9條4填充材料第6。2.10條5允許 偏差 (mm)表面平整度2;接縫直線度1。5;接縫高低差1三、工藝流程 基層彈線安裝吊桿安裝主龍骨安裝邊龍骨安裝次龍骨安裝鋁合金方板飾面清理分項、檢驗批驗收四、施工工藝1彈線:根據樓層標高水平線,按照設計標高,沿墻四周彈頂棚標高水平線,并找出房間中心點,并沿頂棚的標高水平線,以房間中心點為中心在墻上24、畫好龍骨分檔位置線。(示意圖)2安裝主龍骨吊桿:在彈好頂棚標高水平線及龍骨位置線后,確定吊桿下端頭的標高,安裝預先加工好的吊桿,吊桿安裝用帕膨脹螺栓固定在頂棚上。吊桿選用帕圓鋼,吊筋間距控制在1200mm范圍內。3安裝主龍骨:主龍骨一般選用C38輕鋼龍骨,間距控制在1200mm范圍內。安裝時采用與主龍骨配套的吊件與吊桿連接。4安裝邊龍骨:按天花凈高要求在墻四周用水泥釘固定2525mm烤漆龍骨,水泥釘問距不大于300mm。5安裝次龍骨:根據鋁扣板的規格尺寸,安裝與板配套的次龍骨,次龍骨通過吊掛件吊掛在主龍骨上。當次龍骨長度需多根延續接長時,用次龍骨連接件,在吊掛次龍骨的同時,將相對端頭相連接,并25、先調直后固定。6安裝金屬板:鋁扣板安裝時在裝配面積的中間位置垂直次龍骨方向拉一條基準線,對齊基準線向兩邊安裝.安裝時,輕拿輕放,必須順著翻邊部位順序將方板兩邊輕壓,卡進龍骨后再推緊.7清理:鋁扣板安裝完后,需用布把板面全部擦拭干凈,不得有污物及手印等。8吊頂工程驗收時應檢查下列文件和記錄:吊頂工程的施工圖、設計說明及其他設計文件;材料的產品合格證書、性能檢測報告、進場驗收記錄和復驗報告;隱蔽工程驗收記錄;施工記錄。五、成品保護 1輕鋼骨架、罩面板及其他吊頂材料在入場存放、使用過程中應嚴格管理,保證不變形、不受潮、不生銹。 2裝修吊頂用吊桿嚴禁挪做機電管道、線路吊掛用;機電管道、線路如與吊頂吊桿位置矛盾,須經過項目技術人員同意后更改,不得隨意改變、挪動吊桿。 3吊頂龍骨上禁止鋪設機電管道、線路。 4輕鋼骨架及罩面板安裝應注意保護頂棚內各種管線,輕鋼骨架的吊桿、龍骨不準固定在通風管道及其他設備件上。 5為了保護成品,罩面板安裝必須在棚內管道試水、保溫等一切工序全部驗收后進行。6設專人負責成品保護工作,發現有保護設施損壞的,要及時恢復。7工序交接全部采用書面形式由雙方簽字認可,由下道工序作業人員和成品保護負責人同時簽字確認,并保存工序交接書面材料,下道工序作業人員對防止成品的污染、損壞或丟失負直接責任,成品保護專人對成品保護負監督、檢查責任。第 3 頁
會員尊享權益 會員尊享權益 會員尊享權益
500萬份文檔
500萬份文檔 免費下載
10萬資源包
10萬資源包 一鍵下載
4萬份資料
4萬份資料 打包下載
24小時客服
24小時客服 會員專屬
開通 VIP
升級會員
  • 周熱門排行

