100萬噸年乙烯項目主廠區場地區吹砂回填總承包工程施工組織設計方案(112頁).docx
-
資源ID:259996
資源大小:1.38MB
全文頁數:110頁
-
資源格式:
DOCX
下載積分:
35金幣
下載報告請您先登錄!
驗證碼下載
賬號登錄下載
微信登錄下載
友情提示
2、PDF文件下載后,可能會被瀏覽器默認打開,此種情況可以點擊瀏覽器菜單,保存網頁到桌面,就可以正常下載了。
3、本站不支持迅雷下載,請使用電腦自帶的IE瀏覽器,或者360瀏覽器、谷歌瀏覽器下載即可。
4、本站資源下載后的文檔和圖紙-無水印,預覽文檔經過壓縮,下載后原文更清晰。
5、試題試卷類文檔,如果標題沒有明確說明有答案則都視為沒有答案,請知曉。
|
100萬噸年乙烯項目主廠區場地區吹砂回填總承包工程施工組織設計方案(112頁).docx
1、Firstcompliance review of the application of the appraisal Committee, only thr4.1 application ofthe Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select f
2、ile asked to provide appropriate documentation. 4.3 proxy application shall affixits official seal coding and page by page in the specified location. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be ex
3、actly the same. 4.4 application there shall be no loose pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures forthe management of tendering agents service charges (meterprices 20021980) rules of the Nineth, tender agent service charges using the