1、Gay is now a provincial key construction project of aluminum Ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall respons
2、ibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadershi
3、p of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical
4、 innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, insta
5、llation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity o
6、f 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project
7、 is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant inc
8、rease in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide d
9、ense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy
10、saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef
11、ficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost cont
12、rol, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according
13、to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good . 目 錄1、總則11.1.編制依據11.2.編制原則11.3.編制范圍22、工程概況22.1
14、.工程概況及地質特征22.1.1.工程概況22.1.2.地形地貌22.1.3.地層巖性32.1.4.地質構造及地動參數32.1.5.水文地質特征32.1.6.工程地質條件評價42.2.工程建設條件52.2.1.交通條件52.2.2.施工用電52.2.3.通訊條件52.2.4.施工用水62.2.5.主要材料供應情況62.2.6.施工場地63、排水方案63.1.隧道反坡排水的特點63.2.總體方案63.3.主要的排水系統方式73.3.1.集水坑接力式反坡排水73.3.2.長距離管道配合小集水泵收集式反坡排水74、本工程擬采用的主要排水方案85、設備選型配套85.1.抽水設備型號選型原則85.2.需
15、要配用的設備及位置表96、排水系統96.1.管路96.2.集水坑設置96.3.固定泵站設置96.4.排水供電106.5.其他107、反坡隧道排水靈活處理的要點108、在洞外增加防水、防汛及防山洪措施109、各項保證措施109.1.組織管理保證109.2.安全技術保障措施1110、應急預案1111、環境保證措施1211.1.維護自然生態平衡的措施1211.2.合理規劃施工用地1211.3.臨時工程環境保護1211.4.生活區環境保護措施1311.5.植被保護1311.6.施工中的環保措施1311.7.竣工環境恢復措施1311.8.防止大氣污染措施1411.9防止噪聲污染措施1411.10.防止水
16、污染的措施1412、工期保證措施1412.1.工期保證方案1412.2.保證工期的主要措施1512.2.1.組織機構及人員選配1512.2.2.施工管理15Four outstanding works. They are derived from their own inner feelings. I also sent a student to attend the class Department speech contest, failed to get a good result, but also actively cooperate with the Department and
