1、配線線路絕緣電阻測試記錄Record of Insulation Resistance Test for Distribution Line電07 編號No:_單位工程名稱Name of unit project施工日期Construction duration分部工程名稱Name of divisional project分項工程名稱Name of sub-divisional project施工圖號Construction drawing No.檢查部位Inspection location測試儀器型號、精度Type and precision of test instru.線路編號Cir
2、cuit No線路型號、規格、敷設方法Circuit type、spec、laying mode絕緣電阻(M)Insulation resistanceABBCCAANBNCNAPEBPECPENPE監理(建設)單位:Supervision Company(The Owner):(公章)監理工程師: (Seal)Supervising Engineer:(建設單位代表):(Representative of The Owner):年 月 日Year/Month/Day施工單位:Construction Company:班組長:Monitor of Work Team: (公章)施工員: (Se
3、al)Technician:質檢員:Quality Inspector:年 月 日Year/Month/Day接地電阻測試記錄Record of Grounding Test電09 編號No:_單位工程名稱Name of unit project測試日期Test date分部工程名稱Name of divisional project分項工程名稱Name of sub-divisional project施工圖號Construction drawing No.測試儀器型號、精度Type and precision of test instru.測試部位Test location接地性質Grou
4、nding kind接地電阻()Grounding resistance 測試環境Surrounding of test結論Conclusion設計值Design value實測值Measured value溫度()Temperature天氣情況Weather簡圖或備注:Sketch or remarks:監理(建設)單位:Supervision Company(The Owner):(公章)監理工程師: (Seal)Supervising Engineer:(建設單位代表):(Representative of The Owner):年 月 日Year/Month/Day施工單位:Const
5、ruction Company:班組長:Monitor of Work Team: (公章)施工員: (Seal)Technician:質檢員:Quality Inspector:年 月 日Year/Month/Day電纜敷設及絕緣電阻測試記錄Record of Cable Laying and Insulation Resistance Test電06 編號No:_單位工程名稱Name of unit project施工日期Cons. duration分部工程名稱Name of divisional project施工圖號Construction drawing No.測試儀器型號、精度Ty
6、pe and precision of test instru.電纜編號Cable No.規格型號Spec. and type起點From終點To敷設方式Laying mode電纜頭型式Type of terminal中間頭數量Number ofconnection絕緣電阻(M)Insulation resistance長度(m)Length相間Phases對零To zero對地To earth電纜支架安裝記錄:Record of Cable support Installation:1) 電纜支架最上層至豎井頂部或樓板的距離為_m;1)Distance from the upmost of
7、support to the top of vertical shaft or floor slab is _m;2)電纜支架最下層至溝底或地面的距離為_m;2)Distance from the undermost of support to ditch bottom or ground is _m;3)電纜支架層間最小距離為_m;3)The min. distance between layers of cable support _m。班組長: 施工員: 質檢員: 年 月 日Monitor of Work Team: Technician Quality Inspector: Year/
8、Month/Day電纜橋架安裝檢查記錄Record of Cable Trays Installation Inspection電05 編號No:_單位工程名稱Name of unit project施工日期Cons. duration分部工程名稱Name of divisional project分項工程名稱Name of sub-divisional project project施工圖號Construction drawing No.橋架材質Material of the tray支架安裝Supports installation規格Spec.水平安裝間距(m)Horizontal sp
9、acing of the trays垂直安裝間距(m)Vertical spacing of the trays固定方法Fixing method規定值Specified value實測值Measure value規定值Specified value實測值Measured value橋架安裝Cable trays installation規格Spec.長度(m)Length彎曲半徑(mm)Bending radius伸縮節的設置Extension joints固定方法Fixing method允許值Permitted value實測值Measured value與接地干線的連接情況:Conne
10、ction with trunk line of grounding:連接板兩端的跨接接地情況:Cross connection grounding in two ends of the connection plate:簡圖說明:Illustration:班組長: 施工員: 質檢員: 年 月 日Monitor of Work Team: Technician Quality Inspector: Year/Month/Day技 術 交 底 記 錄Record of Techniques Clarification施04 編號No:_單位工程名稱Name of unit project分部工程
11、名稱Name of divisional(sub-divisional) project施工圖號Construction drawing No.交底依據:Basis of clarification:交底內容:Contents of clarification:交底人簽字:Signature of The Person to Clarify:年 月 日Year/Month/Day被交底人簽字:Signature of The Person to Accept The Clarify: 年 月 日Year/Month/Day開 工 報 告Report of Work Commencement施0
