午啪啪夜福利无码亚洲,亚洲欧美suv精品,欧洲尺码日本尺码专线美国,老狼影院成年女人大片

個人中心
個人中心
添加客服微信
客服
添加客服微信
添加客服微信
關注微信公眾號
公眾號
關注微信公眾號
關注微信公眾號
升級會員
升級會員
返回頂部
ImageVerifierCode 換一換

收費島施工方案Constructionschemefortollisland(9頁).doc

  • 資源ID:477774       資源大小:33.50KB        全文頁數:9頁
  • 資源格式:  DOC         下載積分: 10金幣
下載報告請您先登錄!


友情提示
2、PDF文件下載后,可能會被瀏覽器默認打開,此種情況可以點擊瀏覽器菜單,保存網頁到桌面,就可以正常下載了。
3、本站不支持迅雷下載,請使用電腦自帶的IE瀏覽器,或者360瀏覽器、谷歌瀏覽器下載即可。
4、本站資源下載后的文檔和圖紙-無水印,預覽文檔經過壓縮,下載后原文更清晰。
5、試題試卷類文檔,如果標題沒有明確說明有答案則都視為沒有答案,請知曉。

收費島施工方案Constructionschemefortollisland(9頁).doc

1、收費島施工方案(Construction scheme for toll island)The construction organization design scheme (2007-01-24 17:03:06) has been reproduced in the highway toll collection stationHighway plan recharging renovation worksConstruction organization design1. Quality control before constructionIs mainly refers to th

2、e construction preparation stage before construction, we mainly grasp the following several aspects: open clarificaiton will design units, supervision units, construction units, mechanical and electrical contractor, weighing equipment suppliers to attend the meeting, interpretation of the meter weig

3、ht principle, make construction personnel understand weight charge equipment on the island of lane toll plaza, charge, charge.The construction unit to evaluate compound Examining construction units of recent performance, engineering command system, engineering quality level, the number of the worker

4、s and technicians, check whether the key type of work has the mount guard qualification certificate, instrument and meter is national metrology inspection certificate of quality supervision department, understand the state of machinery, vehicles, equipment equipped with can meet the construction req

5、uirements, etc.To review and inspect the quality assurance system, quality site management measures, project schedule and safety protection measures for the construction organization.Audit equipment and order the construction unit of the specifications of the equipment procurement contract, model, t

6、echnical indicators should be carefully checked whether conform to the requirements of the provisions of the contract, the main material before entering the construction site for information about the test and certificate of quality inspection.The construction site investigation of communication pip

7、elines have been completed, power line, people (hand) hole based, transformer room, computer room, and so on carries on the detailed investigation, review construction design drawings is complete and correct.2. Quality control of construction process2-1 in the construction supervision project, the s

8、upervision office will start from the organizational leadership, scientific management, update supervision philosophy and bold innovation, so that the quality, safety and environmental protection of the project will be strictly controlled.The inspection and inspection of strict procedures shall be c

9、arried out in accordance with the design standards and process requirements, and the quality acceptance standards of the construction procedure shall be prepared for the critical process. This time we process the acceptance variable construction units according to the project construction process to

10、 apply for inspection to active inspection, in accordance with the construction process quality inspection earnestly, to meet the requirements of the quality of the scene to sign to recognize, is not in conformity with the quality requirements in a timely manner, construction units rectification req

11、uired. Failure to enter the next procedure is not acceptable. Great extent eliminates the active supervision engineering quality hidden danger and accident, and also a one-time qualified for completed process inspection and sign recognition in time, make the project smoothly under the process of con

12、struction, control the quality and speed up the construction schedule.Build system of model project key disciplines engineering or process, to select a heavy toll lane, a toll station as a model project for demonstration, through summarizing, construction unit put forward the construction technology

13、 standard of specification, with the approval of the owner, supervision after all. Each process of this project was first conducted in ninglian high-speed huaian mainline toll booth, and summarized the experience. It was a good result to organize the visit and study.Adhere to the supervision enginee

14、r of the sidelines, according to the work order of the construction unit, the general procedure will not leak the prison,Key position key supervision. If the weight equipment foundation pit size is strictly according to the manufacturers drawings, the concrete marking and curing time of the water sh

15、all be satisfied.2-2-2 this project should improve the precision of weighing equipment and the stability of the charging system, and form the following points in the process of quality supervision.2-2-1 control the speedSpeed is directly related to the precision of weighing equipment. By measuring i

16、nstrument for testing, to test the vehicle static weighing equipment accuracy is above 99%, and the speed of 5 km/h when weighing equipment precision reaches 95%, and when the speed is greater than 5 km/h when weighing equipment precision would be badly affected. Measures are as follows: in the high

17、way exit, before weighing about 500 meters, set up the logo vehicle deceleration within 5 km/h, not to accelerate, decelerate and slamming on the brakes, to ensure the accuracy of weighing system measurement, reducing the possibility of dispute; Set the deceleration line and decelerate block, and wh

18、en installing the deceleration block, it should be noted that when the vehicle passes the deceleration block, it will also hit the brake symmetric platform to impact the precision (variable speed) when passing the weighing platform. Normally not less than 18 meters in front of the weighing equipment

19、.It is recommended to display the speed on the lane control display (according to the current interface provided by the weighing device). In this way, the toll collector can report the speed of the vehicle on the basis of the actual situation, and it is very convincing to some drivers who want to ta

20、ke advantage of it.2 2-2-2 civil engineering requirementsTo ensure that the test is completed before the vehicles arrive at the toll booths, the length of the charging island should be extended appropriately, and the speed control of the driver through the platform shall be considered for the conven

21、ience of the pilot. Rebuilt charging island: demolition reconstruction island head tail (island), within the scope of cutting excavation toll plaza concrete pavement, the construction of the island itself lengthening period and the new island head tail (island), and adjust the affected by the altera

