午啪啪夜福利无码亚洲,亚洲欧美suv精品,欧洲尺码日本尺码专线美国,老狼影院成年女人大片

個人中心
個人中心
添加客服微信
客服
添加客服微信
添加客服微信
關注微信公眾號
公眾號
關注微信公眾號
關注微信公眾號
升級會員
升級會員
返回頂部
ImageVerifierCode 換一換

ConstructionStatementforPVC真空預壓發處理軟土地基施工方案樣本(14頁).doc

  • 資源ID:697984       資源大小:108KB        全文頁數:14頁
  • 資源格式:  DOC         下載積分: 15金幣
下載報告請您先登錄!


友情提示
2、PDF文件下載后,可能會被瀏覽器默認打開,此種情況可以點擊瀏覽器菜單,保存網頁到桌面,就可以正常下載了。
3、本站不支持迅雷下載,請使用電腦自帶的IE瀏覽器,或者360瀏覽器、谷歌瀏覽器下載即可。
4、本站資源下載后的文檔和圖紙-無水印,預覽文檔經過壓縮,下載后原文更清晰。
5、試題試卷類文檔,如果標題沒有明確說明有答案則都視為沒有答案,請知曉。

ConstructionStatementforPVC真空預壓發處理軟土地基施工方案樣本(14頁).doc

1、Proposed Design Philosophy,Construction,Installation and Monitoring Method ( as per 22.1.7 of section 1.0)1. Source of borrows pit indicating the location and quantityWe have license given by Vietnam authority to exploit a quantity of 8,400,000 m3 in Nha Be river and the location is in Nhon Trach di

2、strict,Dong Nai province.2. Physical proprieties of proposed fill materialThe sampling test of sand proposed to use is carried out according to AASHTO M45-89,C144-88 (see Test Result of Analyses of Sand component). The specific weight of the sand is 2.634,unit weight 1.5g/cm3,organic content 2.87% a

3、nd modules 2.52.3. Proposed method of statement and monitoring devices3.1 Method statementAccording to the geotechnical report of the site,the void ratio of the soft silty clay (e) is 2.377,and the permeability coefficient (Kv) 5.5*10-7cm/s. If we adopt “wick drains and pre-loading” method to reach

4、a soil bearing capacity of 50Kpa,75Kpa,100Kpa under the sites conditions,the consolidation period would be far beyond the proposed work period. For the purpose of reducing the consolidation period of foundation soil an overload should be added,though the loading would be 7.30m high to fulfill the be

5、aring capacity of 100Kpa. Obviously,this technique would bear a tremendous number of loading and unloading,which would also mean a high construction cost. The stability of side slope would also be difficult to monitor.Based on our previous experience of soft soil improvement of China coastal and Hie

6、p Phuoc Power Plant in Nha Be,15km Southeast of Hochiminh City,the pre-loading method is appropriate only for general area. In process area we suggest to adopted the following method (details see drawings “Proposed Process Area Plan” and “Proposed Process Area Zone” in page 6,7):f = 50 Kpa,vacuum pr

7、ecompression method;f = 75 Kpa,vacuum precompression and filling water (2.0m) on membrane method;f = 100 Kpa,vacuum precompression compound with loading method.The hydraulic filling of sea sand should be adopted under the elevation +2.80,which is specified in the tender documents. But based on our s

8、ite investigation report,we propose to use sweet water sand instead of sea sand for these following reasons:(1) Fine grade and high mud content of the sea sand;(2) No local facilities available such as hydraulic filling mud absorption. The backfill material (sweet water sand) will be delivered by ba

9、rges to the nearest dock and then carried by trucks to the site.3.2 Monitoring devicesAccording to the requirement of the tender documents,settlement gauge should be installed at 50mx50m grid and be measured by leveling instruments.In accordance with the requirement of the owner,the static penetrati

10、on test should be carried out at the 10 specified points and the penetration instruments should be buried through the whole depth of the compressible soil layers.The compaction test of filling materials in site should be carried out with heavy compactor. 4. Design philosophy to achieve the requireme

11、nt of the specification for soil improvement4.1 philosophy of vacuum precompression methodThe vacuum precompression method is used to consolidate foundation soil. This method consists in laying on the surface of foundation soil a sand bed,and in installing a drainage system with wick drains. The san

12、d bed drain line is buried and connected with vacuum system to form an air exhaust and a dewatering system. A set of airtight seal membranes is laid on the surface of the sand bed with its edge buried in soil. Thus,a negative pressure area within sand bed and foundation soil can be formed from air e

13、xhaust and dewaturing pumps. The vacuum method can reach a soil bearing capacity of 80KPa. Under the vacuum condition,soil is in the state of consolidating and pore water is discharged from soil under the pressure difference. The consolidation is completed when pressure of soil to be consolidated is

14、 reaching the same pressure of the drainage system.The philosophy of vacuum recompression method is that under the pressure difference (Pa-Pv),soil can be consolidated;Pa indicates atmospheric pressure and Pv indicates air pressure in the sand bed and the vertical drains. In the calculation of conso

