1、 地下洞室開挖支護主要工程量表 工程項目單位永久工程臨時工程合計引水系統地下廠房系統尾水系統小計主副廠房電梯井主變室母線洞出線洞通風系統運輸交通洞排水洞尾水檢修閘門室尾水支洞尾水調壓室尾水洞石方洞挖m36987053849014599770038820425951657115151404381065001850792133153283018035841116801915264石方井挖m392140270423305620550171920344708496345204斷層處理m36739439811409370558294211773490612586544121600070412噴砼C20,
2、d50150mmm336273627噴聚丙烯微纖維砼C20,d150200mmm37702783115372149170126702782421016697715109332199585141051410噴鋼纖維砼CF30,d150200mmm31880106218621382138掛鋼筋網 6.5200200mmt33.626161.31910.937.811.37.2421160276.11.42277.52砂漿錨桿22,L=4m根1041510415砂漿錨桿25,L=36m根9413990588686029630157085146492205388992654815砂漿錨桿28,L=4.
3、59m根9045170826116451432298384320742236789123258砂漿錨桿32,L=69m根7109604278101596612912912216723621708砂漿錨桿36,L=9m根7502721301491472234304485718571樹脂錨桿36,L=9m根2335227133445445粘結錨索 1000kN,L10.530m根394012653258258粘結錨索 1800kN,L2035m根8317930292292粘結錨索 3000kN,L2030m根375375375無粘結錨索1800kN,L2035m根542160702702無粘結錨索3000kN,L2030m根359359359格柵鋼架制安t75.4106.4278459.831.5491.3鋼支撐制安t64.137.620.480.351.596.2350.1350.1