12、3 編號No:_單位工程名稱Name of unit project合同造價Contract price計劃工作天Planed work days工程地點Project location計劃開工日期Planed start date計劃竣工日期Planed completion date施工許可證或開工報告批準文號Construction license or the No.of approval for project start序號No.工程開工條件Conditions of the project start具備情況Conditions available1合同或協議書簽訂情況Sign
13、on the contract or agreement2工程項目是否列入計劃The project is listed in the plan3設計交底施工圖會審情況Design clarification and the drawings joint checkup4施工組織設計或施工方案批準交底情況Approval for construction organization or construction plan5施工圖預算編制情況Completion of the budget making with the construction drwaing6施工機械落實情況Construc
14、tion machines are available7主要材料供應情況Material supply is available 8現場管理人員到位情況Field managing persons are at the posts9勞動力落實情況Labor supply is available10施工現場道路、水、電、通訊等條件情況Waterpower supply、road communication etc. available on site. 工程內容:Construction description:審批意見:Comments in Approval:(公章) (Seal)總監理工
15、程師:Chief Supervising Engineer:(建設單位代表):(Representative of The Owner):年 月 日Year/Month/Day申報單位:Company to Apply for:(公章) (Seal)代表:Representative:年 月 日Year/Month/Day線路、插座、開關接線檢查記錄Record of Lines、Sockets、Switches Wiring Inspection電13 編號No:_單位工程名稱Name of unit project分部工程名稱Name of divisional project施工圖號Co
16、nstruction drawing No.檢查日期Test date配電箱及回路編號Distribution cabinet and circuit NO.線路Line插座Socket開關Switch顏色Color連接Connection接線位置Wiringlocation接地線連接Connection with grounding接線Wiring控制順序Control sequence通斷方向On/offdirection監理(建設)單位:Supervision Company(The Owner):(公章)監理工程師: (Seal)Supervising Engineer:(建設單位代表
17、):(Representative of The Owner):年 月 日Year/Month/Day施工單位:Construction Company:班組長:Monitor of Work Team: (公章)施工員: (Seal)Technician:質檢員:Quality Inspector:年 月 日Year/Month/Day住宅小區智能化安全防范系統檢驗批質量驗收記錄(GB50339-2003) 編號:071002 工程名稱分項工程名稱項目經理施工單位驗收部位施工執行標準名稱及編號專業工長(施工員)分包單位分包項目經理施工班組長質量驗收規范的規定施工單位自檢記錄監理(建設)單位驗
18、收記錄主控項目1室內機門鈴提示,訪客通話及管理員通知應清晰,通話保密功能與室內開啟單元門的開鎖功能應符合設計要求-1條門口機呼叫住戶和管理員機的功能、CCD紅外夜視(可視對講)功能、電控鎖密碼開鎖功能、在火警等緊急情況下電控鎖的自動釋放功能應符合設計要求-2條管理員機與門口機的通信及聯網管理功能,管理員機與門口機、室內機互相呼叫和通話的功能應符合設計要求-3條市電掉電后,備用電源應能保證系統正常工作8小時以上-4條一般項目1訪客對講系統室內機應具有自動定時關機功能,可視訪客圖像應清晰,管理員機對門口機的圖像可進行監視13.4.3條施工操作依據質量檢查記錄施工單位檢查結果評定項目專業 項目專業質
19、量檢查員(簽名): 技術負責人(簽名):年 月 日監理(建設)單位驗收結論專業監理工程師(簽名):(建設單位項目專業技術負責人)年 月 日注:本表由施工項目專業質量檢查員填寫;專業監理工程師(建設單位項目專業技術負責人)組織項目專業質量(技術)負責人等進行驗收:質量檢查記錄(檢測報告、質量證明文件)填寫在表D.0.1的附件表中。綜合布線系統性能檢測檢驗批質量驗收記錄(GB50339-2003) 編號:070602 工程名稱分項工程名稱項目經理施工單位驗收部位施工執行標準名稱及編號專業工長(施工員)分包單位分包項目經理施工班組長質量驗收規范的規定施工單位自檢記錄監理(建設)單位驗收記錄主控項目1
20、系統監測應包括工程電氣性能檢測和光纖特性檢測9.3.4條一般項目1采用計算機進行綜合布線系統管理和維護時,應按規定進行檢測9.3.5條施工操作依據質量檢查記錄施工單位檢查結果評定項目專業 項目專業質量檢查員(簽名): 技術負責人(簽名):年 月 日監理(建設)單位驗收結論專業監理工程師(簽名):(建設單位項目專業技術負責人)年 月 日注:本表由施工項目專業質量檢查員填寫;專業監理工程師(建設單位項目專業技術負責人)組織項目專業質量(技術)負責人等進行驗收:質量檢查記錄(檢測報告、質量證明文件)填寫在表D.0.1的附件表中。綜合布線系統安裝檢驗批質量驗收記錄(GB50339-2003) 編號:0
21、70601 工程名稱分項工程名稱項目經理施工單位驗收部位施工執行標準名稱及編號專業工長(施工員)分包單位分包項目經理施工班組長質量驗收規范的規定施工單位自檢記錄監理(建設)單位驗收記錄主控項目1纜線敷設和終接的檢測應符合規定條2建筑群子系統電、光纜的檢測應符合規定條3機柜、機架、配線架安裝檢測應符合要求條4信息插座安裝在活動地板或地面上時,接線盒應嚴密防水、防塵條一般項目1纜線終接應符合規定條2各類跳線的終接應符合規定條3機柜、機架、配線架安裝檢測應符合要求條4信息插座安裝應符合規定條5光纜芯線終端的連接盒面板應有標志條施工操作依據質量檢查記錄施工單位檢查結果評定項目專業 項目專業質量檢查員(
22、簽名): 技術負責人(簽名):年 月 日監理(建設)單位驗收結論專業監理工程師(簽名):(建設單位項目專業技術負責人)年 月 日注:本表由施工項目專業質量檢查員填寫;專業監理工程師(建設單位項目專業技術負責人)組織項目專業質量(技術)負責人等進行驗收:質量檢查記錄(檢測報告、質量證明文件)填寫在表D.0.1的附件表中。視頻安防監控系統檢驗批質量驗收記錄(GB50339-2003) 編號:070502 工程名稱分項工程名稱項目經理施工單位驗收部位施工執行標準名稱及編號專業工長(施工員)分包單位分包項目經理施工班組長質量驗收規范的規定施工單位自檢記錄監理(建設)單位驗收記錄主控項目1系統功能檢測.