  • 月熱門排行

  • 季熱門排行

  1. 田螺山河姆渡文化遺址生活館室內設計方案(247頁).pdf
  2. 建筑鋼筋平法培訓課件.ppt
  3. 2023東城街城鄉結合示范帶建設項目可行性研究報告(248頁).pdf
  4. 工業廠房及附屬設施綜合樓輪扣式高支模腳手架專項施工方案(60頁).docx
  5. 再生水廠配套管網工程項目有限空間作業事故應急救援預案.doc
  6. 天然氣管道保護工程專項施工方案(36頁).docx
  7. 智慧城市項目可行性研究報告(257頁).doc
  8. 華為公司干部任職資格管理制度.doc
  9. 沁源綠化園林工程公司ISO質量手冊和程序文件匯編65頁.doc
  10. 科學技術新館鋼結構工程桁架制作及桁架預拼裝施工方案44頁.doc
  11. 2023城市水廠工藝升級改造工程可行性研究報告108頁.pdf
  12. 嘉善縣陶莊鎮國土空間總體規劃方案(2021-2035年)(草案公示)(58頁).pdf
  13. 五星級酒店室內裝修改造工程施工組織設計方案(187頁).doc
  14. 雙遼電廠一期配電室基礎及上部結構施工方案(24頁).doc
  15. 排水溝清淤施工方案(25頁).pdf
  16. 張家港華芳高層住宅開發項目可行性研究報告(77頁).pdf
  17. 中建瀛園山藝小區磚混結構施工組織設計方案(83頁).doc
  18. 土建、裝飾、維修改造等零星工程施工組織設計方案(187頁).doc
  19. 小學操場塑膠跑道和人造草坪施工組織設計方案(207頁).docx
  20. 盱眙垃圾焚燒發電廠鋼結構工程500T吊車鋼結構吊裝專項施工方案(40頁).doc
  21. 辦公樓無線網絡WiFi方案【28頁】.doc
  22. 裝修裝飾公司建筑裝修合同范本(3頁).doc
  1. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  2. 田螺山河姆渡文化遺址生活館室內設計方案(247頁).pdf
  3. 建筑工程公司資料員取證培訓課件(307頁).ppt
  4. 水泥混凝土路面工程施工方案(17頁).doc
  5. 水泥混凝土路面工程專項施工方案(17頁).doc
  6. 建筑公司安全物資供應單位及個人防護用品管理制度.doc
  7. 生態治理工程土石方工程及噴播植草籽施工方案(91頁).doc
  8. 建筑鋼筋平法培訓課件.ppt
  9. 2025預算員最全造價筆記包.zip
  10. 山西長治長豐綜合(43萬方)項目(住宅+酒店+商業+辦公)建筑方案設計(246頁).pdf
  11. 施工企業安全技術交底范本大全(361頁).pdf
  12. 2024年建筑公司機電安裝工程質量創優策劃方案(108頁).docx
  13. 2023東城街城鄉結合示范帶建設項目可行性研究報告(248頁).pdf
  14. 生態治理工程土石方、噴播植草(灌木)籽施工方案(89頁).doc
  15. 工業廠房及附屬設施綜合樓輪扣式高支模腳手架專項施工方案(60頁).docx
  16. 2021房地產公司創新建筑立面設計研發手冊(50頁).pdf
  17. 學生宿舍室外市政道路工程雨水管道工程施工組織設計方案(19頁).doc
  18. 住宅新中式和法式立面標準化設計產品研發手冊(含出入口標準化)(273頁).pdf
  19. 智慧城市項目可行性研究報告(257頁).doc
  20. 土建、裝飾、維修改造等零星工程施工組織設計方案(187頁).doc
  21. 杭州 ·長嶺居別墅項目故事線策劃方案.pdf
  22. 住宅樓施工組織設計書(137頁).doc
  1. 風機安裝工程施工質量強制性條文執行記錄表(40頁).doc
  2. 鐵路特大橋高墩施工專項安全施工方案(48頁).doc
  3. 服裝店鋪形象維護細則及獎懲管理制度.doc
  4. 東方國際休閑廣場商業定位與招商提案(51頁).ppt
  5. 建筑[2009]257號關于建立建筑業企業農民工工資保證金制度的通知【5頁】.doc
  6. 城市垃圾中轉站升級改造工程項目可行性研究報告129頁.docx
  7. 湖州市南潯區石淙鎮國土空間總體規劃方案(2021-2035年)(草案公示稿)(39頁).pdf
  8. 河南省城市基礎設升級改造項目可行性研究報告(107頁).doc
  9. 城市220kV電力線路改造工程項目可行性研究報告94頁.doc
  10. 800MW光伏40MWh儲能光伏示范項目可行性研究報告306頁.pdf
  11. 2023珠海城市主干道道路升級改造工程項目可行性研究報告305頁.pdf
  12. 2023城鎮老舊小區配套基礎設施建設項目可行性研究報告(163頁).pdf
  13. 城市主供水管及備用原水管工程管道安裝施工組織設計方案105頁.doc
  14. 2022城市更新改造補短板老舊小區改造項目可行性研究報告(206頁).docx
  15. 2023年城鎮老舊小區改造及配套基礎設施建設項目可行性研究報告(84頁).pdf
  16. 2023生活區城鎮老舊小區改造項目可行性研究報告(附圖)(121頁).pdf
  17. 縣城配電網110kV輸變電工程項目可行性研究報告266頁.doc
  18. 水天苑小區地源熱泵空調系統設計方案(149頁).doc
  19. 2023城鎮老舊小區改造項目可行性研究報告(122頁).pdf
  20. 田螺山河姆渡文化遺址生活館室內設計方案(247頁).pdf
  21. 淮南礦業集團棚戶區改造項目八公山新村、和平村室外變配電工程施工組織設計方案(92頁).doc
  22. 建筑工程公司資料員取證培訓課件(307頁).ppt
主站蜘蛛池模板: 茂名市| 汉寿县| 丰顺县| 镇江市| 金坛市| 萨嘎县| 罗江县| 武宁县| 永济市| 江川县| 讷河市| 钟山县| 华亭县| 临西县| 青岛市| 城口县| 普定县| 旅游| 隆化县| 登封市| 古田县| 眉山市| 广平县| 青浦区| 宝应县| 曲阳县| 凉城县| 玉田县| 巴里| 安吉县| 济南市| 通化县| 长丰县| 车险| 天祝| 通辽市| 新和县| 曲松县| 略阳县| 罗江县| 周宁县|