17、class activities! in order to create a demonstration dorm room, our weekly class to every bedroom check, where proposed is insufficient. In order to clean up the bedroom, we use the brush brushes a bedroom again. For the class out of a force. In the event we, many projects did not get the desired re
18、sults. But we understand that we tried, and in the struggle. Also has made good progress in many of the! in my class the work carried out and the results achieved, thanks to the concern and support of the Department, thanks to instructor teachers good, proper guidance, thanks to 46 students in the c
19、lass will work closely together, to work together. Of course, we also have our weaknesses, needs to be further correction in their future learning and life, with a view to achieving greater results. Five declarations of good party branch branch is a fortress, a party member is a banner. Fighting in
20、the railway engineering construction Group Headquarters Headquarters branches, a total of members 18. Role of the Xiang-GUI railway and tight South Lebanon railway, heavy, poor conditions of disadvantage, the branch closely around the construction work. Holding high the flag of our party members, un
21、ite and lead staff on the difficulties, overcome difficulties, take the zhengyou, a job well done and an engineering task, won the highly valued by leaders at all levels. Since October last year since the project began, Headquarters Branch is tightly around the center of its activities. Face South,
22、climate is wet, sooner or later temperature larger, specific difficult, I branch from thought requirements all workers active motivated, do can long-term hard, dare fight of spirit prepared, while requirements all members lead, encouraged colleagues Zhijian each other help, each other learning busin
23、ess knowledge, overcome temporarily difficult, active into to engineering official starts of the prepared work in the to, play out has as a branch of fighting fortress role and members of pioneer model role. Since its start, I command under the correct leadership of the party branch in the Group and