23、1.1)條2圖像質量檢測.1.2)條3系統整體功能檢測.1.3)條4系統聯動功能檢測.1.4)條5視頻安防監控系統的圖像記錄保存時間應滿足管理要求.1.5)條一般項目施工操作依據質量檢查記錄施工單位檢查結果評定項目專業 項目專業質量檢查員(簽名): 技術負責人(簽名):年 月 日監理(建設)單位驗收結論專業監理工程師(簽名):(建設單位項目專業技術負責人)年 月 日注:本表由施工項目專業質量檢查員填寫;專業監理工程師(建設單位項目專業技術負責人)組織項目專業質量(技術)負責人等進行驗收:質量檢查記錄(檢測報告、質量證明文件)填寫在表D.0.1的附件表中。綜合布線系統安裝檢驗批質量驗收記錄(GB
24、50339-2003) 編號:070106 工程名稱分項工程名稱項目經理施工單位驗收部位施工執行標準名稱及編號專業工長(施工員)分包單位分包項目經理施工班組長質量驗收規范的規定施工單位自檢記錄監理(建設)單位驗收記錄主控項目1系統的輸入輸出不平衡度、音頻線的敷設、接地形式及安裝質量應符合設計要求,設備之間阻抗匹配合理.1條2放聲系統應分布合理,符合設計要求.2條3最高輸出電平、輸出信噪比、聲壓級和頻寬的技術指標應符合設計要求.3條4通過對響度、音色和音質的主觀評價,評定系統的音響效果.4條5功能檢測.5條一般項目施工操作依據質量檢查記錄施工單位檢查結果評定項目專業 項目專業質量檢查員(簽名):
25、 技術負責人(簽名):年 月 日監理(建設)單位驗收結論專業監理工程師(簽名):(建設單位項目專業技術負責人)年 月 日注:本表由施工項目專業質量檢查員填寫;專業監理工程師(建設單位項目專業技術負責人)組織項目專業質量(技術)負責人等進行驗收:質量檢查記錄(檢測報告、質量證明文件)填寫在表D.0.1的附件表中。有線電視系統檢驗批質量驗收記錄(GB50339-2003) 編號:070105 工程名稱分項工程名稱項目經理施工單位驗收部位施工執行標準名稱及編號專業工長(施工員)分包單位分包項目經理施工班組長質量驗收規范的規定施工單位自檢記錄監理(建設)單位驗收記錄主控項目1有線電視系統檢測應符合要求
26、條一般項目施工操作依據質量檢查記錄施工單位檢查結果評定項目專業 項目專業質量檢查員(簽名): 技術負責人(簽名):年 月 日監理(建設)單位驗收結論專業監理工程師(簽名):(建設單位項目專業技術負責人)年 月 日注:本表由施工項目專業質量檢查員填寫;專業監理工程師(建設單位項目專業技術負責人)組織項目專業質量(技術)負責人等進行驗收:質量檢查記錄(檢測報告、質量證明文件)填寫在表D.0.1的附件表中。接地電阻測試記錄編號:(06-09)/ 07-09 /(09-02) 單位工程名稱分部工程名稱分項工程名稱試驗日期施工執行標準名稱及編號項目經理施工圖號測試儀器型號、精度測試部位接地性質接地電阻()測試環境結 論設計值實測值溫度()天氣情況簡圖或備注:驗收結論施工單位項目專業質量檢查員(簽名):項目專業技術負責人(簽名):年 月 日專業監理工程師(簽名):(建設單位項目專業技術負責人)年 月 日