15、lidation of the foundation soil,the RENDULIC-TERZAGE Theory and BICOT Theory of Consolidation can be adopted which are the same of those adopted in loading recompression method. The drop of the ground water table may also accelerate the consolidation of foundation soil beside the pressure difference

16、. The effective stress in the soil increases successively during the period of consolidation of the foundation soil with vacuum recompression method. The horizontal displacement of the soil is toward the center of the consolidation area from the beginning of the period of vacuum recompression,which

17、is different from the loading recompression method. So the stability of the foundation soil will not become a problem,and the required vacuum capacity can immediately be obtained and consequently,the period of vacuum recompression can be curtailed. Details is shown in drawings “Design Philosophy for

18、 Vacuum Precompression “ and “Flow Diagram of Vacuum Precompression Method” in page 8,9.Regarding the short work period of this project,the vacuum compound with loading recompression method is used in the process area where the required bearing capacity of the foundation soil is 100 Kpa. It has been

19、 proved from the theoretical calculation and our previous experience that the effects of vacuum and loading recompression methods on the consolidation can be coaxed. For this purpose,a soil capacity of 150 Kpa had been obtained in one of our previous project in the turbine house of Hiep Phuoc power

20、plant located at Nha Be district in Hochiminh city. During the vacuum process and under the pressure difference (Pa Pv),the pore water permeates into the vertical drains and the consolidation occurs. On the other hand,when using pre-loading method,the air pressure raises to Pp and the consolidation

21、occurs under the pressure difference (Pp Pa). Therefore,by using the vacuum compound with pre-loading method,the pressure can be increased to (Pp PV) and the consolidation effect would be improved as a result.The process of vacuum compound with pre-loading method is shown in drawing “The Process dra

22、wing of Vacuum Precompression combined with Loading Method” in page 10.4.2 Monitoring method The loading height and loading period of each step of general area is mainly controlled by the stability of the foundation soil. The settlement monitoring should be mainly concerned in this area.Because the

23、vacuum precompression method will not cause a soil stability problem,the site measurements have less significance comparable to pre-loading method. According to the requirement of the tender documents,settlement gauges should be installed at 50mx50m grid and be measured by leveling instruments. The

24、total settlement and settlement speed of the foundation in the loading area as well as the settlement or the rising height in the surrounded area must be monitored.The final settlement S can be calculated from the site monitoring data. The consolidation settlement Sc and the average consolidation ra

25、tio are obtained from this value. Moreover,the b value can also be calculated as well as the average consolidation coefficient Cv.According to the requirement of the owner,the static penetration test should be carried out at the 10 specified points and the penetration instruments should be buried th

26、rough the whole depth of the compressible soil layers.4.3 Preliminary geotechnical design for vertical drains and soil dischargeThe type SPB plastic drainage plate is adopted as the vertical drains in this project. The vertical drains would be distributed accordingly to an equilateral triangle patte

27、rn.Based on our previous experiences of soft soil improvement in the Mekong delta area and according to the work requirements from the project,we believe that the bearing capacity of processed foundation soil can be reached. However,it is arduous to reach the same requirement for the deformation. It

28、 needs a comparatively long period to attain a stable state of foundation soil settlement.In accordance with the tender document for the general area,the filling materials have to be well compacted to meet the building standard. Still,there are no relevant requirements of bearing capacity,so the ins

29、erting depth of the vertical drains should be less than the thickness of the soft soil layers to avoid the occurrence of extreme settlement. In the opposite case,that would imply a large additional quantity of loading materials and a soaring construction cost.Combining vacuum technique with loading

30、method,the different requirements of bearing capacity of process area can be firmly met. Obviously,the airtight condition during vacuum precompression is a critical factor to ensure a sufficient vacuum level. The depth of vertical drains in the process area is estimated to be 10m to ensure that the

31、end of vertical drains is within the soft soil layer which is about 14m depth. This will avoid any leakage from lower sand layer.The interval of the vertical drains in general area:L = 1.20mFor process area:f =5 t/m2,L = 1.2m.f =7.5 t/m2,L = 1.1m.f =10 t/m2,L = 0.7m.The initial geotechnical design i

32、s shown in two tables:“ Geotechnical Design of Vacuum Precompression Method of Process Area” and “ Geotechnical Design of Pre-loading Method of General Area” in page 11,12.5. Proposed vertical drains materialsThe SPB0-II type vertical drain is adopted from CHINA. The proprieties of the production me

33、et the requirements of Chinese standard DB3201Q18-87 (details is shown below in table “Quality Standard of SPB Vertical Drains “ ).uality Standard of SPB Vertical DrainsParameterUnitTypeRemarksSPB-1SPB-2SPB-3MaterialsPlastic strip core coated with a membrane filterSectiondimensionsWidthmm10021002100

34、2Thicknessmm3.54.04.5Longitudinal drain capacitym3/s15*10-625*10-6Side pressure 350KN/m2Tension strengthKN/10cm1.01.3Elongation is 100%Elongation1010Permeability coefficientcm/s5*10-45*10-4Capacity of insulating soilmm751530Elongation is 10%WetN/cm1020Elongation is 15%Linear weightg/m90-10090-100Uni