24、 the superior party, centering on building a qualified party branches, branch of the forts and the battle to play the exemplary vanguard role of party members, actively working. In command personnel less, and task heavy of situation Xia, all members always according to party stronger, and style to a
25、re, and service better, and efficiency to high of requirements, from overall starting, better to completed has production organization, and coordination, and guarantees and the management work, in engineering progress, and quality, and benefits, and safety, aspects are made has good of results, get
26、has owners and the Group and grass-roots units of praise. First, give full play to the exemplary role of party members. The exemplary role of party members and cadres are silent on the command, the exemplary role of party members and cadres are the best of the ideological and political education. We
27、 pay close attention to party building, requires political party members and cadres must take the lead in learning, set strict demands on themselves, .中鐵十七局集團有限公司1、總則1.1.編制依據(1)新建鐵路織金至畢節線施工圖織畢施隧-09及織畢隧工通0106、織畢隧工通01-28、29、貳隧(12)0078-2728、貳隧(12)0079-1920、39(表二)、貳隧(12)4002、貳隧(12)4002-8、10、13、24、貳隧(12)
28、4001。(2)業主關于織畢線線下工程工期安排要求。(3)中華人民共和國主席令中華人民共和國安全生產法(第70號)。(4)中華人民共和國國家標準爆破安全規程(GB6722-2003)。(5)國務院令建筑工程安全生產管理條例(第393號)。(6)鐵道部鐵路隧道施工技術指南(TZ1204-2008)。(7)鐵道部鐵路隧道工程施工安全技術規程(TB10304-2009)。(8)當地氣候環境及現場踏勘資料。(9)鐵路工程施工組織設計指南鐵建設2009(226號)。(10)已審批的中鐵十七局集團新建織金至畢節鐵路站前工程1標實施性施工組織設計。(11)我單位綜合管理、施工技術和機械裝備水平以及類似工程施
29、工中的經驗和工法成果。(12)其他相關規范。1.2.編制原則(1)遵守招標文件中的安全、質量、工期、環保、文明施工等的規定及鐵路建設工程施工合同條件、合同協議條款及補充協議內容。滿足建設工期和工程質量標準,符合施工安全、環境保護、水土保持和地質災害防治等要求。(2)積極與建設、設計、監理及其它單位、部門聯系,搞好協調配合工作;理順進度與質量、進度與安全之間的關系,使三者協調統一。(3)遵循“百年大計、質量第一”的原則,建立完善的質量保證體系,嚴格按照設計資料和國家、鐵道部現行的技術規范要求施工,以優良的工程質量和優質的服務滿足全線創優規劃的要求。(4)建立完善的安全保證體系,推行安全標準工地建