22、tion of equipment is designed according to the new arrangement and set up new equipment foundation; New entrance unidirectional charge island: the entrance unidirectional charge island has fog lamps, manual railings, lane cameras, traffic lights, automatic railings; New export one-way charge island:

23、 export fog lamps on the island of one-way charge hand hole, hand railings, heavy equipment, control box, raster vehicle lane separator, weighing display, traffic signal, camera, the traffic signal lamp, automatic rail; The toll island and toll booth foundation: the charging island and the toll boot

24、h foundation are horizontal in the cross-section direction, and the longitudinal section is the same as the longitudinal slope of the road, the lowest side of the top surface is 25cm from the surface of the road. Charge island protection: ahead of the toll booths set up 2 root 219 * 10.0 mm steel pi

25、pe anticollision column, on both sides of toll booths set up cold bending square steel crash barriers, to ensure that the toll collector, charge craft and equipment safety; The paving of the toll island: the paving of the toll island shall be made of colored cement squares, and the colors, specifica

26、tions and old islands shall be unified or determined by the construction unit; Charge island facade sign: island facade tag should be used by GB5768-1999 ordinary paint yellow black or red and white alternate with, line 15 cm intervals, charging island head aluminum reflective film, monochromatic 15

27、 cm width, to increase the reflective effect of the night.The location of the platform will not span the cement plate, so as to prevent the cooling of the heat, the platform will be safe. The platform is installed in the middle of the driveway.The horizontal, vertical and vertical slope of the table

28、 should be consistent, but the slope should not be greater than 2%. If said before and after the road slope is greater than 2% should be broken cement road surface, large heavy pouring cement pavement, leveling, control according to the slope, and the road smooth transition and weighing table, fight

29、 said passing vehicles of vehicle, the turbulence.An additional control box, a weighing screen foundation and a hand hole are added on all the export side charging island, with a horizontal drainage pipe in the hand hole leading to the side slope. Special attention should be paid to the horizontal d

30、rainage pipe center along the road and slope direction must have Angle, Angle to 15 to facilitate drainage. The bottom elevation of the hand hole is based on the base of the platform (if the water tank is set at the bottom of the hand hole, it can also be reached into the water tank). If the water i

31、n the table can affect the precision of weighing equipment.From the base of toll booth to the front hand hole of the island, the steel tube was installed in the front hand hole of the island, and the base of the weighing screen was added before the end of the island, and connected with the steel pip

32、e on the basis of the toll booth. If the distance between the traffic signal and the toll booth is not long enough, the weighing screen and the traffic signal will be fitted to the same post.2-2-3 installation of equipmentFreight vehicle standard in our country is not greater than the total length o

33、f 18 meters, so weighing equipment installed in 18 meters distance charge window location, short distance will lead to some super long car arrived in charge the window to the rear of the vehicle is not all by weighing mesa, long distance, in general the speed will be relatively faster, or vehicles i

34、n the variable state probability is bigger, affect the weighing precision. Because of the irregularity of individual vehicles, so weighing installation mesa is apart from the toll booths window than 18 meters, 18 to 23 metres or so commonly, so also facilitate vehicle queue, ensure that say a car, t

35、o pay the cost of a car. The glass surface of the infrared vehicle separator is easy to frost in winter. It is recommended that the windshield of the car should be used to heat the windshield to remove the frost. The weighing display shall include at least the model, the excess capacity, the amount

36、and the standby two lines. The screen should work all the time, with dust, rain and sun protection. The brightness should be guaranteed to be clearly visible to the division crew within a range of 20 metres under various lighting and natural environment conditions; Now displays are generally LED, so

37、 best can turn 15 , when installation is this display of the passenger, is easy to see.3. Equipment installation3-1 person (hand) hole and square cameraTo increase the charge fee of lane toll plaza, the corresponding increase toll booths under the manhole, set new shoulder outside the shoulder in th

38、e expansion of the manhole, affected the expansion of the early to dismantle the toll plaza of hand hole and based on the new toll plaza cameras3-2 equipment foundation and pipeline3-3 toll booths4. Quality control after completion of the projectTo conduct the delivery, completion inspection and acc

39、eptance according to the contract. Verify that the completed data and the completed drawings are in conformity with the actual construction and complete and accurate. Check the work load and defects, supervise the construction unit to complete the period until the issuance of the certificate of resp

40、onsibility for the defect.The measurement accuracy of the rechargeable equipment needs to be improved.Domestic optional manufacturer is not many, and the price of foreign equipment is higher, maintenance is not very convenient. To fully embody the thought of people-oriented, let the driver has the right to appeal, it is recommended to increase export square side outline a set of low speed/static portable review equipment, set up the simple overloading enforcement pavilion, pavilion with management computer, printer and other equipment.


注意事項

本文(收費島施工方案Constructionschemefortollisland(9頁).doc)為本站會員(正***)主動上傳,地產文庫僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對上載內容本身不做任何修改或編輯。 若此文所含內容侵犯了您的版權或隱私,請立即通知地產文庫(點擊聯系客服),我們立即給予刪除!




主站蜘蛛池模板: 边坝县| 叶城县| 金坛市| 时尚| 剑河县| 宜城市| 安吉县| 德惠市| 彭山县| 西峡县| 阿克| 常宁市| 镇康县| 突泉县| 汤原县| 上栗县| 淮滨县| 林口县| 东辽县| 博野县| 内丘县| 平谷区| 襄垣县| 高陵县| 汉川市| 车险| 开平市| 兰溪市| 峨眉山市| 临漳县| 盐池县| 威海市| 特克斯县| 黄龙县| 新宁县| 巍山| 翁源县| 沁源县| 建宁县| 故城县| 永康市|