35、t lengthm200200Site clearingGeotextile layingPreparation of wick drainsinserting equipmentSite office andcontrol centerVacuum pipes installWick drains insertionSecond sand beddingFirst sand beddingMembrane layingAir extracting equipmentVacuum gauge and relay installAir extraction testPrecompression

36、by air extractionVacuum pressure and settlement readingsin the process areaEquipment removal of the precompression methodRefill and levelingWeir construc-tionControl and operation centerElectrical and light circuitRecheck the vacuum pumpsTemporary water pumps installationVacuum pipe preparationMembr

37、ane preparationSettlement gaugesInitial reading of settlement and relayResilience reading of ground settlementLeakage repair of membraneResults verification Flow Diagram of Vacuum Precompression MethodGeotechnical design of vacuum precompression methods of process areaProcess Area(m2)Average depth o

38、f soft soil(m)Bearing Capacity of foundation soil (t/m2)Interval of vertical drains(m)Depth of vertical drains(m)CalculatedFinal consolida-tion settlement(m)Depth of vertical drains(m)CalculatedFinal consolida-tion settlement (m)Estimated Settlement(m)Depth of vertical drains(m)CalculatedFinal conso

39、lida-tion settlement (m)128254 *_2528614.4151.213.42.8210.02.101.608.01.697.51.113.42.9510.02.301.808.01.90100.813.43.6010.02.692.408.02.35241428.00 *_37450.0013.3251.212.32.5910.02.101.608.01.697.51.112.32.7210.02.301.808.01.90100.812.33.3010.02.692.408.02.15354313.00 *_49603.0013.0551.0212.02.5310

40、.02.101.608.01.697.51.112.02.6510.02.301.808.01.90100.812.03.2310.02.692.408.02.15Note:The “ *” shows that the numerator means the proposed process area,which is extended from the area specified in the tender documents (denominator) by extending edge to 4.0 m.When f = 7.5t/m2,the settlement (1.8) is

41、 calculated by using the average settlement after vacuum precompression of the main building of Hiep Phouc power plant (1.55) added settlement occurred in consolidation period (90days) which is (90* 3)mm. Geotechnical design of vacuum precompression method in process areaSchemeProcess Area(m2)Averag

42、e depth of soft soil(m)Bearing Capacity of foundation soil (t/m2)Interval of vertical drains(m)Treatment Depth (m)Estimated Settlement(m)1 28254 *_2528614.4151.210.01.607.51.110.01.80100.710.02.402 41428*_3745013.3251.210.01.607.51.110.01.80100.710.02.403 54313 *_4960313.0551.210.01.607.51.110.01.80

43、100.710.02.40 Note:1) “ * ” :the numerator indicates the proposed process area,which is extended from the area specified in the tender documents (denominator). The edge of the specified area is extended by 4.0 m. 2) The length of vertical drains = treatment depth + sand bed thickness ( 2.0m) + end m

44、argin (0.20m) = 12.20m.Geotechnical design of pre-loading method in general areaSchemegeneral Area(m2)Average depth of soft soil(m)Interval of vertical drains(m)Single films drainageTreatment Depth (m)Estimated settlement (m)111093414.631.2010.01.029877015.221.2010.01.038861715.711.2010.01.0 Note:Th

45、e length of vertical drains = treatment depth + sand bed thickness ( 2.0m) + end margin (0.20m) = 12.20m.Geotechnical design of vacuum precompression method of general areaSchemeProcess Area(m2)Average depth of soft soil(m)Interval of vertical drains(m)Double films drainageSingle films drainageDepth

46、 of vertical drains(m)CalculatedFinal consolidation settlement (m)Depth of vertical drains(m)CalculatedFinal consolidation settlement (m)111093414.631.2014.601.76 / (0.5)10.0/ 8.01.30/ 1.0229877015.221.2015.202.1010.0/ 8.01.30/ 1.0238861715.711.2015.702.3110.0/ 8.01.30/ 1.02 Note:The length of vertical drains = soft soil depth + sand bed thickness ( 2.0m) + end margin (0.20m) = 12.20m.


注意事項

本文(ConstructionStatementforPVC真空預壓發處理軟土地基施工方案樣本(14頁).doc)為本站會員(正***)主動上傳,地產文庫僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對上載內容本身不做任何修改或編輯。 若此文所含內容侵犯了您的版權或隱私,請立即通知地產文庫(點擊聯系客服),我們立即給予刪除!




主站蜘蛛池模板: 普宁市| 英吉沙县| 紫金县| 灌阳县| 肃宁县| 洞头县| 通化市| 晋州市| 虎林市| 山西省| 武胜县| 肃北| 余庆县| 东台市| 高安市| 阳东县| 乐陵市| 乌鲁木齐市| 屯门区| 乌兰察布市| 延川县| 翼城县| 德保县| 镇原县| 株洲县| 连云港市| 东宁县| 雷波县| 长葛市| 蛟河市| 普定县| 庆元县| 凤庆县| 东乡县| 达州市| 托克逊县| 郸城县| 酉阳| 卢湾区| 兴文县| 洛浦县|