30、設,確保施工全過程的安全。(5)投入足夠的技術裝備和人員,采用機械化施工,科學安排施工工序,合理安排勞力、材料和機械設備,優化資源配置,確保工期要求。(6)實行文明施工,重視環境保護,珍惜土地,合理利用,嚴格執行職業健康安全管理體系。嚴格遵循有關環保和水保法規,及建設單位對本工程環境保護、節能的要求,配合當地政府和有關部門做好環保和水保工作。(7)以標準化管理為基礎,現代化科技為手段,合理組織,抓住施工關鍵工序,超前安排,確保標段工期及總工期的實現。1.3.編制范圍新建鐵路織金至畢節線站前一標石昌坡隧道,里程DK338+136-DK339+463,全長1327m。2、工程概況2.1.工程概況及
31、地質特征2.1.1.工程概況(1)石昌坡隧道全長1327m,進口里程DK338+136,出口里程DK339+463,單隧道,設計為-11.2的單面坡,全隧除DK338+136-DK338+438.81段位于半徑R=2000m的左偏曲線上,DK339+103.12-DK339+463段位于半徑R=2500m的右偏曲線外,其他地段均位于直線段上。(2)石昌坡隧道進口與三岔溝2#中橋相鄰,出口與小橋溝大橋相連。線路左側有大方-法啟碼頭的公路與線路平行通過,線路左側分布大方電場,交通方便。該隧最大埋深約100m。(3)隧道主要工程地質為茅口組(P1m)灰巖,局部夾強風化硅質頁巖、泥巖。不良地質為巖溶、
32、危巖落石、順層偏壓。2.1.2.地形地貌石昌坡隧道進口位于三岔溝右側,距大方電廠水泵站約300m,向南至小橋溝邊出洞,進出口為深切的沖溝,地形陡峭,屬云貴高原地中山溶蝕,剝蝕地貌,地面高程1264-1366m,相對高差約100m。總體地形左高右低,區內地表基巖大面積出露。線路左側有大方至法啟碼頭的公路與線路近平行通過,線路左側分部大方電廠,交通較方便。隧道起訖里程:DK338+136-DK339+463,全長1327m。2.1.3.地層巖性上覆第四系破殘積(Q4dl+el)黏土,二疊系下統茅口組(P1m)灰巖,各層巖土特性分層如下:黏土(Q4dl+el):褐黃-淺黃色,硬塑狀,含約少量灰巖質碎
33、石角礫,主要分部與區內可溶巖斜坡地表,具弱膨脹性,厚0-2m,屬級普通土。灰巖(P1m),淺灰-灰色,局部夾強風化硅質頁巖、泥巖,厚層-塊狀結構,巖體較完整,質堅性脆,巖溶中等發育,隧道出口端右側陡崖上見一溶洞,節理裂隙發育,屬于級次堅石。2.1.4.地質構造及地動參數根據中華人民共和國國家標準(GB18306-2001)分布的中國地震動峰值加速區劃圖(1/400萬)和中國地震動反應譜特征周期區劃圖(1/400萬)劃定,隧道內地震動峰值加速度0.05g,地震動反應譜特征周期為0.35s。2.1.5.水文地質特征(1)地表水隧區內地形左高右低,隧道出口為深切的沖溝,有常年流水,水量隨季節變化,變
34、化量較大,以上游來水補給,經取沖溝水化驗。水質類型見下表:試驗編號里程水類別水質類型侵蝕性判別2011-織畢水G-49DK337+960左20m溝水SO42-,-Ca2+型水具SO42-侵蝕,等級H22011-織畢水G-48DK339+550左224m溝水SO42-,-Ca2+,Mg2+型水具SO42-侵蝕,等級H1(2)地下水地下水主要為巖溶裂隙水,主要賦存于灰巖的溶孔,溶蝕裂隙中,通過洼地、豎井、落水洞、溶洞匯集大氣降水的補給,以巖溶下降泉。暗河的形式排泄于線路的對江河,區內未發現有地下水露頭,地下水埋藏較深,屬于中等富水巖組,地下水水向線路右側的白布江排泄。據附近水質化驗報告,對砼具有侵
35、蝕性。試驗編號里程水類別水質類型侵蝕性判別2011-織畢水G-50DK337+960左106m裂隙水HCO3-,SO42-,-Ca2+型水無侵蝕性隧道涌水量預測本隧道巖性單一,巖溶中等發育,為巖溶隧道,隧道位于巖溶垂直循環帶內,地下水埋藏深,洞身鉆孔中未發現地下水位,適合用大氣降水入滲法(洼地法)來計算隧道涌水量。本隧道一般涌水量為9000m3/d,雨季最大涌水量為18000m3/d。2.1.6.工程地質條件評價(1)不良地質巖溶隧道穿越茅口組灰巖,巖溶中等發育。測區地表水調查時地表溶洞、溶蝕洼地等嚴重形態較少,僅在隧道出口(DK339+440右50m)陡崖上發育一溶洞。隧道施工中可能遇到隱伏
36、的巖溶形態,雨季施工時可能揭穿某溶洞和巖溶管道時發生涌水、突水突泥等地質災害。線路右側直接距離300-500m為對江河,其為深切的:“V”字型峽谷地貌,河底標高大致為1140m。其為測區內的巖溶最終侵蝕基準面。路線標高在1280.隧道進出口為深切的溝谷,進出口及洞身溝槽中未見泉點出露。綜合分析,推測隧道洞身位于巖溶垂直循環帶中。隧道開挖揭示有長流水的隱伏巖溶形態(如暗河)的可能性小。但在雨季施工時,地表水大氣降水沿著溶洞、落水洞、溶蝕洼地等巖溶形態以幾塊的速度下滲,雨季施工是易發生短時、間歇性的涌水、突泥等地質災害。危石落石隧道出口段地形陡峻,植被較發育,斜坡上基巖多裸露,巖石節理裂隙較發育,
37、巖體較破碎,塊徑1-3m不等。順層偏壓隧道進出口及洞身,巖性為硬質灰巖,巖層產狀N5W/11NE、N5E/22NW,線路與巖層走向交角5-15,視傾角為11-22,傾向線路右側,線路穿過的底層為二疊系下統茅口朱忠厚層狀灰巖,線路左側圍傾向偏壓。(2)特殊巖土無特殊地質。2.2.工程建設條件2.2.1.交通條件線路左側有大方至法啟碼頭的公路與線路近平行通過,線路左側分部大方電廠,交通較方便。進口及出口位置為深切的沖溝,地形陡峻,交通不便。2.2.2.施工用電在隧道進口設一臺800KVA變壓器供洞外設備及洞內800m范圍內的施工、照明用電。在800m以后采用10KV高壓進洞,并在隧道進口、出口工作
38、面安裝一臺500KVA移動變壓器供洞內施工用電。各個作業面配備2臺250kw發電機以備停電時使用。2.2.3.通訊條件隧道進口移動通訊信號較好,可滿足現場施工通訊條件。同時為各施工班組領班員配備發射距離10km對講機一臺,作為備用無線通訊設備。有線通訊采用洞內每300m安裝固定電話一臺,洞外設總機一臺,配備專業調度員一名,專門負責洞內外信息溝通。2.2.4.施工用水隧道施工用水采用高增壓泵供水。在隧道洞口附近河道內取水;管路埋設在凍結線以下,高揚程水泵抽水至洞口高山水池,隧道進口設一座120m3水池,再用100鋼管從高山水池引入洞內,供洞內高壓用水。2.2.5.主要材料供應情況根據實際調查,主
39、要采用大方縣境內地材。水泥、鋼材主要從外地依靠汽車運至工地。2.2.6.施工場地本隧道按照“滿足生產、方便施工、因地制宜、統籌規劃、布局合理、便于管理”的原則,分別在隧道進口洞口建設營地,建配電房、水泥庫、設備修理場、配件庫、鍛釬房、油料庫、鋼材加工場等生產用房及倉庫、空壓機站高壓供風,洞門外1520m處修建風機底座,安設軸流風機。生活用房以就近租賃房屋為主,新建彩鋼房為輔。施工生活用水從當地百姓生活水井取水,生產用水自周邊就地取水。在洞口山腰合適部位設高山水池,鋪設上、下水管路供應高壓水和各施工點用水。交通條件良好,修筑通往棄渣場的施工便道。隧道的初期支護、水溝、電纜槽槽身及蓋板預制等附屬工
40、程混凝土及二次襯砌用混凝土統一由最近大型拌合站集中供應。3、排水方案3.1. 隧道反坡排水的特點反坡施工即向洞內施工前進方向為下坡,洞內水向工作面匯集,需要及時抽排,以防止施工掌子面水積聚過深,影響隧道圍巖的穩定和危及隧道施工的機械設備及施工人員的安全,影響正常的施工生產。3.2. 總體方案反坡排水,需采用機械排水,設置多級泵站接力排水,工作面積水采用移動式潛水泵抽至就近泵站或臨時集水坑內,其余已施工地段隧道滲(涌)水經隧道內側溝自然匯集到臨時集水坑內或泵站水池內,由固定排水泵站將積水經排水管路抽排至上一級排水泵站內,如此由固定式排水泵站接力將洞內積水抽排至洞外,經污水處理池處理后排放,固定式
41、排水泵站水倉容量按5min涌水量設計,并考慮施工和清淤方便,綜合確定如下;臨時集水坑根據匯水段匯水量大小確定。工作水泵按使用1臺,備用5臺,檢修1臺配備,針對隧道涌水量大時要適當增加工作水泵;同時為防止突水,設置利用高壓風管作為1套應急排水系統。3.3 .主要的排水系統方式洞內反坡排水方式,根據坡度、水量和設備情況布置管路和排水泵站,一次或分段接力排出洞外。根據本隧道的實際情況,擬在施工中采用的反坡排水系統布置方式有兩種:3.3.1. 集水坑接力式反坡排水對坡度較大隧道施工對排水電機揚程要求相對較高,所以采用集水坑反坡道排水方式,在隧道施工過程中分段開挖反坡排水溝,在每一段的終點開挖集水坑,設
42、抽水機一臺,把積水抽至最后一段反坡,最后一個抽水機將積水排除洞外,采用接力的方式將水抽至洞外的污水沉淀處理池。如下圖: LK-集水坑間距 is-線路坡度 圖(一):集水坑接力式反坡排水方式3.3.2. 長距離管道配合小集水泵收集式反坡排水對坡度較緩的隧道反坡道施工排水,適合采用較長距離開挖固定式集水坑作為泵站,用小集水泵將開挖面的積水抽到最近的集水坑內,再用大功率的泥漿泵通過排水管道將水排到洞外。如下圖: 洞內平面布置示意圖圖(二):長距離采用的反坡排水方式這種方式的優點是所需抽水機較少,需要開挖的集水坑較少,排水泵站較少,缺點是要安裝水管較長,抽水機需要跟隨坑道的掘進二次拆遷前移。4、本工程
43、擬采用的主要排水方案石昌坡隧道坡度較緩,采用長距離管道配合小集水泵收集反坡排水,考慮隧道反坡施工較長以及水泵揚程等因素, 隧道擬設置固定式排水泵站3座,每420米設置一座,分別設置在DK338+476,DK338+896,DK339+316處右側避車洞處。實際施工時如遇到涌水量較大時可根據具體情況加密,泵站之間采用150mm排水管長距離輸送,前方施工掌子面積水采用臨時集水坑來收集積水,小集水泵用80mm消防軟管將積水收集并輸送至最近的較大的集水泵站內,對兩個固定式排水泵站之間積水采用洞內兩側設排水溝加橫溝自然匯集至高程較低的集水泵站內,由最后一級排水泵站傳遞至洞外污水處理池。5、設備選型配套5
44、.1.抽水設備型號選型原則隧道排水主要為隧道滲水,同時需考慮到施工用水。水質除地下水的本身成分外,主要還有巖石、石屑、泥漿,同時還有噴射混凝土的回彈物摻雜物,所以除考慮到需排出的水量外,還應考慮到排水的成分組成。洞內水量是逐段遞增,在各級泵站的水泵選型上,應按照排水能力遞增原則自下而上遞增選配。各級泵站排水能力應充分配備,并有一定的儲備能力。隧道施工后通過對洞內水的成分組成分析,其主要水質除地下水的本身成分外,主要還有巖石、石屑、泥漿等成分,泥漿泵考慮選用山東淄博博山潤神渣漿泵公司生產的高效耐磨渣漿泵,揚程30m,流量80m3/h,功率22Kw。隧道內泵站間水量遞增較大,為了考慮到在管理、操作
45、維修上的方便,泵站間高差相近,選用型號相同水泵,只是在設備數量上相應增加。工作面移動水泵,采用移動輕便的水泵,實際操作根據水量大小在數量上予以增減。5.2.需要配用的設備及位置表石昌坡隧道左幅設置泵站位置及選用設備一覽表施工工區涌水量泵站位置水泵型號水泵數量備用數量抽水能力石昌坡隧道18000立方米/天DK338+476GMZ100-30-801580m3/hDK338+896GMZ100-30-801580m3/hDK339+316GMZ100-30-801580m3/h6、排水系統6.1.管路根據洞內水量情況,結合選配的抽水設備,正常施工排水采用3套管路(可根據隧道施工后洞內涌水情況增加管
46、路):2套為150mm管材均為無縫鋼管(一套檢修備用,一套日常使用);1套為80mm消防軟管(工作面上移動積水)。6.2.集水坑設置集水坑設于洞內右側,每隔420m設置1處,同時根據隧道內出水量情況予以適當加密。臨時集水坑的容量按該段5min的匯水量加上施工用水量(每工作面20-30m3/d)合計確定,一般集水坑尺寸為:2m(長)*3m(寬)*1m(深),容量6m3,可根據實際情況進行調整大小。6.3.固定泵站設置固定泵站為整個施工過程結束前所使用的接力排水水倉位置,其具體位置詳見上面,泵站水倉容量計算按該段5min的匯水量加上施工用水合計確定,其結構尺寸為3m(長)*3m(寬)*1m(深),
47、容量9m3,可根據隧道開挖后的實際情況進行調整,泵站統一設置在洞內左側。6.4.排水供電為確保洞內排水正常進行,不因電路問題導致抽排工作的間斷,設置一條專用供電線路。由于水泵功率較大,新用電源電壓為380V,所以泵站用電引入380V穩定電源。6.5.其他工作面排水采用移動式水泵,管路為80mm消防軟管,抽排至就近泵站或臨時集水坑內。為確保洞內道路無水干爽,必須修建好兩側排水溝,確保洞內滲水通過側溝引入集水坑內,防止在洞內道路上漫流。7、反坡隧道排水靈活處理的要點在隧道單側或雙側設置的排水溝,排水溝的大小要依據隧道的坡度和涌水量的大小確定。抽水設備要依據隧道洞內涌水量的大小及集水坑匯水的情況而定
48、,同時水泵的揚程要參考隧道的坡度和起始點的高差,要盡量做到有一定的富余量。8、在洞外增加防水、防汛及防山洪措施在隧道進口處做好排水措施,做到排水暢通,并在洞口增加截水橫溝,防止地表水和施工排水倒灌進洞,根據洞口水量情況可適當加大橫溝斷面,并在溝頂加蓋鐵板,做到排水和行車互不影響,9、各項保證措施9.1.組織管理保證在排水施工上不僅需要一套完善、合理的排水系統,還需在管理上予以加強,才能達到預期的效果。為此不僅成立了專業排水隊,每個隊設隊長一人,副隊長一人,設備檢修2人,排水工班2個班,每班組成:工班長1人,泵站管理1人。還制定嚴格的值班制度。每個隧道作業面的隧道排水日常工作堅持隊長、副隊長輪流
49、24h值班制,并制定抽水記錄表進行統一管理,發現問題及時處理,匯總問題進行總結分析。9.2.安全技術保障措施對施工技術人員進行技術和操作培訓,針對一些技術特點和操作要領作重點講解和現場示范。對用電的排水設備要確保電路安裝的正確,檢查轉向是否正確,設置接地裝置及標志,要嚴格按照安全用電方案辦理,做到一機一閘一漏。水泵的冷卻采用下一個泵站抽上來的水直接澆至排水泵上進行冷卻。由于洞內均為滲水,雖然使用水泵為污水泵,一旦在進水口處產生淤積將導致堵泵。為此,需要對坑內污水進行攪合,施工中采用在水泵與管路的接口處安一處出水口并安裝閥門,利用抽水的高壓水不斷對進水口處進行沖攪,同時利用高壓風進行沖吹,防止淤
50、泥的淤積。針對隧道施工的特點,施工人員對隧道內排水溝及集水坑內污泥雜物要及時進行清理,對管路要定期檢查維修,定期用清水進行沖洗。在集水泵進水口包裹鐵窗紗,同時把水泵或進水口放在竹筐內,可以防止污泥及雜物進入而發生堵塞。當水位下降超過底座,間隙出水時,應立即停機檢查,運行一段時間后,須進行維護保養。及時地進行保養和維修確保設備正常運轉的必要措施。對隧道內的抽水設備要定期進行安全檢查,并派專人負責管理,做到24小時輪流值班,建立嚴格的值班管理制度。對易損的排水設備及管理配件要有必要的儲備和供應上的保障。10、應急預案由于本段隧道施工地址環境復雜,可能出現突水、涌水等突發事故。為此,在現有排水系統上
51、增設了1套設備和管路作為應急措施。管路利用高壓進水管路,即在每個泵站處在高壓水管上開口,與安裝在泵站處的水泵接通,正常情況下把閘閥關閉。一旦遇到突水、涌水現象,即把進水閘閥關閉,截斷高壓供水,打開排水閥進行應急抽排,在特殊情況下,洞內高壓風管也可以改造利用上作為排水管道。針對隧道反坡施工排水的困難的特點,對隧道內突發涌水事故,抽水設備損害,水位突然升高,建立必要的逃生系統,在掌子面及隧道內設置應急燈,在隧道內作業區放置救生衣,并保持隧道內通信暢通,發生突發事故后及時上報項目部應急預案領導小組,啟動突發事件的應急預案。11、環境保證措施11.1.維護自然生態平衡的措施保護當地自然植被,采取措施使
52、地表植被的損失減少到最低限度。施工現場生產、生活房屋及生活設施、原材料堆放處和材料加工場均在規劃的區域內進行。修建的施工便道,要結合鄉鎮長遠規劃,選擇線路。棄土場必須做好防護工作,確保不發生水土流失情況,并進行棄土場綠化。施工期間對施工人員加強保護自然資源及野生動植物的教育,嚴禁隨意砍伐和偷獵,限制施工人員和車輛的活動范圍。施工便道選線、生活營地、大型臨時設施場地選址盡量少占或繞避林地、耕地,保護原有植被。對合同規定的施工界限外的植物、樹木等盡力維護,嚴禁超范圍砍伐。工程完工后及時進行現場清理,復墾或綠化。11.2.合理規劃施工用地嚴格按設計和業主規定的征地范圍和數量丈量用地,嚴禁超范圍占用土
53、地和水面。施工臨時設施在滿足工程需要的前提下不占或少占農田,各種臨時房屋采取因地制宜、簡易方便的原則就近設置,充分利用荒地、線路附近的既有道路和房屋場地。11.3.臨時工程環境保護便道、砼攪拌站及施工營地的設置,要合理、緊湊,嚴禁隨意搭建,盡量減少對植被的損壞,不占用鄉村道路、阻礙交通。攪拌站等高噪音生產設施盡可能遠離居民區或采取限時作業措施。施工場地周圍預先開挖排水溝,做到排水暢通,場內不得積水、積污,應充分考慮其對原地面排水的影響,以免阻擋地表徑流的排泄,影響當地居民的生產生活。施工營地及施工現場設固定的垃圾桶或垃圾池盛放垃圾,分類標識存放,定期清理,運至指定的垃圾處理場或廢品回收利用,不
54、得亂扔、亂倒垃圾。施工場地的遺棄物、廢油等集中進行預處理后,采用專用車輛運輸至指定的處理廠或存放點。污水須排入當地的排污管道或經集中凈化處理后排出,嚴禁將未達到排放標準的生活污水直接排放至江河及其它水體中。施工場地和運輸道路須定期灑水養護,避免產生揚塵。生活區及施工場地周圍的植物、植被,嚴禁隨意踐踏和破壞,并在生活區設立植被宣傳保護牌,告示參加施工人員對環境的保護人人有責。11.4.生活區環境保護措施生活區臨時工程的修建本著節約用地、方便生活、利于生產、保護植被的原則,統籌安排,合理選址,經業主、當地環保部門審批,主動接受監督檢查。生活區的設置要相對集中,設置必要的公共衛生設施,廢水凈化池、化
55、糞池,按照環保部門的要求定期清理,避免生活垃圾污染環境。生活固體垃圾集中堆放、適時運至環保部門指定地點,保持駐地清潔。臨時生活設施的修建、拆除時產生的固體廢棄物,按照環保部門的要求棄于指定地點處理。11.5.植被保護施工期間對施工人員加強保護自然資源及野生動植物的教育,嚴禁隨意砍伐,限制施工人員和車輛的活動范圍。施工便道選線、生活營地、大型臨時設施場地選址盡量少占或繞避林地、耕地,保護原有植被。對合同規定的施工界限外的植物、樹木等盡力維護,嚴禁超范圍砍伐。工程完工后及時進行現場清理,復墾或綠化。11.6.施工中的環保措施做好當地水系、植被的保護工作,在施工時對邊仰坡坡及時進行防護與植被綠化,施
56、工車輛不得越界行駛,以免碾壞植被、莊稼、鄉村道路等。11.7.竣工環境恢復措施工程完工后應將臨時設施全部拆除,當地可以利用的,可通過當地政府或環保部門的同意,協議轉讓。對施工場地要認真清理并收集施工垃圾運至指定的位置處理或就地掩埋。工程完工后,臨時租用的土地立即復耕歸還。11.8.防止大氣污染措施臨時運輸道路經常灑水濕潤,減少道路揚塵。作業場地及運輸車輛應及時清掃、沖洗,保證場地及車輛的清潔;主要運輸道路需進行固化,要定時灑水防塵,嚴禁在場地內燃燒各種垃圾及廢棄物.11.9.防止噪聲污染措施施工噪聲主要包括施工現場、機械作業時和車輛運輸時產生的噪聲。為減少噪聲影響,機械設備選型配套時優先考慮低
57、噪聲設備,盡可能采取液壓設備和摩擦設備代替振動式設備,并采取消聲、隔音、安裝防震底座等措施。加強機械設備的維修保養,保證機械設備的完好率,確保施工噪聲達到環境保護標準要求。合理布置施工和生活區域。進入施工現場的機械車輛少鳴笛、不急剎、不帶故障運行,減少噪聲。11.10.防止水污染的措施施工及生活廢水的排放應遵循清污分流、雨污分流的原則,各種施工廢油、廢液集中儲積,集中處理,嚴禁亂流亂淌,防止污染水源,破壞環境。施工作業產生的污水必須經過沉淀池沉淀,并經凈化處理,符合要求后排放。反坡排水通過管道或溝渠排至隧道口處沉淀池,進過過濾處理后引致原有排水體系進行排水。12、工期保證措施12.1.工期保證
58、方案為確保業主工期要求,按期優質完成施工任務,擬采取以下工期保證方案:(1)、選拔業務精、能力強的管理和施工人員,配齊配足技術工人。(2)、充分細致地做好開工前的各項施工準備工作。(3)、按照總工期目標,采用倒排工期法,制訂詳細的分段工期控制計劃。(4)、采用新工藝、新技術、新材料、新設備提高施工效率。抓住物資供應及設備維修保養,按照計劃足量、準時供應,滿足施工進度要求。(5)、保證工期的組織機構成立工期領導小組,由項目經理任組長,各有關人員參加,定期對旬、月進度情況進行分析、研究,并適時采取措施確保進度計劃的兌現。同時健全崗位責任制,從組織上、制度上、防范措施上對工期進行控制。12.2.保證
59、工期的主要措施為了確保本標段工期目標的實現,我單位從組織機構、人員選配、施工管理、設備調配、資金投入、技術等方面予以保障。12.2.1.組織機構及人員選配(1)、組建強有力的項目管理機構,其人員由具有豐富的鐵路隧道施工經驗的人員組成,以便對施工生產中出現的各種問題能夠科學、快速的解決,并做到超前謀局,保證工程的快速順利進行。(2)、建立健全領導機構,成立由項目經理任組長,有關人員參加的工期領導小組,分析、研究施工生產中存在的有關問題,及時制定應對措施,防止延誤工期。(3)、以分部為大后方,堅持“后方服務于前方”的指揮原則,以生產需要為前提,必要時抽派施工部門的力量充實前方,確保施工生產的順利進
60、行。(4)、科學、均衡的組織施工生產,對施工中因設計變更、外界干擾或其他原因造成的工期延誤,將及時調整計劃安排,并快速從附近工地組織勞動力和設備進場,加強施工力量,盡快將延誤的工期趕回來。12.2.2.施工管理(1)、快速組織施工人員、機械設備和物資材料進場,按工程進展需要配足各項生產要素,以“三快”,即進場快、建點快、開工快為主體施工贏得寶貴時間,抓住有利施工季節,實現施工的良好開端。(2)、強化施工調度指揮與協調工作,超前布局謀勢,密切監控落實,及時解決問題,避免工期延誤。重點項目或工序采取垂直管理,減少中間環節,提高決策速度和工作效率。(3)、實行工期目標管理責任制,嚴格計劃、檢查、考核
61、與獎懲制度,加強施工全面協調工作。(4)、以安全、質量為核心,通過安全、質量促進施工進度,堅持“穩中求快”的生產方針,防止盲目冒進,以便工程施工的順利進展。(5)、應用網絡技術優化、配置生產資源,抓住施工關鍵線路,精心組織、合理安排,按實際進展情況及時對計劃安排進行修訂,并適時掀起生產高潮,加快施工進度。(6)、采取早安排、早施工、穩扎穩打、安全作業的原則,重點工序單獨編制作業指導書,配足人力、物力及設備,確保重點工序的施工進度,從而保證工期。(7)、挖掘內部潛力,廣泛開展施工生產勞動競賽,營造比、學、趕、幫、超的氛圍,不斷掀起施工高潮,確保總工期目標和階段工期目標的實現。(8)、加強思想政治工作,發揮黨、政、工、團齊抓共管的傳統優勢,大力宣傳優質、高效建好本工程的重要性,鼓勵全體參戰職工,以主人翁的工作姿態,按期建好本工程。(9)、搞好與地方關系建設,增取地方的支持,營造良好的外部施工氛圍。(10)、做好季節性安排,防止不良氣候對施工生產造成大的影響。17中鐵十七局集團有限公司